« Back to Search« Back to SearchSearch » Railway signalling works  Grand Port maritime de Dunkerque

Railway signalling works

  Dunkirk France — Grand Port maritime de Dunkerque
Published June 2, 2015 — Deadline June 30, 2015 (2 years ago)
|
Notice type
Contract notice
Optimizing operating limits between the national rail network and the Port Réseau Ferré - Signalling, Telecommunications and Energy realization of execution studies The implementation studies should continue the existing principles of current installations. These studies should integrate incoming from the train and avoid as much as possible, modifications of facilities in the country Rfp / Rfn interfaces: Each port entry point include an interface center. West port entry points: No. 3 on the road to St Georges Bar, No. 5 on the road huts dot the harbor entrance Central: No. 4 lane Px1 / Ro2 Installation Interface center will provide and provide the electrical conditions of the signaling circuits necessary for the RFN and RFP via "dry loop" .Centre interface materialized on the ground by 2 separate booths juxtaposed. One property of RFN, the other property of the RFP. Guardhouse with their own power supply to the rail network on which it depends (RFN or Rfp). Electrical conditions for RFN and RFP delivered in the interface centers.

Oppex helps organizations with a professional approach to public sector sales, to either grow their business locally or find new opportunities abroad. We are the largest source of public procurement data in Europe. We process and translate public tenders from over 1.000 local, national and international procurement portals and have acquired over 8 million tenders in our database.


Trusted By

KONE
NHS
3M
ABB