The project (pump-line) will be built despite Bridge in Spyrou Kyprianou west of the junction with the Pattihis Nikos Avenue in Limassol. The subject of this contract is the design, construction, operation and maintenance of a pumping station and associated buildings and other facilities as well as construction of two gravity pipelines from existing wells visit the network will carry waste water to the pumping station and from there with a pressure conduit channeled the wastewater to an existing discharge pipe, which sends sewage to the Monastery Factory. Duration of execution of the Contract: (a) Twelve (12) months from the date of implementation of the contract for design and construction (b) plus five (5) years on the operation / maintenance and (c) the right to renew the session / maintenance for a further five (5) years if both parties so wish. Within the framework of this contract, including the landscaping of the pumping station area and the fence construction as described in the tender documents. The contract will be implemented by the method Design / Construction / Operation and Maintenance (design, build, operate and maintain). The pumping station will be maximum capacity of 7 000 m³ wastewater a day and will pump sewage delivery head 25 m approximately.