« Back to Search« Back to SearchSearch » Engineering services  Bundesrepublik Deutschland, vertreten durch das Bundesministerium der Verteidigung, vertreten durch dasAmt für Bundesbau, vertreten durch den Landesbetrieb Liegenschafts- und Baubetreuung Niederlassung Trier, vertreten durch den Niederlassungsleiter

Engineering services

  Trier Germany — Bundesrepublik Deutschland, vertreten durch das Bundesministerium der Verteidigung, vertreten durch dasAmt für Bundesbau, vertreten durch den Landesbetrieb Liegenschafts- und Baubetreuung Niederlassung Trier, vertreten durch den Niederlassungsleiter
Published July 4, 2015
|
Notice type
Award notice
Winner
Bietergemeinschaft Eepi GmbH – PCE GmbH
Grounds for the operation: Based on the studies conducted so far, studies and preliminary planning (ES-construction) are to provide the services. Due to the more than 40 years of operation of the WTA reinforced concrete structures whose mechanical equipment and pipelines by defect, wear, damage, corrosion, etc. are abgängig. A further criterion of the safety status of the mechanical and electrical equipment is to be run, which is also not in line with current requirements. Measures description: implementation of the action for all the components and assemblies of water conditioning systems according to the following requirements: The planning of the technical installations shall be developed by the water legislation, the provisions of occupational safety and all environmental requirements. Water law needs to be agreed with the regional competent authorities. Development of the contributions for the water permit planning to WHG and LWG are just-if part of the task. The economic operation of the plant in terms of the economical use of resources in energy and personnel is to be considered as a top priority in the planning process. Planning is responsible for coordinating with the turned-planners for civil engineering structures (§ 41 HOAI). The plan is divided structurally into 3 sub-projects: - water technical system (WTA1). Treatment of dams waters (up to 700 m3 / d) with the system components Flake filtration, hardness increase (CO2 + Hydro-calcite) and sanitizing with chlorine bleach. - Wading, swimming and diving pools (WTS). Treatment plant with circulation mode (740 m3 / h) with plant parts Flake filtration and sanitizing with chlorine gas, as well as a coalescence separator. - Reinforced washer (PWA). All power installations and the entire electrical control, measurement and control technology are renewed. A variant of consideration in the form of a study is already available and will be provided by the client. 1,800,000 EUR (gross) estimated. Ordering: spring 2015. template ES construction: end of June 2015. Compilation of the individual technical contributions to an "overall" it-construction: the end of June 2015 presentation of the AFU construction (after approval) March 2016. Start of construction: July 2016. End of construction July 2018th

Oppex helps organizations with a professional approach to public sector sales, to either grow their business locally or find new opportunities abroad. We are the largest source of public procurement data in Europe. We process and translate public tenders from over 1.000 local, national and international procurement portals and have acquired over 8 million tenders in our database.


Trusted By

KONE
NHS
3M
ABB