Public tenders for medical in Freiburg Germany

Find all Medical tenders in the world.
Finding business opportunities has never been easier.

Results for medical. Make a new search!

Medical gases

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Universitätsbauamt Freiburg | Published November 14, 2015  -  Deadline December 16, 2015
cpvs
24111500

79106 Freiburg, Hugstetter Straße 53, University Hospital Freiburg: construction of the Interdisciplinary Tumor Center Freiburg (ITZ), media supply systems - medical gases.

Medical gases

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Universitätsbauamt Freiburg | Published March 31, 2016
Winner
Dräger Medical ANSY GmbH
cpvs
24111500

79106 Freiburg, Hugstetter Straße 53, University Hospital Freiburg: construction of the Interdisciplinary Tumour Centre in Freiburg (ITZ), media supply systems - Medical gases.

mattresses

Universitätsklinikum Freiburg | Published April 11, 2018  -  Deadline June 5, 2018
cpvs
39143112

Invitation to tender for a framework contract for the supply of mattresses for the University Medical Center Freiburg

Fire alarm system

 | Published March 12, 2015  -  Deadline September 13, 2015
Winner
Siemens AG
cpvs
45312, 45262

University of Freiburg Medical Center: New Center for Translational Cell Research - ZTZ, fire alarm system

Mobile patient cabinet

Universitätsklinikum Freiburg | Published July 11, 2018  -  Deadline August 9, 2018
cpvs
39151000

Acquisition of Mobile Patient Cabinets for the Interdisciplinary Tumor Center (ITZ) at the University Medical Center Freiburg

therapy chair

Universitätsklinikum Freiburg | Published July 13, 2018  -  Deadline August 13, 2018
cpvs
33192300

Acquisition of therapy chairs for the Interdisciplinary Tumor Center (ITZ) at the University Medical Center Freiburg

Dressing / niche car

Universitätsklinikum Freiburg | Published July 23, 2018  -  Deadline August 21, 2018
cpvs
33192300

Acquisition of bandage / niche wagons for the Interdisciplinary Turmorzentrum (ITZ) at the University Medical Center Freiburg

Tile, plate, sealing, Estricharbeiten

Vermögen und Bau Baden-Württemberg Universitätsbauamt Freiburg | Published December 22, 2014  -  Deadline May 22, 2015
cpvs
45431, 45262, 45432

University of Freiburg Medical Center: New Center for Translational Cell Research - ZTZ Type of service: tile, plate, sealing and Estricharbeiten scope of services: tiling work for the new laboratory building Center for Translational Cell Research (ZTZ) in Freiburg: 260 m² cement screed on separating layer produce about 200 m² of floor sealing surfaces produce about 180 m² floor tiles (mosaic tiles 2,5 / 2,5 cm) Lay incl. base training about 150 m² wall tiles (mosaic tiles 2,5 / 2,5 cm) embarrassed about 240 steps (step - and risers) with floor tiles (ceramic tiles 30 / 60cm) occupy approximately 350 sqm floor tiles (ceramic tiles 30 / 60cm) lay tenderers and their descendants and rental business owners have with their bids the relevant undertakings pursuant to § 5 LTMG, cost www as ". rp stuttgart.de/servlet/PB/menu/1359260/index.html "to submit.

Engineering services

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Universitätsbauamt Freiburg | Published October 22, 2015
Winner
Ingenieurbüro Meier
cpvs
71300000

University of Freiburg: new building of the Institute of Anatomy and Cell Biology, 79106 Freiburg, Baufeld V - Mathildenstraße, engineering services according to Part 4, Section 2 HOAI The new building for the Institute Anatomy and Cell Biology covers a floor space of 3819 m2, art surface TF ca. 1337 m2, traffic area (VFH + VFV) about 1 566 m2, net floor area (NGF) approx 6722 m2 with total construction costs amounting to 33.8 million EUR (gross), plus. Costs for development and demolition of approximately 1.6 million EUR (gross). Estimated costs for the Technical Equipment: cost group 410: approximately 466 000 EUR (gross); Cost group 420: approximately 655 000 EUR (gross); Cost group 430: approximately 1,737,000 EUR (gross); Cost group 470: approximately 1,942,000 EUR (gross); Cost group 480: approximately 430 000 EUR (gross). In Baufeld V currently are the building of the Center for Pediatric and Adolescent Medicine. The buildings to be rebuilt in the next few years elsewhere. This offers the possibility to develop in this area a new campus for teaching, research and training, which will be realized in sections. The University Medical Center Freiburg operates a heat-run thermal power station to supply the property of the University through a remote steam system with steam and produces climate cold water through absorption chillers at the hospital. The new building will be integrated into the existing technical infrastructure of the existing building on the construction site. This applies to the drinking-cold-emergency, the steam, condensate and air cold water supply, if necessary, the compressed air supply. The necessary infrastructure works and integration into the existing infrastructure are part of the action. As a preliminary measure, the site clearance is carried out. This measure is not part of the scope of services.

Engineering services

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Universitätsbauamt Freiburg | Published October 21, 2015
Winner
TCON Ingenieurgesellschaft mbh
cpvs
71300000

Freiburg, Freiburg University Clinic: construction of the new children's and youth clinic at the University Hospital, Engineering services under Part 4, Section 2 HOAI. The new building covers a floor space (NF) approximately 12 756 m2, engineering surfaces (TF) about 4 250 m2, traffic areas (VFH + VFV) approximately 6 750 m2 and a net floor area (NGF) of about 24 000 m2. The total construction costs (GBK) are approximately EUR 103 million net of costs for development and infrastructure projects in the amount of approximately 19 000 000 EUR. The Centre for Paediatrics (ZKJ) at the University Hospital Freiburg is housed in an area at the edge of the Central Hospital since 1946 in various numerous buildings Baualters. The housing stock is mostly in need of renovation or abgängig and is the functional requirements in any way more justice. Therefore, to be built elsewhere, a new building, which is directly connected to the core Hospital. The new building constitutes, inter alia, inspect u. Treatment areas, Clinical Laboratories, Radiology, Physiotherapy, dialysis, infant u. Children clinics, and facilities for research and teaching. The University Medical Center Freiburg operates a cogeneration plant to supply heat-run university property and other customers in the urban area of ​​Freiburg on a remote network and generated steam air cold water through absorption chillers at the hospital. The new building will be integrated into the existing technical infrastructure of the existing building in the Central Clinic and Institute clasp Breisacher Straße. This applies to the drinking-cold-emergency, the steam, condensate and Klimakaltwasser-, compressed air, oxygen and demineralised water supply and building automation. The necessary infrastructure works and integration into the existing infrastructure are part of the action.

Load-bearing structure design services

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Universitätsbauamt Freiburg | Published December 4, 2015
Winner
Wetzel & von Seht
cpvs
71327000

Freiburg, Freiburg University Clinic: construction of the new children's and youth clinic at the University Hospital, Engineering services under Part 4, Section 1 HOAI. Structural engineering for the building and the infrastructure channel, the connection to the stock and shoring, work phases 2-6 according to HOAI § 49 and Special Services (Early quantity determination, seismic safety, fire protection and engineering controls). The new building covers a floor space (NF) of approximately 12 756 m2. The total construction costs (GBK) are plus approximately EUR 103 million. Costs for development and infrastructure projects in the amount of approximately 19 000 000 EUR. The Centre for Paediatrics (ZKJ) at the University Hospital Freiburg is housed in an area at the edge of the Central Hospital since 1946 in various numerous buildings Baualters. The housing stock is mostly in need of renovation or abgängig and is the functional requirements in any way more justice. Therefore, to be built elsewhere, a new building, which is directly connected to the core Hospital. The new building constitutes, inter alia, inspect u. Treatment areas, Clinical Laboratories, Radiology, Physiotherapy, dialysis, infant u. Children clinics, and facilities for research and teaching. The University Medical Center Freiburg operates a cogeneration plant to supply heat-run university property and other customers in the urban area of ​​Freiburg on a remote network and generated steam air cold water through absorption chillers at the hospital. The new building will be integrated into the existing technical infrastructure of the existing building in the Central Clinic and Institute clasp Breisacher Straße. This applies to the drinking-cold-emergency, the steam, condensate and Klimakaltwasser-, compressed air, oxygen and VEWasserversorgung and building automation. The necessary infrastructure works and integration into the existing infrastructure are part of the action.

Load-bearing structure design services

Land Baden-Württemberg, vertreten durch den Landesbetrieb Vermögen und Bau Baden-Württemberg, Universitätsbauamt Freiburg | Published August 5, 2015  -  Deadline September 1, 2015
cpvs
71327000

Freiburg, Freiburg University Clinic: construction of the new children's and youth clinic at the University Hospital, Engineering services under Part 4, Section 1 HOAI. Structural engineering for the building and the infrastructure channel, the connection to the stock and shoring, work phases 2-6 after HOAI § 49 and Special Services (Early quantity determination, seismic safety, fire protection and engineering controls). The new building covers a floor space (NF) of approximately 12,756 m2. The total construction costs (GBK) are plus approximately EUR 103 million. Costs for development and infrastructure projects in the amount of approximately EUR 19 million. The Centre for Paediatrics (ZKJ) at the University Hospital Freiburg is housed in a complex at the edge of Central Hospital since 1946 in various numerous buildings Baualters. The housing stock is mostly in need of renovation or abgängig and is the functional requirements in any way more justice. Therefore, to be built elsewhere, a new building, which is directly connected to the core Hospital. The new building constitutes, inter alia, inspect u. Treatment areas, Clinical Laboratories, Radiology, Physiotherapy, dialysis, infant u. Children clinics, and facilities for research and teaching. The University Medical Center Freiburg operates a cogeneration plant to supply heat-run university property and other customers in the urban area of ​​Freiburg on a remote network and generated steam air cold water through absorption chillers at the hospital. The new building will be integrated into the existing technical infrastructure of the existing building in the Central Clinic and Institute clasp Breisacher Straße. This applies to the drinking-cold-emergency, the steam, condensate and Klimakaltwasser-, compressed air, oxygen and VEWasserversorgung and building automation. The necessary infrastructure works and integration into the existing infrastructure are part of the action.