Supply of industrial computer and PLC.

 | Published October 27, 2014  -  Deadline November 4, 2014
cpvs
30232700, 30214000, 30211400, 38500000

Delivery of one industrial computer and two PLCs.

Industrial robots

Przemysłowy Instytut Automatyki i Pomiarów PIAP | Published August 6, 2015
Winner
Supra Elco
cpvs
42997300

Delivery of research infrastructure in the form of a six industrial robot to waste machining, erected on the track chassis with the necessary equipment, including dedicated drivers in particular.

Warsaw: Construction of a research Pionkach Street. industrial 2

Instytut Techniki Budowlanej | Published November 9, 2016  -  Deadline November 8, 2016
Winner
KONSORCJUM: CHEM - MONTAŻ Sp. z o.o. PPUH STALBUD s.c.J i M. Majewscy, ul. Przemysłowa 2, 26-670 Pionki, kraj/woj. mazowieckie.
cpvs
71000000, 45000000

Construction of a research Pionkach Street. Industrial 2.

Warsaw: Construction of a research Pionkach Street. industrial 2

Instytut Techniki Budowlanej | Published July 21, 2016  -  Deadline August 24, 2016
cpvs
71000000, 45000000

The contract is for design and construction hall building research with the necessary technical infrastructure, intended for placement in the test stand - the wind tunnel. Hall building research with the necessary technical infrastructure will be located in the Department of Mazowiecki Building Research Institute in Pionki Street. Industrial 2, on the plot of the registration number 1464/68.

Supply of chemical products (industrial chemistry) by 4 Tasks ..

 | Published April 27, 2015  -  Deadline May 7, 2015
cpvs
24900000

Supply of chemical products (industrial chemistry) divided into four tasks: 1) Task 1 - Loctite and Teroson * 2) Task 2 - GT-85 and NICRO * 3) Task 3 - Preparations for the cleaning and maintenance of electronics * 4) Task 4 - * Orapi products.

Industrial machinery

Aquatech S.A. | Published February 24, 2017
Winner
PPH Orex – Rotomoulding Sp. z o.o.
cpvs
42000000

Object of the contract includes:

1. Delivery of production cell for rotational molding - 1 pc.

2. Delivery of modular forms - 1 pc.

3. Delivery forms spider - 1 pc.

4. Delivery of the modular form of the tank, so. Walnut - 1 pc.

5. Delivery of modular forms for rotational molding No. 4 tank water pościekowej - 1 pc.

6. Delivery and installation - sockets for connecting manufacturing large-size elements (robotic extruders) - 7 pcs.

According to Annex 2 to the Terms of Reference - Specification of the contract.

Purchaser expects the Contractor of delivery, installation and commissioning of the components of the contract - the machine brand new.

Object of the contract includes:

1. Delivery of production cell for rotational molding - 1 pc.

2. Delivery of modular forms - 1 pc.

3. Delivery forms spider - 1 pc.

4. Delivery of the modular form of the tank, so. Walnut - 1 pc.

5. Delivery of modular forms for rotational molding No. 4 tank water pościekowej - 1 pc.

6. Delivery and installation - sockets for connecting manufacturing large-size elements (robotic extruders) - 7 pcs.

Purchaser expects the Contractor of delivery, installation and commissioning of the components of the contract - the machine brand new.

A detailed description of the contract is contained in Annex 2 to the Terms of Reference - Specification of the contract.

Industrial machinery

Polskie Górnictwo Naftowe i Gazownictwo SA | Published December 16, 2016  -  Deadline December 23, 2016
cpvs
42000000

The subject of the Contract is: design, completion and delivery of PGNiG SA Branch Odolanów the conditions Odolanów DDP (Delivered Duty Paid) in accordance with Incoterms 2010 under cryogenic nitrogen removal from concentrate helium.

Industrial machinery

Aquatech S.A. | Published November 30, 2016  -  Deadline January 9, 2017
cpvs
42000000

Object of the contract includes:

1. Delivery of production cell for rotational molding - 1 pc.

2. Delivery of modular forms - 1 pc.

3. Delivery forms spider - 1 pc.

4. Delivery of the modular form of the tank, so. Walnut - 1 pc.

5. Delivery of modular forms for rotational molding No. 4 tank water pościekowej - 1 pc.

6. Delivery and installation - sockets for connecting manufacturing large-size elements (robotic extruders) - 7 pcs.

According to Annex 2 to the Terms of Reference - Specification of the contract.

Purchaser expects the Contractor of delivery, installation and commissioning of the components of the contract - the machine brand new.

Object of the contract includes:

1. Delivery of production cell for rotational molding - 1 pc.

2. Delivery of modular forms - 1 pc.

3. Delivery forms spider - 1 pc.

4. Delivery of the modular form of the tank, so. Walnut - 1 pc.

5. Delivery of modular forms for rotational molding No. 4 tank for water pościekowej - 1 pc.

6. Delivery and installation - sockets for connecting manufacturing large-size elements (robotic extruders) - 7 pcs.

Purchaser expects the Contractor of delivery, installation and commissioning of the components of the contract - the machine brand new.

A detailed description of the contract is contained in Annex 2 to the Terms of Reference - Specification of the contract.

Industrial machinery

Polskie Górnictwo Naftowe i Gazownictwo SA | Published November 15, 2016  -  Deadline December 19, 2016
cpvs
42000000

The subject of the Contract is: design, completion and delivery of PGNiG SA Branch Odolanów the conditions Odolanów DDP (Delivered Duty Paid) in accordance with Incoterms 2010 under cryogenic nitrogen removal from concentrate helium.

The subject of the Contract is: design, completion and delivery of PGNiG SA Branch Odolanów the conditions Odolanów DDP (Delivered Duty Paid) in accordance with Incoterms 2010 under cryogenic nitrogen removal from concentrate helium.

Given the specific nature of the contract, the Contracting Authority reserves that the design process can not be entrusted to subcontractors.

A detailed description of the scope and object of the contract, the manner and conditions of its performance and other requirements of the Purchaser are presented in Appendix 2 to the SETC Description of the contract and Annex No.3 hereto draft agreement.

Industrial machinery

PRINT Spółka Akcyjna | Published September 8, 2016  -  Deadline October 6, 2016
cpvs

Purchase and launching production line packaging.

Industrial machinery

Grupa INCO S.A. | Published August 17, 2016
Winner
ALLGAIER Process Technology GmbH
cpvs

Installation location: the existing buildings on the site.

It is permissible to submit variants.

Detailed information about the inquiry is available from the contact persons indicated in this inquiry.

At the request of the Bidder, the Employer may provide the detailed technical and technological assumptions, after the obligation to maintain confidentiality.

Inspection is possible only in a pre-agreed date, after the obligation to maintain confidentiality.

The Employer provides for the possibility of granting the Contractor supplementary orders not covered by the basic order and not exceeding a total of 50% of the executed order, necessary for its proper implementation, the execution of which became necessary as a result of the impossible situation earlier to predict if:

a) due to technical or economic separation of an additional order from the main contract would require incurring prohibitively high costs, or

b) the basic performance of the contract is dependent on the performance of the contract further.

Industrial machinery

Grupa INCO S.A. | Published August 17, 2016
Winner
BIKO-SERWIS Sp. z o.o.
cpvs

It is permissible to submit variants.

Detailed information about the inquiry is available from the contact persons indicated in this inquiry.

At the request of the Bidder, the Employer may provide the detailed technical and technological assumptions, after the obligation to maintain confidentiality.

Inspection is possible only in a pre-agreed date, after the obligation to maintain confidentiality.

The Employer provides for the possibility of granting the Contractor supplementary orders not covered by the basic order and not exceeding a total of 50% of the executed order, necessary for its proper implementation, the execution of which became necessary as a result of the impossible situation earlier to predict if:

a) due to technical or economic separation of an additional order from the main contract would require incurring prohibitively high costs, or

b) the basic performance of the contract is dependent on the performance of the contract further.

Industrial machinery

Grupa Inco S.A. | Published August 17, 2016
Winner
Amandus Kahl GmbH & Co. KG
cpvs

The control system allows you to work in automatic and manual mode with full control of process parameters affecting the productivity, quality and safety (PLC, control circuit devices, cable lines, sensors, etc.).

The system shall be supplied by the manufacturer of granulators.

Requirements:

- Expected performance granulator - a minimum of 2 t / h of finished product, the performance of the whole system - a minimum of 4 t / h of finished product.

- Type of granular material:

- Fertilizers with calcium supplements,

- Fertilizers,

- Organic and mineral fertilizers,

- Organic fertilizer.

- Implementation of the metric system.

- Installation location: the existing buildings on the site.

It is permissible to submit variants.

Detailed information about the inquiry is available from the contact persons indicated in this inquiry.

At the request of the Bidder, the Employer may provide the detailed technical and technological assumptions, after the obligation to maintain confidentiality.

Inspection is possible only in a pre-agreed date, after the obligation to maintain confidentiality.

The Employer provides for the possibility of granting the Contractor supplementary orders not covered by the basic order and not exceeding a total of 50% of the executed order, necessary for its proper implementation, the execution of which became necessary as a result of the impossible situation earlier to predict if:

a) due to technical or economic separation of an additional order from the main contract would require incurring prohibitively high costs, or

b) the basic performance of the contract is dependent on the performance of the contract further.

Industrial machinery

Grupa INCO S.A. | Published March 25, 2016  -  Deadline May 4, 2016
cpvs
42000000

Installation location: the existing buildings on the site.

It is permissible to submit variants.

Detailed information about the inquiry is available from the contact persons indicated in this inquiry.

At the request of the Bidder, the Employer may provide the detailed technical and technological assumptions, after the obligation to maintain confidentiality.

Inspection is possible only in a pre-agreed date, after the obligation to maintain confidentiality.

The Employer provides for the possibility of granting the Contractor supplementary orders not covered by the basic order and not exceeding a total of 50% of the executed order, necessary for its proper implementation, the execution of which became necessary as a result of the impossible situation earlier to predict if:

a) due to technical or economic separation of an additional order from the main contract would require incurring prohibitively high costs, or

b) the basic performance of the contract is dependent on the performance of the contract further.

Industrial machinery

Grupa INCO S.A. | Published March 24, 2016  -  Deadline May 4, 2016
cpvs
42000000

The control system allows you to work in automatic and manual mode with full control of process parameters affecting the productivity, quality and safety (PLC, control circuit devices, cable lines, sensors, etc.).

The system shall be supplied by the manufacturer of granulators.

Requirements:

- Expected performance granulator - a minimum of 2 t / h of finished product, the performance of the whole system - a minimum of 4 t / h of finished product.

- Type of granular material:

- Fertilizers with calcium supplements,

- Fertilizers,

- Organic and mineral fertilizers,

- Organic fertilizer.

- Implementation of the metric system.

- Installation location: the existing buildings on the site.

It is permissible to submit variants.

Detailed information about the inquiry is available from the contact persons indicated in this inquiry.

At the request of the Bidder, the Employer may provide the detailed technical and technological assumptions, after the obligation to maintain confidentiality.

Inspection is possible only in a pre-agreed date, after the obligation to maintain confidentiality.

The Employer provides for the possibility of granting the Contractor supplementary orders not covered by the basic order and not exceeding a total of 50% of the executed order, necessary for its proper implementation, the execution of which became necessary as a result of the impossible situation earlier to predict if:

a) due to technical or economic separation of an additional order from the main contract would require incurring prohibitively high costs, or

b) the basic performance of the contract is dependent on the performance of the contract further.

Delivery of moisture absorbers, materials for foiling the metro rail vehicles and industrial chemistry divided into three tasks.

 | Published December 12, 2014  -  Deadline December 19, 2014
cpvs
19520000

Delivery of moisture absorbers, materials for foiling the metro rail vehicles and industrial chemistry divided into three tasks: Task I - delivery of tapes, bubble wrap and stretch film Task II - supply of moisture absorbers Task III - delivery of industrial chemistry.

Industrial process control equipment

PGNiG TERMIKA SA | Published December 21, 2016
Winner
ABB Sp. z o.o.
cpvs
38810000, 72212100

The contract is performance by the Contractor to the Employer modernization of digital block BL7 and boiler K16, block BL8 and Central Dispatch Heat (CDC) in the Electrical Power.

Subject of the agreement include:

a) performance: inventory, documentation, technical executive and as-built documentation;

b) adaptation, delivery installation and commissioning of the necessary equipment;

c) the work of disassembly, assembly, works indoors, arrangements, preparatory work and Termination, the supervision over the implementation of all the work and coordination of work with the services of the Contracting Authority;

d) to carry out measurements, testing and commissioning of the modernized digital systems.

Due to the withdrawal of processor production process layer it is necessary to replace all units currently available on the market and encouraged in order to ensure the possibility of continuous operation blocks BL7, BL8, Cauldron K16 and CDC:

- Replacement of processor layers operator, wardrobes FSC, the operator station block BL7 and boiler K16.

- Replacement of processor layers operator, wardrobes FSC, operator station block BL8.

- Replacement of processor layers operator, the operator station CDC, common engineering CDC layers, blocks BL7, BL8 and boiler K16.

Industrial process control equipment

PGNiG Termika SA | Published October 19, 2016
Winner
ABB Sp. z o.o.
cpvs
38810000, 72212100

Due to the withdrawal of processor production process layer it is necessary to replace all units currently available on the market and encouraged in order to ensure the possibility of continuous operation blocks BL7, BL8, Cauldron K16 and CDC:

Service audit Polish actors in the field of applications of inventions, utility models and industrial designs

 | Published October 24, 2014  -  Deadline November 3, 2014
cpvs
79300000, 73210000

The contract is for the execution of Polish research entities, which in the last 10 years have made applications of inventions, utility models and industrial designs and obtained protection, in order to analyze the degree of effectiveness of the implementation of these solutions to the economy. The service is funded under the task 2.2 of the project system support effective use of industrial property in the innovation economy, implemented under the Innovative Economy Operational Programme, action 5.2 under the European Regional Development Fund ..

Industrial machinery

Green Office Ecologic Spółka z o.o. | Published June 21, 2016
Winner
3J Sp. z o.o. Sp.K.
cpvs
42000000

Of a complete processing line cartridgy to obtain ready for sale fractions:

- Magnetic metals,

- Aluminum,

- Plastic.

Plastics in pieces with a diameter greater than 35 mm, with no inclusions of metal and thoroughly dedusted powder toner. Fractions metal (Fe and Al) are also thoroughly free of dust.

Dedusting installation, outside dedusting same line has to pull dust from the room and filter the air.

The minimum acceptable processing capacity of 500 kg / h. Support automatic line: up to 5 people.