Public tenders for industrial in Gorzow-wielkopolski Poland

Find all Industrial tenders in the world.
Finding business opportunities has never been easier.

Results for industrial. Make a new search!
IndustrialPolandgorzow-wielkopolski

Industrial machinery

Ślusarstwo Usługowe Hajduk Sp. z o.o. | Published August 30, 2016  -  Deadline September 28, 2016
cpvs

industrial machinery

Industrial machinery

Zakład Utylizacji Odpadów Sp. z o.o. | Published April 17, 2015  -  Deadline May 3, 2015
cpvs
42000000, 34100000, 34144510, 43250000, 42996100, 34928480

Maszyny przemysłowe

Industrial machinery

Ślusarstwo Usługowe Hajduk Sp. z o.o. | Published August 24, 2016  -  Deadline September 28, 2016
cpvs

Parallel operation of multiple modules (design, drawing, nesting, a program to control the machine).

Common procurement vocabulary (CPV):

48000000-8 - Software package and information systems.

Industrial machinery

„Dinopol” Sp. z o.o. | Published July 16, 2016  -  Deadline August 25, 2016
cpvs
42000000

The contract is for the purchase and installation of production lines for the packaging of the pulp with integrated inking of raw materials in the framework of the Wielkopolska Regional Operational Programme for the years 2014 - 2020, Priority Axis 1, Measure 1.5, Measure 1.5.2. Project title: "The increase in international competitiveness through technological company DINOPOL inking system integration raw materials from the production of packaging from the pulp and implementation of new and improved products in the production plant in Raczycach." Expected technical requirements for the above. technological line:

- The yield of 100 kg of dry product for 1 hour to 600 kg per 1 hour.

- Fuel paper from a minimum of 100 kg for 1 hour to 600 kg per 1 hour.

- The energy lines guaranteed in terms of electricity consumption, measured by the amount of installed capacity up to 1 kg of dry product maximum

1.8 kW / 1 kg of dry product.

- Energy intensity drying guaranteed and measured based on the amount of kW needed for drying 1 kg of up to 4 kW / 1 kg of dry product,

- Raw inking system integrated into the machine production, processing the raw material for de-inking 600 kg per 1 hour.

- Remote connection and the ability to solve technical problems,

- The quality of the materials from which the components are manufactured, machine parts in contact with the liquid material made of stainless steel.

- Have CE certification,

- EC declaration of conformity,

- Manual or the card technical equipment required in English,

- The warranty on the production line at least 12 months.

CPV code: 42 000 000- 6 - Industrial Machinery; 42 800 000- 4 - Machinery for paper and paperboard production.

Industrial machinery

Zakład Utylizacji Odpadów Sp. z o.o. | Published May 13, 2015
Winner
ARCON POLSKA Sp. z o.o.
cpvs
42000000

The contract is for: - the supply of brand new, never unused and undamaged never before delivery of machinery and equipment under the project: "Development and modernization of the Department Małyszyńska 180 - Phase III Extension of the scope of the purchase of tangible fixed assets necessary for the implementation of the project- Supply of machinery and industrial equipment ", within parts: Part I - The subject of the contract is the delivery vehicle for the purposes of hook-type handling of municipal waste in the RIPOK-in, according to a detailed description of the object of the contract contained in Volume II -Szczegółowy of the Contract. The main codes of the Common Procurement Vocabulary (CPV) Motor vehicles 34.14.45.10-6 34.10.00.00-8 vehicles for refuse Episode II - the subject of the contract is to supply chargers to handle municipal waste on the platform parties, according to a detailed description of the object of the contract contained in Volume II -Szczegółowy of the Contract. The main codes of the Common Procurement Vocabulary (CPV) 43.25.00.00-0 Front loaders Episode III - subject of the contract is the delivery of equipment for pre-shredding bulky waste, according to a detailed description of the object of the contract contained in Volume II -Szczegółowy of the Contract. The main codes of the Common Procurement Vocabulary (CPV) Industrial machinery 42.99.61.00-5 42.90.00.000-6 Crushers - conduct performance test in accordance with the terms of the agreement contained in Volume III of the Terms of Reference, - the training of personnel designated Employer (no limit on the number of people) - performance of their obligations under the guarantee, - an indication of authorized service centers authorized by the manufacturer to perform warranty service. Employer allows partial bids for various parts of the contract the Contractor is obliged to perform the contract in accordance with the minimum parameters set out in the Terms of Reference Volume II - Detailed description of the order, at the same time presenting a statement of minimum parameters required by the Employer, for the parts I to IV. Basic parameters of the contract: a) The Purchaser does not provide for the granting down payments towards the performance of the contract. b) The Contractor is obliged to perform the contract according to the Terms of Reference (ToR), its Annexes and complex tender in accordance with applicable law. Małyszyńska 180, 66-400 Gorzow Wielkopolski., Precinct Chróścik. d) The Contractor is responsible under warranty for physical defects of the agreement existing at the time of the removal operations, as well as defects arising after delivery, but for reasons inherent in made subject of the order. e) If it is found during the existence of the defect removal operations, suitable to remove the Purchaser refuses to receive until you remove the defect. Reaction time - the time counted from the correct transfer of a defect Applications pending the Contractor efforts to determine the causes and to remove disadvantages. g) Maximum time to remove ustaki and repair equipment failure for the part I - IV parties determine to 14 calendar days from the date of notification. h) The Contractor can not free himself from liability under the warranty for defects caused by drawbacks, which he has made or due to improper methods of work performed by the Contractor. i) If the Contractor during the warranty period refuses to take the required steps or is in default in relation to the deadlines set out in the tender documents and in the Contract, the Purchaser may order replacements to make the necessary tasks to a third party at the expense of the Contractor. j) The Contractor shall comply with the principles of promotion projects, as defined for the Operational Programme Infrastructure and Environment 2007-2013, and perform labeling of the order, after consultation with the Employer, and in accordance with the principles set out and posted on the website http: // www.pois.gov.pl/. k) The Purchaser reserves the right to cancel the contract award procedure if funds from the European Union budget, which the Employer intended to use to finance all or part of the order were not granted to him. l) The Contractor shall ensure that the object of the contract provided the Purchaser will be brand new, free from physical defects and covered by a manufacturer's warranty. m) The warranty period will start from the date of signing (without reservations) by both parties acceptance protocol required minimum warranty for every product supplied has been indicated in Volume II of the Terms of Reference - A detailed description of the order. n) Under the guarantee the Contractor is obliged to make warranty inspections, maintenance, including the exchange of relevant controls, necessary to ensure smooth operation, the point of use and consistent with the recommendations Produ

Industrial machinery

Zakład Utylizacji Odpadów Sp. z o.o. | Published February 7, 2015  -  Deadline March 31, 2015
cpvs
34928480

Małyszyńska 180 - Stage III Extension of scope of work for the purchase of fixed assets needed to implement Project- Supply of machinery and industrial equipment "under parts: Part I - The subject of the contract is the delivery vehicle for the purpose of hook-type handling of municipal waste in RIPOK-in in accordance with the detailed description of the contract contained in Volume II of the Contract -Szczegółowy. The main codes in the Common Procurement Vocabulary (CPV) Motor vehicles 34.14.45.10-6 34.10.00.00-8 vehicles for refuse Part II - the subject of the contract is to supply the charger to handle municipal waste on the platform of parties, in accordance with the detailed description of the contract contained in Volume -Szczegółowy II of the Contract. The main codes in the Common Procurement Vocabulary (CPV) Front loaders 43.25.00.00-0 Part III - the subject of the contract is the supply of equipment for pre-shredding bulky waste, in accordance with the detailed description of the contract contained in Volume II of the Contract -Szczegółowy. The main codes in the Common Procurement Vocabulary (CPV) Industrial machinery 42.99.61.00-5 42.00.00.00-6 Choppers Part IV - the contract is for delivery of ten containers in accordance with the detailed description of the contract contained in Volume II of the Contract -Szczegółowy. The main codes in the Common Procurement Vocabulary (CPV) 34.92.84.80-6 containers and bins for waste and garbage - conducting performance test in accordance with the terms of the agreement contained in Volume III of the Terms of Reference, - the training of designated personnel Employer (no limit on the number of people), - performance of its obligations under the warranty - an indication of authorized service centers authorized by the manufacturer to perform warranty service. Employer allows partial bids on the individual parts of the contract the Contractor is obliged to perform the contract in accordance with the minimum parameters specified in the Terms of Reference Volume II - A detailed description of the subject at the same time presenting a statement of the minimum parameters required by the Employer, for the parts I to IV. The basic parameters of the contract: a) The Purchaser does not provide for the granting of the advance payment of the contract. b) The Contractor is required to perform the contract by the Terms of Reference (ToR), its Annexes and complex tender in accordance with applicable law. Małyszyńska 180, 66-400 Gorzow Wielkopolski., Precinct Chróścik. d) The Contractor is responsible under the warranty for physical defects of the subject of the agreement existing at the time of the removal operations, as well as defects arising after delivery, but for reasons inherent in the subject of the order made. e) In case of the removal operations, during the existence of the defect suitable for the removal of refuse collection Purchaser until the removal of the defect. f) In the event of defects, defects after final acceptance after giving notice to the Contractor in writing (e-mail) by the Purchaser is obliged to immediately respond to the notification of the Employer Response Time - the time counted from the correct transmission of the defect entries until the Contractor to take action to determine the causes and to remove disadvantages. g) The maximum time to remove the fault and repair the machine failure for the part I - IV part, provide for 14 calendar days from the date of notification. h) The Contractor shall not be released from its liability under the warranty for defects caused by the disadvantages which he has made or due to improper methods of work performed by the Contractor. i) In the event that during the warranty period the Contractor refuses to take the required action or is in default with respect to the time limits set out in the Terms of Reference, as well as in the Agreement, the Purchaser may have to make the necessary replacement operations to a third party at the expense of the Contractor. j) The Contractor shall comply with the principles of promotion projects, as defined for the Operational Programme Infrastructure and Environment 2007-2013, and the implementation of the labeling of the order, after consultation with the Employer, and in accordance with the principles set out and posted on the website http: // www.pois.gov.pl/. k) The Purchaser reserves the right to cancel the contract award procedure, if the funds from the budget of the European Union, which the Purchaser intended to use to finance all or part of the contract have not been allocated to it. l) The Contractor shall ensure that the object of the contract provided the Purchaser will be brand new, free from physical defects and covered by the manufacturer's warranty. The required minimum warranty for every product supplied has been indicated in Volume II of the Terms of Reference - A detailed description of the contract. n) The warranty Contractor undertakes to making an informed

Land use, external networks and renewable energy sources in Gorzowski Technology Centre Science and Industrial Park Sp. z oo in Stanowice investment projects under the Development of Science and Industrial Park of functions Center for Environmental Technology Transfer and Development of Young Inventors Club

 | Published April 25, 2015  -  Deadline May 11, 2015
cpvs
45231000, 45330000, 45310000, 45233140, 44622000, 71323100, 45261215

3.1 The contract is for: land use, external networks and renewable energy sources in the Gorzowski Technology Park of Science and Industry Sp. z oo in Stanowice 29 in the municipality of Bogdaniec. Object of the contract consists of the following parts and encompasses: Land use, external networks in Gorzowski Technology Centre of Scientific and Industrial Park Sp. z oo in Stanowice under the Scientific Development of the Industrial Park on the functions of the Environmental Technology Transfer Centre Scope: -Uzbrojenie Underground Pipework Installation of fire. Installation of sanitary sewer sewer system technology storm sewer system installation chilled water heating system) - WTP - renovation of technological equipment replacement WTP WTP

repair of 13 communal dwellings administered by ZGM in Gorzow Wielkopolski.

 | Published October 7, 2014  -  Deadline October 23, 2014
cpvs
45453000, 45310000, 45330000, 45333000

The contract is performing the repair of 13 communal dwellings located in buildings administered by ZGM in Gorzow Wielkopolski. Renovation industry include general construction, electrical, joinery, plumbing and stove-as contained in the ranges and technical specification of the performance and acceptance of the works. Are covered by this proceeding Sale Street .: 1) Borowski 12.22 2) Borowski, 33/7 3) Wyszynski 84/7 4) Industrial 17B / 4 of 5) Industrial 4.31 6) Waryńskiego 26.06 7) Wax 1A / 13 8) Industrial 2.28 9) Koniawska 8.3 10) Łokietka 11 / 3A 11) Garbary 6.5 12) Mailing 8.10 13) Brave 7.9 The term of the contract: 10 December 2014 ..

repair of 13 communal dwellings administered by ZGM in Gorzow Wielkopolski.

 | Published October 23, 2014  -  Deadline November 7, 2014
cpvs
45453000, 45310000, 45330000, 45333000

The contract is for the execution of repair 13 municipal residential units located in buildings managed by ZGM in Gorzow Wielkopolski. Renovation includes general construction industry, electrical, joinery, plumbing and stove-ranges in accordance with the attached specifications and technical performance and acceptance of the works. This proceeding are covered by Sale Street .: 1) Borowski 22/12 2) Borowski 33/7 3) Wyszynski 84/7 4) Industrial 17B / 4 5) Industrial 31/4 6) Waryńskiego 26/6 7) Wax 1A / 13 8) Industrial 28/2 9) Koniawska 8/3 10) Łokietka 11 / 3A 11) 5/6 Garbary 12) Mailing 10/8 13) Brave 9/7.

Industry specific software package

Zakład Mechaniczny Zalesie Marcin Śliwiński | Published July 13, 2016  -  Deadline August 24, 2016
cpvs
48100000

The contract is for the supply of:

- Software to create technologies and processes - 1 pc. Required for the implementation of new technology, the performance tools and equipment for bending and forming pipes and flow control devices - measuring for heat exchangers, braking and hydraulic systems.

Required technical parameters:

1.Tworzenie technology and processes.

2.Generowanie NC codes, inspection work is supported machines (machining center 5-axis).

3. Perform advanced simulation of production while avoiding the possibility of collision of the machine.

4.Obsługiwane operating system Windows 7, 8.1,10 (64-bit).

5.Modelowanie spline curves at least 5-th degree.

6.Edycja direct import solids, eg. Change rays rounding - changing hole diameters, - removing holes - removing rays - change the tilt walls, - change the depth of the pocket - 3D dimensioning and editing these dimensions.

7.Translatory bidirectional: STEP, IGES, Parasolid, DWG / DXF, STL.

8.Translatory directly into SolidWorks, Solid Edge and NX.

9.Operacje 2.5-5 axis milling.

10.Operacje drilling.

11.Możliwość verification technology prepared before starting the tasks on machine tools (machining simulation, collision detection and cross machining parameters etc.) based on the NC code.

12.Konwersja path 3-axis to 5-axis collision with the holder.

13.Optymalizacja feed depending on the cross-cut layer in the 3-5 axis operations.

14.Kopiowanie machining operations between files (copy / paste).

15.Zmiana database location (point against which to generate NC code) without the need for conversion path.

16.Zmiana feed rates without conversion path - dynamic time update processing.

17.Możliwość indication to treat only a selected area of ​​solid models / surface ...

Expansion of the Science and Industry Center for Environmental Technology Transfer.

 | Published October 11, 2014  -  Deadline October 27, 2014
cpvs
45000000

1 The subject of the contract are: construction multi associated with a change in use of farm buildings and warehouses on the function of environmental technology transfer center in Stanowice within the task: Development Park of Science and Industry on Technology Transfer Center features Środowiskowych.W the implementation of the contract to carry out works associated with the reconstruction, superstructure, development and redevelopment of objects: a) Building No. 1, b) Building No. 2-3, c) Building No. 4 - works (including but not limited to: foundation work, masonry, steel structures, reinforced concrete, roof - construction and covering, internal finishing works, finishing works external) - In

Storm-water piping construction work

Miasto Gorzów Wlkp. | Published November 13, 2015
Winner
Konsorcjum firm: Lider konsorcjum: Wuprinż S.A.; Partner konsorcjum 1: Terlan Sp. z o.o.; Partner konsorcjum 2: Hydrowat Przedsiębiorstwo Robót Budowlanych i Melioracyjnych Sp. z o.o.; Partner konsorcjum 3: Hydrowat Przedsiębiorstwo Robót Budowlanych i Melioracyjnych Kowalski Kazimierz
cpvs
45232130, 71320000, 71247000, 71248000

The contract works are design and construction for the system for rainwater discharge area of ​​the western part of the city of Gorzow Wielkopolski - catchment And along the second lane of Gorzow Wielkopolski. Within the framework of the S3 expressway with particular emphasis on: a) the areas covered by the local zoning plan area located between ul. Szczecin and Chróścikiem, including areas Kostrzyn Special Economic Zone; b) of residential, industrial, services, warehouses set out in the local plan for the area located between the industrial area and the western boundary of the city of Gorzow Wielkopolski .; c) land Waste Disposal Plant Sp. z oo in Gorzow Wielkopolski .; d) The area of ​​the streets: Pyrzyce, Kolobrzeska and Szczecin, including land intended for housing. As part of the investment "Construction of drainage system of rainwater from the area west of the city of Gorzow Wielkopolski." Foreseen are: - designing and obtaining necessary administrative decisions - the range is specified in the functional and operational program - supervising copyright - Execution of gravity sewers, - execution of sewage discharge, - completion of the pre-treatment of wastewater and regulate the outflow, the measuring system, - making the reservoir - the implementation of repair works of the existing collector DN 1600 and DN 1800 - the construction of the pipeline draining water from the drainage of the existing collector DN 1600 and DN 1800 - implementation of infrastructure and land development, including the liquidation of any conflicts.

Storm-water piping construction work

Miasto Gorzów Wlkp. | Published August 7, 2015  -  Deadline September 14, 2015
cpvs
45232130, 71320000, 71247000, 71248000

The contract works are design and construction for the system for rainwater discharge area of ​​the western part of the city of Gorzow Wielkopolski - catchment And along the second lane of Gorzow Wielkopolski. Within the framework of the S3 expressway with particular emphasis on: a) the areas covered by the local zoning plan area located between ul. Szczecin and Chróścikiem, including areas Kostrzyn - Słubice Special Economic Zone, b) of residential, industrial, services, warehouses set out in the local plan for the area located between the industrial area and the western boundary of the city of Gorzow Wielkopolski., C) land Waste Disposal Plant Sp. z oo in Gorzow Wielkopolski. d) The area of ​​the streets: Pyrzyce, Kolobrzeska and Szczecin, including land intended for housing. As part of the investment "Construction of drainage system of rainwater from the area of ​​the western part of the city of Gorzow Wielkopolski." Foreseen it is: - designing and obtaining necessary administrative decisions - the range is specified in the functional and operational program - supervising copyright - performing gravity sewer, - execution of sewage discharge, - completion of the pre-treatment of wastewater and regulate the outflow, the measuring system, - making the reservoir, - completion of repair works of the existing collector DN 1600 and DN 1800 - Construction of the pipeline discharge of water from the drain of the existing collector DN 1600 and DN 1800 - implementation of infrastructure and land development, including the liquidation of any conflicts.

Replacing the electrical installation at the premises in the municipal area of ​​ADM - 2 in Gorzow Wielkopolski

 | Published June 10, 2016  -  Deadline June 27, 2016
cpvs
45310000, 45311000

The contract is for replacement of the electrical system in municipal residential premises in accordance with the scope of work specified in the technical specification of the workmanship and the receipt of work and przedmiarach attached to siwz. This contract are covered installations in the following premises: 1. Waryńskiego 27/8 40/2 Silesia 2. 3. 4. Silesian Industrial 23/5 9/8 5. Dike 14/8 6. Green 53/2 is recommended to familiarize with the topography land and making the vision of the local operations as an auxiliary in the preparation of the offer. For the order to be used products approved for marketing and use in the construction industry (Article 10 of the Act of 07 July 1994 - Construction Law Dz. U. of 2013. Item. 1409, as amended.). As such products are considered to meet the requirements of Art. 5 of the Act of 16 April 2004 on building products (Dz. U. of 2014., Pos. 883).

Research and experimental development services

Global Trade MASH Spółka z ograniczoną odpowiedzialnością spółka komandytowa | Published January 5, 2016
Winner
Główny Instytut Górnictwa
cpvs
73100000

1. Scope of the order includes subcontracting research work required for the project Fri. "The use of products bioutylizacji wooden sleepers impregnated with creosote oil as an additive to solid secondary fuels", consisting in: a) the execution of physico-chemical, railway sleepers as a potential addition to solid secondary fuels; b) assessing the vulnerability of railway sleepers biochemical processes of decomposition; c) testing the possibility of using products bioutylizacji addition to solid secondary fuels; d) conducting the survey for trial batches of fuel; e) evaluation of the toxicity of the products obtained; f) the development of the assumptions of process technology products received in addition to a secondary fuel. under the Operational Programme Development of Intelligent 2014-2020 Action 1.1: Projects business R & D, Measure 1.1.1: Industrial research and development work carried out by the company.

Research and experimental development services

Global Trade MASH Spółka z ograniczoną odpowiedzialnością spółka komandytowa | Published July 18, 2015  -  Deadline August 24, 2015
cpvs
73100000

1. Object of the contract includes subcontracting research work required for the project Fri. "The use of products bioutylizacji wooden sleepers impregnated with creosote oil as an additive for solid secondary fuels", consisting in: a) the execution of physico-chemical, railway sleepers as a potential addition to the solid secondary fuels; b) an assessment of the susceptibility of the sleepers on the biochemical processes of decomposition; c) testing the possibility of using bioutylizacji products in addition to the solid secondary fuels; d) conducting the survey for trial batch of fuel; e) evaluation of the toxicity of the resulting products; f) the development of the assumptions of process technology, the products obtained in addition to a secondary fuel. under the Operational Programme Development of Intelligent 2014-2020, Measure 1.1: Projects business R & D, Measure 1.1.1: Industrial research and development work carried out by the company.

Ostrow Wielkopolski: Perform periodic inspections of annual general construction industry and energy performance certificates for buildings managed by the Municipal Department of Housing Ltd. in Ostrow Wielkopolski divided into 2 tasks.

 | Published July 13, 2016  -  Deadline July 25, 2016
cpvs
71318000

Task No. 1 subject of the contract is to perform periodic inspections of the annual general construction industry buildings managed by the Municipal Department of Housing Sp. z oo in Ostrow Wielkopolski, in accordance with Article. 62 paragraph. 1 point. 1 of the Building Act. The detailed scope of the contract includes: 1. Inspection and analysis of the technical condition. Analysis of the technical state based on the received technical documentation of the building. The rating is the size of consumption - assessment of the examination. Assess the extent of outstanding renovation works recommended in the previous protocol concerning the condition of the structure. The scope of the renovation and the sequence of their execution, taking into account the safety of people, environment, building structure, - conclusions and post-audit recommendations. Protocols drawn up by controls should include, among others, determine: a) the technical condition of the building elements under control, b) the size of wear or damage to the elements referred to in point. and c) the scope of the renovation and the order of their execution, d) methods and means of use of building components exposed to the harmful effects of the weather, e) other post-audit recommendations Task 2 The contract is for the implementation of energy performance certificates for buildings managed by the Municipal Department of Housing Sp. z oo in Ostrow Wielkopolski, in accordance with Article. 3 paragraphs. 1 and art. 15 paragraph. 1.2 of the Law on Energy Performance of Buildings of 29 August 2014. The detailed scope of the contract includes: The energy performance certificate separately for each building should include, among others, 1. identification of the building, 2. the energy performance of the building, 3. Recommendation defining the scope and type of construction - installation, which will improve the energy performance of the building ..

Machines and apparatus for testing and measuring

Gorzowski Ośrodek Technologiczny Park Naukowo-Przemysłowy Sp. z o.o. | Published July 18, 2015
Winner
Hexagon Metrology Sp. z o.o.
cpvs
38540000

The exact description of the contract is in Annex 1 to the tender documents. No. Name CPV 38540000-2 Machines and apparatus for testing and measuring 1.3 Basic parameters of the contract: 1.3.1 The Contractor is obliged to perform the contract according to the Terms of Reference (ToR), its Annexes and complex tender in accordance with applicable law. 1.3.2 Place of performance of the contract: Gorzowski Centre for Science and Technology Industrial Park Sp. z oo, Stanowice 29, 66-415 Bogdaniec. Offer is equivalent range with the same or better technical parameters, quality, functional meeting the minimum parameters defined by the Employer. In the event of equivalent solutions offer, after the Contractor is required to show that offered by a device meets the requirements set out in the order specification. Important for ordering features and parameters, is one that will keep all planned: installations, devices, to products: parameters and characteristics that allow primarily on the proper operation of other systems and / or devices and / or products in a manner established by the designer and allows at the same time get the parameters are not worse than assumed in the order specification, structural elements and structures: all the parameters are not worse than expected. At the same time it is important that an equivalent product is a product that is not identical, identical to the reference product, but it has a certain importance to the Employer, similar to the reference product characteristics and parameters ". Contractor is obliged to provide the documents listed in Annex 1 to the ToR, confirming compliance with certain provisions of the standards and certificates upon delivery. These should be adopted with the proviso that where the guarantee period is required should provide solutions that will allow it to keep the conditions and the warranty period. With the delivery of the order Contractor shall provide manuals and technical descriptions in Polish (manuals, parts catalogs, etc.) In paper and electronic form. 1.3.12 As part of the guarantee the Contractor undertakes to make free-of-service inspections / warranty, maintenance, including the exchange of relevant controls, necessary to ensure smooth operation, the point of use and are compatible with the manufacturer's instructions.

Scanners

Gorzowski Ośrodek Technologiczny Park Naukowo-Przemysłowy Sp. z o.o. | Published February 19, 2015
Winner
Leica Geosystems Sp. z o.o.
cpvs
38520000

The exact description of the contract is in Appendix 1 hereto. 2 Key codes in the Common Procurement Vocabulary CPV. Name CPV number 38540000-2 Machines and apparatus for testing and measuring 3 basic parameters of the contract: 3.1 The Contractor is required to perform the contract by the Terms of Reference (ToR), its Annexes and complex tender in accordance with applicable law. 3.2 Place of performance of the contract: Gorzowski Technology Centre of Science and Industrial Park Sp. z oo, Stanowice 29, 66-415 Bogdaniec. Offering a range equivalent with the same or better technical parameters, quality, functionality that meets the minimum parameters defined by the Employer. In the case of equivalent solutions offer it to the Contractor is required to show that offered by the device complies with the requirements set out in the order specification. 5 Artist of the PPA, which relies on the solution equivalent to those described by the Employer is obliged to indicate that a particular technology by him, installation, line, supply, meet the requirements specified by the Purchaser. 3.6 The burden of proof by the Contractor to keep the parameters required by the Employer lies with the tenderer. Important for ordering features and parameters are those that will keep all planned: - installations, devices, to products: parameters and characteristics that allow primarily on the proper operation of other systems and / or devices and / or products, - in the manner established by the designer and at the same time allowing for the values ​​no worse than assumed in the order specification, - structural elements and constructions: all parameters are not worse than expected. At the same time it is important that an equivalent product is a product that is not identical, identical to the reference product, but it has a certain importance to the Employer, similar to the reference product features and specifications. "The Contractor shall provide the documents listed in Annex 1 the Terms of Reference, confirming compliance with certain provisions of the standards and certificates upon delivery. These should be taken with the proviso that where the guarantee period is required to be provide solutions that will allow it to keep the conditions and the warranty period. With the delivery of the contract the Contractor shall provide instructions and descriptions technical in Polish (DTR, parts catalogs, etc.) in printed and electronic form. 3.12 under warranty Contractor undertakes to make gratuitous service inspections / warranty, maintenance, including the exchange of relevant items of equipment needed to ensure proper operation of the equipment in point of use and compatible with the manufacturer's instructions. 3.13 The Contractor shall bear the cost of transport (including parcels) associated with warranty repairs. 3.14 Service Equipment must be carried out by the manufacturer or the manufacturer's authorized service partner. 1 point 6 2.1 The Employer does not provide for the possibility of awarding supplementary contracts for the main contract. 3.1 partial bids shall not be accepted partial bids. A description of how to present variant offers and minimum conditions which must be met variants, if ordering allows them to submission. 4.1 The Purchaser does not allow the presentation of variants. Term of the contract

Scanners

Gorzowski Ośrodek Technologiczny Park Naukowo-Przemysłowy Sp. z o.o. | Published November 29, 2014  -  Deadline January 9, 2015
cpvs
38520000

I. A detailed description of the contract is in Appendix 1 hereto. The main codes in the Common Procurement Vocabulary CPV. Name CPV number 38540000-2 Machines and apparatus for testing and measuring basic parameters of the contract: 3.1 The Contractor is required to perform the contract by the Terms of Reference (ToR), its Annexes and complex tender in accordance with applicable law. 3.2 Place of performance of the contract: Gorzowski Technology Centre of Science and Industrial Park Sp. z oo, Stanowice 29, 66-415 Bogdaniec. Offering a range equivalent with the same or better technical parameters, quality, functionality that meets the minimum parameters defined by the Employer. In the case of equivalent solutions offer it to the Contractor is required to show that offered by the device complies with the requirements set out in the order specification. 5 Artist of the PPA, which relies on the solution equivalent to those described by the Employer is obliged to indicate that a particular technology by him, installation, line, supply, meet the requirements specified by the Purchaser. 3.6 The burden of proof by the Contractor to keep the parameters required by the Employer lies with the tenderer. Important for ordering features and parameters are those that will keep all planned: - installations, devices, to products: parameters and characteristics that allow primarily on the proper operation of other systems and / or devices and / or products, - in the manner established by the designer and at the same time allowing for the values ​​no worse than assumed in the order specification, - structural elements and constructions: all parameters are not worse than expected. At the same time it is important that an equivalent product is a product that is not identical, identical to the reference product, but it has a certain importance to the Employer, similar to the reference product features and parameters ". The Contractor shall deliver the documents listed in Annex 1 to the Terms of Reference, confirming compliance with certain provisions of the standards and certificates upon delivery. These should be taken with the proviso that where the guarantee period is required to be provide solutions that will allow it to keep the conditions and the warranty period. With the delivery of the contract the Contractor shall provide manuals and technical descriptions in Polish (DTR, parts catalogs, etc.) In printed and electronic form. 3.12 Under this warranty, the Contractor agrees to make gratuitous service inspections / warranty, maintenance, including the exchange of relevant items of equipment needed to ensure proper operation of the device at the place of use, and compatible with the manufacturer's instructions. 3.13 The Contractor shall bear the cost of transport (including parcels) associated with warranty repairs. 3.14 Service Equipment must be carried out by the manufacturer or the manufacturer's authorized service partner. 1 point 6. 2.1 The Employer does not provide for the possibility of awarding supplementary contracts for the main contract. Partial bids. 3.1 The Employer does not accept partial bids. A description of how to present variant offers and minimum conditions which must be met variants, if ordering allows them to submission. 4.1 The Purchaser does not allow the presentation of variants. The term of the contract.
  • 1