Call +44 800 9755 164

Public tenders for industrial in Brzeg-dolny Poland

Find all Industrial tenders in the world.
Finding business opportunities has never been easier.

Results for industrial. Make a new search!
IndustrialPolandbrzeg-dolny

Industrial machinery

PCC Rokita SA | Published June 10, 2015  -  Deadline June 10, 2015
cpvs
42000000

Maszyny przemysłowe

Industrial machinery

PCC Rokita SA | Published May 16, 2015  -  Deadline May 19, 2015
cpvs
42000000

Maszyny przemysłowe

Industrial machinery

PCC Rokita SA | Published July 14, 2015
Winner
Instal-Rzeszów Sp. z o.o.
cpvs
42000000

The subject of the call is "execution, delivery, unloading and installation of the water dripping wet T-402 with its isolation" within the PCC Rokita SA in Brzeg Dolny (56-120) Sienkiewicz Street 4, according to the design documentation developed by the Group Azoty Polish Chemical Consortium Sp. z oo

Industrial machinery

PCC Rokita SA | Published June 6, 2015  -  Deadline June 8, 2015
cpvs
42000000

1. The subject of the call is "execution, delivery, unloading and installation of the water dripping wet T-402 with its isolation" within the PCC Rokita SA in Brzeg Dolny (56-120) Sienkiewicz Street 4, according to the design documentation developed by the Group Azoty Polish Chemical Consortium Sp. z oo;

Industrial machinery

PCC Rokita SA | Published June 13, 2015
Winner
PCC Apakor Sp. z o.o.
cpvs
42000000

The subject of the call is "execution, delivery, unloading and installation of the water condensates V-23200800, together with its isolation" within the PCC Rokita SA in Brzeg Dolny (56-120) Sienkiewicz Street 4, according to the design documentation developed by the Group Azoty Polish Chemical Consortium Sp. z oo, in terms of: - Industry Cameras - Condensate and caustic wypadowego V-23200800, no studies: - 1201-02.08-501 REV.B. - 1201-02.09-515 Rev.B, - 1201-02.09-516 REV .B - 1201-02.09-517 - 1201-02.09-518 Rev.B - 1201-02.09-519 - 1201-02.09-520 - 1201-02.09-521 - 1201-02.09-522 - 1201 -02.09-523 - 1201-02.09-524 - 1201-02.09-525., - 1201-02.09-526 - 1201-02.09-527 - 1201-02.09-528 - 1201-02.09-529 - 1201 -02.09-530, - 1201-02.09-531, - 1201-02.09-532, - 1201-02.09-533, - plans and sections bowls, - 1201-00.05-05; 2. The general scope of work includes: - the execution and delivery to the premises of PCC Rokita SA tank - hot insulation performance, - installation of the water in the basin of reinforced concrete on the item. approx. -5,5m, - providing as-built documentation; 3. guidelines of hot insulation: - thermal insulation (eg. The type of Isover Ultimate), - thermal resistance> 400 degrees C, - bulk density of> 80 kg / m3, - tolerance thermal conductivity + 0 / -10%, - flammability> B2 ( DIN 4102 or equivalent), - net oplotcza: hexagonal wire> 0.7 mm - required thermal conductivity: 0,052-0,047 W / mK - protective coat - plate: Al-Zn coated on both sides coating, 55% Al, 43, Zc 4%, 1.5% Si), - coating thickness> 20 microns - the thickness of the sheet 0.8-1 mm - insulation must be done in a waterproof, - flashings should be sealed with silicone putty, 20-30 cm - insulation supporting structures should be arranged along the axis of the tank at not less than 1 m,

Industrial machinery

PCC Rokita SA | Published May 6, 2015  -  Deadline May 14, 2015
cpvs
42000000

The subject of the call is "execution, delivery, unloading and installation of the water condensates V-23200800, together with its isolation" within the PCC Rokita SA in Brzeg Dolny (56-120) Sienkiewicz Street 4, according to the design documentation developed by the Group Azoty Polish Chemical Consortium Sp. z oo, in terms of: - Industry Cameras - Condensate and caustic wypadowego V-23200800, no studies: - 1201-02.08-501 REV.B. - 1201-02.09-515 Rev.B - Rev.B 1201-02.09-516 - 1201-02.09-517 - Rev.B 1201-02.09-518 - 1201-02.09-519 - 1201-02.09-520 - 1201-02.09- 521 - 1201-02.09-522 - 1201-02.09-523 - 1201-02.09-524 - 1201-02.09-525. - 1201-02.09-526 - 1201-02.09-527 - 1201-02.09-528 - 1201-02.09-529 - 1201-02.09-530 - 1201-02.09-531 - 1201-02.09-532 - 1201-02.09-533 - plans and sections bowls - 1201-00.05-05 The general scope of work includes: - Execution and delivery to the premises of PCC Rokita SA reservoir; - Execution of hot insulation - Installation of the reservoir in the basin of reinforced concrete on the item. approx. -5,5m; - Provide guidance as-built documentation of hot insulation - Thermal insulation (eg. The type of Isover Ultimate) - Thermal resistance> 400 deg C - The bulk density of> 80kg / m3 - thermal conductivity tolerance + 0 / -10% - Flammability> B2 (according to DIN 4102 or equivalent) - Grid oplotcza: hexagonal wire> 0.7 mm - Required thermal conductivity: 0,052-0,047 W / mK - Protective jacket: - Sheet: Al-Zn coated on both sides coating of 55% Al, 43.4% Zc, 1.5% Si ) - Coating thickness> 20 .mu.m - The thickness of the sheet metal 0,8-1mm - Insulation should be made as watertight; - The flashing should be sealed with silicone putty; 20-30cm; - Insulation support structures should be arranged along the axis of the tank at least every 1m;
  • 1