Call +44 800 9755 164

Public tenders for industrial in Poland

Find all Industrial tenders in the world.
Finding business opportunities has never been easier.

Results for industrial. Make a new search!

Industrial machinery

Miejskie Zakłady Komunalne Sp. z o.o. | Published January 12, 2017
industrial machinery

Industrial machinery

P.P.H.U. Eurex – Janusz i Danuta Kędzia Spółka Jawna | Published December 13, 2016  -  Deadline January 20, 2017

The contract is for the purchase and assembly of machines, equipment and installations:

1. station to impregnate wood using pressure

2. machining center for wood

3. planer for wood

4. wielopiła wood.

Scheduled to purchase the station to impregnate wood using pressure - characteristics of the technical parameters:

The reservoir exploitation (autoclave) - Ø 2800 - 3200 mm, L 12,000 - 16,000 mm - working pressure 1-1.2 MPa, vacuum 0.08 MPa.

Storage tank solution - brine - 2 pcs. - Possibility of impregnation in two colors,

The control process of impregnation in a vending machine.

A hydraulic supply unit autoclave.

The team alternating cycle (ie. A series of Hamburg).

The team automatic dosing impregnate into the storage tank - mixer.

Platform trolley with the track chassis interior (set of safety belts).

Team loading and unloading trucks with automatic.

Assembly along with the implementation of regulatory documentation for the device.

The team of computer registration process, saturating the wood with software recording the following basic processes:

- The type and quantity of treated wood saturation,

- The type of waterproofing and its concentration,

- Impregnation process parameters.

- The amount absorbed by the wood impregnation

- The date of carrying out impregnation.

Planned to purchase the machining center for wood - characteristics of the technical parameters:

Axles - 6

The dimensional range

- Working stroke in the X - 4400 - 5000 mm

- Working stroke in the Y-axis - 2200 - 2900 mm

- Jump in the Z-axis - vertical - 500- 1000 mm

- The range of rotation around the vertical axis - the axis C - 720 ° (-360 ° - + 360 °)

- The range of rotation around the horizontal axis - the axis A - unlimited

- The maximum speed of movement in the X and Y -60-80 m / min

- The maximum speed of movement in the Z axis - 40-60 m / min

- Maximum speed of movement of the axis A and C - 50-60 rpm

The working head

- Power electrospindle - 3-17 kW

3 000 - 24 000

- Cooling of electro cars. exchange - liquid

Worktable

2

- The dimensions of the working surface of the table (base) - minimum 1800 × 500 mm

- The structure of the surface of the table - consoles beam - a minimum of 3 + 3 pcs

- Dimensions console beam mm 1400 × 120 × 75 +/- 10%

- Air Terminals - a minimum of 3 + 3 pcs

Equipment and electrical power

- Digital controller Numeric -CNC with software 2 posts - 1 pc

- PC with monitor, keyboard and mouse to communicate with the machine operator - 1 piece

1

2

6

1

additional equipment

1

1.

Planned to purchase wood planer - characteristics of the technical parameters:

Width (the circle cutting 93 - 125 mm) 20 - 230 mm

Working height (the circle cutting 93 - 125 mm) 10 - 160 mm

Number of spindles 6 including:

- 1 horizontal top

- 2 horizontal bottom

- 2 vertical right

- 1, the vertical left

Speed ​​- lower vertical spindle - the first - 6000 rev / min +/- 5%

Speed ​​- other spindle - 8000 rev / min +/- 5%

Feed with an electronic brake, infinitely variable 5 - 40 m / min.

Holder PowerLock on all spindles or equivalent

CNC control.

The planned purchase wielopiła - characteristics of the technical parameters:

The maximum cutting width of 300 - 350 mm

Feed speed - 5 - 35 m / min

2 speed adjustment blade (creeping and fast)

2 movable blade

3 blade mount for Quickfix

Motor Overload Protection

The electronic control unit including:

- Touch panel for conducting cutting lists, machine parameters and fault diagnosis

10 values ​​for the mobile blade

- Joystic for stepless adjustment of the mobile blade

Roll addictive for loading

automatic measurement

Connections:

- Extraction sockets in the cover diameter 250-300 mm

- Extraction air velocity = 30 m / s + - / 10%

- The total demand of air 5 300 m³ / h +/- 10%.

Industrial machinery

P.P.H.U. EUREX – Janusz i Danuta Kędzia Spółka Jawna | Published December 15, 2016  -  Deadline January 29, 2017

The contract is for the purchase and assembly of machines, equipment and installations:

1. station to impregnate wood using pressure

2. machining center for wood

3. planer for wood

4. wielopiła wood.

Industrial machinery

Poznańskie Zakłady Obróbki Mechanicznej Daniel Kaczała | Published December 21, 2016  -  Deadline January 26, 2017

Object of the contract provides:

1 - delivery with the launch of the press brake with the pressing force of 320 tons with accessories - 1 set .;

2 - delivery with the launch of the press brake with the pressing force of 36 tons with accessories - 1 set .;

3 - delivery with the launch of software for the design of the level of order to the finished NC program - 1 pc ..

Object of the contract also includes the supply of software for the design of the level of order to the finished NC program and its implementation / commissioning.

According to the description below and the Terms of Reference (hereinafter: ToR) available on the website:

https://bazakonkurencyjnosci.funduszeeuropejskie.gov.pl/publication/view/1014900

Industrial machinery

Poznańskie Zakłady Obróbki Mechanicznej Daniel Kaczała | Published December 23, 2016  -  Deadline January 31, 2017

Object of the contract provides:

1 - delivery with the launch of the press brake with the pressing force of 320 tons (1 piece) with instrumentation (1 set);

2 - delivery with the launch of the press brake with the pressing force of 36 tons (1 piece) with instrumentation (1 set);

3 - delivery with the launch of software for the design of the level of order to the finished NC program - 1 piece.

Object of the contract also includes the supply of software for the design of the level of order to the finished NC program and its implementation / commissioning.

According to the description below and the Terms of Reference (hereinafter: ToR) available on the website:

https://bazakonkurencyjnosci.funduszeeuropejskie.gov.pl/publication/view/1015228

Industrial machinery

Polnet Spółka z ograniczoną odpowiedzialnością i Wspólnicy Spółka komandytowa | Published January 5, 2017

The contract is for the purchase, installation and commissioning of servo - electric turret press. The contract scope includes:

1. preparation and production machines;

2. delivery, transportation, installation and commissioning of servo - electric turret presses, brand new, not EXHIBITION functional testing, acceptance testing and commissioning of the machine.

Industrial machinery

PANMAR Czekańska Szmyd Sp. jawna | Published January 5, 2017  -  Deadline February 13, 2017

The contract is for the supply of fixed assets needed to start production of a new product, ie .:

- Part I

Moulder - 1 set.

- Part II

The roller conveyor segregation plates - 1 set .;

- Part III

1 wide belt sander - 1 set .;

2. Grinder Matting - 1 set.

3. A device for curing a UV - 1 set.

- Part IV

1. The machine brushing 1 - 1 set;

2. The machine brushing 2 - 1 set .;

A detailed description of the contract for individual parts of I to IV is given in Annex 1 to the RFP stated on the website of the Purchaser from the date of publication of this notice.

Delivery - Splitting a four - 1 set.

A detailed description of the contract for the part I is given in Annex 1 to the inquiry made available from the date of publication of this notice on the website of the Employer.

Delivery - roller conveyor segregation plates - 1 set .;

A detailed description of the contract for Part II is given in Annex 1 to the inquiry made available from the date of publication of this notice on the website of the Employer.

Delivery - 1 wide belt sander - 1 set .; 2. Grinder Matting - 1 set. 3. A device for curing a UV - 1 set.

A detailed description of the contract for Part III is given in Annex 1 to the inquiry made available from the date of publication of this notice on the website of the Employer.

Delivery - 1. Machine brushing 1 - 1 set; 2. The machine brushing 2 - 1 set .;

A detailed description of the contract for Part IV is given in Annex 1 to the inquiry made available from the date of publication of this notice on the website of the Employer.

Industrial machinery

Zakład Zagospodarowania Odpadów Sp. z o.o. | Published January 6, 2017  -  Deadline February 17, 2017

1 The project is a service consisting in completing the task pn. "Construction of the line to the segregation of glass."

Object of the contract includes the works related to the design and construction of the segregation of glass for the Department of Waste Management Sp. z oo implemented in the "design and build" on the basis of the terms of reference annexed No. 5 hereto.

2) If it is determined that the works are performed not in accordance with the applicable provisions of the Employer may waive the payment and request a re-performance or withdraw from the contract due to the fault of the Contractor.

Accordingly, the Purchaser recommends that the contractor conducted a site visit to the area where the installation work will be carried out.

2.1 The contract is for the task pn. "Construction of the line to the segregation of glass."

2.1.1 The project is a service consisting in completing the task pn. "Construction of the line to the segregation of glass."

Object of the contract includes the works related to the design and construction of the segregation of glass for the Department of Waste Management Sp. z oo implemented in the "design and build" on the basis of the terms of reference annexed No. 5 hereto.

Requirements concerning the subject of the contract:

The contractor bears full responsibility for the task.

2) If it is determined that the works are performed not in accordance with the applicable provisions of the Employer may waive the payment and request a re-performance or withdraw from the contract due to the fault of the Contractor.

Accordingly, the Purchaser recommends that the contractor conducted a site visit to the area where the installation work will be carried out.

4) The Contracting Authority requires that the control and visualization system for the segregation of glass was integrated with the existing system control your usage by the Employer.

5) The Contracting Authority requires the submission with tender form:

a / technical documentation of devices, including separators, compressors, conveyors and others, confirming compliance with all the requirements specified for these devices in the order specification, attached as Annex 5 to the ToR,

b / drawing documentation, 3D visualization lines to segregate the glass and patterns of distribution of the waste stream, together with the mass balance, consistent with the assumptions contained in the order specification, attached as Annex 5 to the ToR,

c / list of proposed measuring, regulation and control devices with the installation diagram control and measurement.

Performance of the contract is divided into two stages

The completion of the first stage is to end riots and starting the installation.

The Employer shall notify the contractor in advance two months of the date of installation of the separator.

Industrial machinery

Technitynk Sp. z o.o. | Published January 12, 2017  -  Deadline February 3, 2017
A detailed list of items will be made available by the Employer. 

Technitynk Ltd. dofinasowanie obtained under the Operational Programme Development of Intelligent, financed by the European Regional Development Fund.

To make the necessary installation (dot. Production hall).

Execution, delivery and assembly of silos with accessories.

Construction of the bunker on the wet sand with equipment.

Purchase, delivery, installation and commissioning of production lines dry.

Purchase, delivery, installation and commissioning of the production line for the wet.

Purchase, delivery and installation of high-pressure washing devices with pre-treatment plants,

Purchase, delivery, installation and commissioning of the compressor.

A set of system of automatic control and visualization of technological line - the purchase, delivery and installation.

Purchase, supply and implementation of a system of automatic control and visualization technology line.

Technical consultancy.

Grodzisk Mazowiecki: Investor's supervision for the investment .: pn connection road in the industrial zone of the node A2: Construction of roads 1KDL in the industrial zone in the village Chlebnia and Natolin, the municipality of Grodzisk Mazowiecki, with drainage, lighting, exits and sidewalk

Gmina Grodzisk Mazowiecki | Published July 27, 2016  -  Deadline February 28, 2017
The subject of this contract is: Investor's supervision over the implementation of the project: The combination of the road in the industrial zone of the node A2: Construction of roads 1KDL in the industrial zone in the village Chlebnia and Natolin, the municipality of Grodzisk Mazowiecki, with drainage, lighting, exits and sidewalk. A detailed description of the contract includes the Terms of Reference ..

Grodzisk Mazowiecki: Connecting roads in the industrial zone of the node A2: Construction of roads 1KDL in the industrial zone in the village Chlebnia and Natolin, the municipality of Grodzisk Mazowiecki, with drainage, lighting, exits and sidewalk

Gmina Grodzisk Mazowiecki | Published July 22, 2016  -  Deadline February 28, 2017
The subject of this contract is: A combination of road in the industrial zone of the node A2: Construction of roads 1KDL in the industrial zone in the village Chlebnia and Natolin, the municipality of Grodzisk Mazowiecki, with drainage, lighting, exits and sidewalk. Construction work will be done on the basis of the project for the construction of roads 1KDL, 4KDL and 5KDL by the Office of Works Engineering Sp. z oo The basic scope of the contract: The contract is for reconstruction lane provincial road No. 579 in the area of ​​junction Grodzisk Mazowiecki in terms of the connection of local roads and 1KDL 4KDL the provincial road, with the construction of drainage and lighting. Fragment of the provincial road No. 579, located in the area of ​​the node Grodzisk Mazowiecki on the A2 motorway, was built as part of the construction of this node and is currently on the board of the General Directorate for National Roads and Motorways Branch in Warsaw, ul. Minsk, 25, 03-808 Warsaw. A detailed description of the contract includes the Terms of Reference ..

Krynica-Zdroj: Renovation of industrial floor in the warehouse for mineral water bottling plant in Krynica-Zdroj

Uzdrowisko Krynica - Żegiestów S.A. | Published July 27, 2016  -  Deadline January 31, 2017
The contract is for repair of industrial floor in the warehouse for mineral water bottling plant in Krynica-Zdroj, ul. Nowotarskiego of the area. approx. 650 m2. The present building is located in zone A spa protection. Object of the contract must be in accordance with the project documentation pn. Renovation of industrial floor in Stock Bottling Mineral Water developed by the Company Starbud MSc. arch. Ziemomysł Starkiewicz, ul. Kraszewski 163, 33-380 Krynica-Zdroj, the technical specification of the Workmanship and the Receipt of Work, construction law, art, engineering, safety and fire regulations. Bills of quantities are an auxiliary element to determine how and technology works, and the range of material specified therein is not binding for the determination of the contract, the Contractor shall verify przedmiarów on their own. In addition, the valuation should take into account the installation of two entrances to the warehouse wiper system trough of a length not less as the width of entry. The work will be carried out in stages / g schedule agreed with the investor, annexed to the agreement, the Purchaser reserves that approx. 3/4 of the scope of work the Contractor must perform within 7 weeks from the building site. Transfer of individual stages within the scope of the work will be followed within the time limits agreed between the Employer and the Contractor. In the course of staging a distinction should be part of a serviced from the rest of the magazine. Note: Work will be performed in the facility open and the Contractor is obliged to agree with the Purchaser of all activities undertaken in the Department ..

Krakow: Preparation in English comparative analysis of regional and national public policies in the field of industrial symbiosis and economy closed loop dot. EU-28 for the project Symbian, industrial symbiosis for sustainable regional development and resource efficiency in the economy of a closed circuit

Województwo Małopolskie | Published July 21, 2016  -  Deadline September 5, 2018
1. The contract is the preparation of the English comparative analysis of regional and national public policies in the field of industrial symbiosis and economy closed loop dot. EU-28 for the project Symbian, industrial symbiosis for sustainable regional development and resource efficiency in the economy of closed circuit. 2. Description of the order and conditions of execution are contained in the model contract attached as Annex 5 to siwz. 3. The size of the contract: about 65,000 zł net.

Kalisz: Services daylong nutrition for young people staying in Bursa School No. 1 for them. Janusz Korczak in Kalisz Street. industrial 1

Centrum Kształcenia Ustawicznego i Praktycznego | Published July 21, 2016  -  Deadline June 30, 2017
1. 2. The total area of ​​the cafeteria and auxiliary spaces is 90 m2. Industrial 1. 4. The Contractor shall prepare and issue four meals a day, 5 days per week for 120 pupils Bursa School No. 1 on school breaks including Christmas, school holidays and sickness absence student. 2015. poz.1256) 5. Contracting Authority reserves the right to place orders for meals on Saturday and Sunday after application. 6. The contracting authority reserves the right to place orders for meals divided into appropriate diet. 7. The Contractor is obliged to prepare and issue number of meals in accordance with the proper diet and the development of a ten-day menus, including a proper diet .. 8. The cost of the raw material used for food per person per day must be 11,00 zł. 9. The Contractor is obliged to timely distribution of meals in accordance with agreed with the Employer hours meals. Serving meals can be subject to changes that will result from the plans of educational classes or pupils will cover the Christmas break or holidays. 10. The demand for food will be deposited every day by the person designated to contact the authorized person of the Contractor according to the agreed schedule. During the term of the contract the Contractor to keep recruits in the tableware and removes from circulation vessel cracked and damaged. 12. Meals for dinners or other hot dishes must be issued with Bain marie warmers and sufficient temperature in accordance with applicable standards. The contractor is obliged to accept the changes.

Iława: Execution of project documentation for the expansion of the district road No. 1272N Rakowice - Lubawa on the sect. Lower market - Lubawa, ul. Industrial Lubawa

Powiatowy Zarząd Dróg w Iławie | Published July 27, 2016  -  Deadline May 31, 2017
The contract is for design documentation, hereinafter referred to as part of the instructions for contractors by the contract for an investment project implemented by the District Road Management in Iławie pn. Expansion of the county road No. 1272N Rakowice - Lubawa on the sect. Lower market - Lubawa, ul. Industrial Lubawa. The documentation must be in accordance with the Regulation of the Minister of Infrastructure of 2 September 2004. On the detailed scope and form of design documentation of technical specifications for execution and acceptance of construction works and the functional - utility (Dz. U. 2013.1129 ie.). A detailed description of the subject of the contract is contained in Appendix I hereto. Object of the contract includes: a) the execution of maps for design purposes, b) the performance of studies necessary to obtain a decision on environmental conditions of approval for the project, c) design documentation of construction and execution across all industries with the technical specifications of performance and acceptance of works, przedmiarami, the cost estimate investor d) obtaining: any conditions of the administrators of the network and to agree with them documentation, administrative decisions, opinions, permits, etc., necessary to obtain a decision on whether to allow the implementation of road investment, and the development and submission on behalf of the Purchaser of a complete application for a decision to authorize implementation of road investment. A detailed description of the contract was included in Appendix I hereto.

Spectrum analyser

Akademia Górniczo-Hutnicza im. Stanisława Staszica w Krakowie | Published January 13, 2017  -  Deadline February 21, 2017

Supply of portable spectrum analyzer with a set of antennas for Radio Technologies Laboratory (Team Laboratory Industrial Electronics and Electromagnetic Compatibility).

Oscilloscopes

Akademia Górniczo-Hutnicza im. Stanisława Staszica w Krakowie | Published December 28, 2016  -  Deadline February 2, 2017

Delivery oscilloscope with isolated inputs for battery-powered Electromagnetic Compatibility Laboratory and Power Systems (Team Laboratory Industrial Electronics and Electromagnetic Compatibility) within the framework of the project entitled. "The purchase of research equipment in the field of energy, along with land development and construction works." Delivery carried out in the laboratory part of the research and commercial Energy Centre. Oscilloscope portable, battery with insulated voltage probes with the unit. 1 (equipment brand new, manufactured no earlier than 2016).

The contract oscilloscope is a portable, battery powered with isolated inputs with voltage probes.

Delivery oscilloscope with isolated inputs for battery-powered Electromagnetic Compatibility Laboratory and Power Systems (Team Laboratory Industrial Electronics and Electromagnetic Compatibility) within the framework of the project entitled. "The purchase of research equipment in the field of energy, along with land development and construction works." Delivery carried out in the laboratory part of the research and commercial Energy Centre.

Oscilloscopes

Akademia Górniczo – Hutnicza im. Stanisława Staszica w Krakowie | Published December 24, 2016  -  Deadline February 1, 2017

Delivery of the oscilloscope with a set of high-voltage probes and current probes with a set of USB card-HPIB with advanced analysis of power systems and communication protocols for Electromagnetic Compatibility Laboratory and Power Systems (Team Laboratory Industrial Electronics and Electromagnetic Compatibility) within the framework of the project entitled. "The purchase of research equipment in the field of energy, along with land development and construction works." Delivery carried out in the laboratory part of the research and commercial Energy Centre.

Analysers

Akademia Górniczo-Hutnicza im. Stanisława Staszica w Krakowie | Published December 31, 2016  -  Deadline February 14, 2017

Delivery of the analyzer battery power systems two-quadrant along with control software and analyzing for Radio Technologies Laboratory (Team Laboratory Industrial Electronics and Electromagnetic Compatibility) within the framework of the project entitled. "The purchase of research equipment in the field of energy, along with land development and construction works." Delivery carried out in the laboratory part of the research and commercial Energy Centre.

Instrumentation and control equipment

Polska Grupa Górnicza Sp. z o.o. | Published January 5, 2017  -  Deadline January 18, 2017

Proceedings procurement sector is conducted in an open tender under the provisions of the Act of 29.1.2004 the Public Procurement Law (OJ 2015 item. 2164, as amended.) And based on the appropriate implementing rules.

The contract is for the supply of components for industrial automation Branches Polish Mining Group Sp. z oo in 2017 (no. of the product range 316-1).