Call +44 800 9755 164

Public tenders for industrial in Malawi

Find all Industrial tenders in the world.
Finding business opportunities has never been easier.

Results for industrial. Make a new search!

Mass Metrology Equipment - Malawi Metrology Center

United Nations Industrial Development Organization | Published February 9, 2017
cpvs

Supply of Mass Metrology Equipment for the Malawi Metrology Center - Market access  and trade capacity building support for agro-industrial products in Malawi

Invitation to Bid (ITB) - AO/rvcl Malawi High Performance Liquid Chromatograph (HPLC) Photochemical Reactor Certified Reference Materials

United Nations Industrial Development Organization | Published June 17, 2015  -  Deadline July 21, 2015
cpvs

Invitation to Bid (ITB) - AO/rvcl  Malawi The United Nations Industrial Development Organization (UNIDO) hereby invites you to submit a written proposal for procurement of:  High Performance Liquid Chromatograph (HPLC), Photochemical Reactor and Certified Reference Materials For the complete information concerning the Invitation to Bid (ITB) please visit UNIDO Procurement website or follow the link below: www.unido.org/procurement

Request for Proposal (RFP) Malawi Construction of a new heavy mass storage & upgrading of air-conditioning systems

United Nations Industrial Development Organization | Published June 18, 2015  -  Deadline July 17, 2015
cpvs

REQUEST FOR PROPOSAL (RFP) - 7000001081-AO/rvcl The United Nations Industrial Development Organization (UNIDO) hereby invites you to submit a written proposal for for Construction of a new Heavy mass storage & upgrading of air-conditioning systems. For the complete information concerning the Request for Proposal (RFP) please visit UNIDO Procurement website or follow the link below: www.unido.org/procurement

EOI - Malawi - Consultancy Services - Agro-Processing Special Economic Zone (AP-SEZ) – 08 2015

 | Published August 20, 2015
cpvs

Invitation to Express Interest in Consultancy Services MALAWI Agro-Processing Special Economic Zone (AP-SEZ) Procurement Reference number: MITC/PU/AP-SEZ The Malawi Investment and Trade Centre (MITC) has received funds from Enhanced Integrated Framework (EIF) Trust Funds and intends to apply part of the proceeds of these funds towards the cost of development of an Agro-Processing Special Economic Zone (AP-SEZ) in Malawi. MITC now invites suitably qualified local and international bidders (Firms) to submit sealed Expressions of Interest (EOI) for conducting a feasibility study and develop a comprehensive and robust roadmap as well as a comprehensive step-by-step implantation plan for the development of an AP-SEZ in Malawi. Background MITC, a parastatal (Statutory Corporation) under the Ministry of Industry and Trade has planned to develop an Agro-Processing Special Economic Zone (AP-SEZ) in order to support the promotion of commercial farming for priority National Export Strategy (NES) crops. MITC hence intends to engage a Consulting Firm to conduct a feasibility study for the development of an AP-SEZ in Malawi. Location Malawi Investment and Trade Centre, Aquarius House, Lilongwe, Malawi. Period of Assignment 70 working days spread within a maximum of 4 calendar months from the date of contract award. Capability and Experience (i) A profile of the firm, its organisation and staffing; and in the case of associations between two or more firms, or the name, address and profile of the participating firm(s), and the lead firm must be clearly identified (ii) Details of experience on similar assignments undertaken in the previous five (5) years, including their locations, focus on the firm’s role in similar assignments in the region or elsewhere (iii) Curriculum vitae of staff who could be available to work on the assignment (iv) The team shall comprise:- a. The following experts: Team Leader (Development Economics, Development Finance, Development Studies or Business Administration); AP-SEZ Specialist (Civil Engineering, Agricultural Engineering, Corporate Finance, Management Sciences) , Economist/Market Analyst (Economics, Industrial Economics, Development Microeconomics), Lawyer (Commercial Law), Gender & Community Specialist (Sociology, Development Studies, Community Development), Engineering Company (Civil Engineering) and ISO/Standards Specialist (Relevant Natural Sciences) b. All these experts must have advanced university degrees with terminal degrees being preferred. For the lawyer however, an LLB (Honours Degree) will be the minimum. c. All experts must have at least 10 years relevant experience d. The engineering company shall be subcontracted e. The Gender & Community Specialist and the Lawyer shall strictly be national experts. Short-listed Consulting Firms will be invited to submit proposals. Expressions of interest will be evaluated in accordance with the Public Procurement Act of 2003. Participation is open to all eligible bidders. Interested eligible bidders may submit expressions of interest to Malawi Investment and Trade Centre including an original copy and 2 copies of the EOI. Expressions of Interest must be delivered to the address below from 21st August, 2015 and the deadline for submission is Monday, 08th September, 2015 at 14:00 hours CAT. Late submissions shall be rejected. Attention: The Internal Procurement Committee Chairperson Malawi Investment and Trade Centre Aquarius House, First Floor, Eastern Wing, Private Bag 302, Lilongwe 3, Malawi Or through procurement@mitc.mw in PDF format. Tel: (265) 01 771 315

REQUEST FOR PROPOSALS 004/2015 INVESTMENT MAPPING EXERCISE FOR THE MANUFACTURERS SUB-CLUSTERS UNDER THE NATIONAL EXPORT STRATEGY (NES) MANUFACTURERS STRATEGY

United Nations Development Programme | Published April 27, 2015  -  Deadline May 15, 2015
cpvs

SELECTION OF A CONSULTING FIRM TO UNDERTAKE AN INVESTMENT MAPPING EXERCISE FOR THE MANUFACTURERS SUB-CLUSTERS UNDER THE NATIONAL EXPORT STRATEGY (NES) MANUFACTURERS STRATEGY TERMS OF REFERENCE Application deadline                           : 15th May, 2015 Estimated Starting Date                     : 15th June, 2015 Expected duration of assignment       : 45 person days PURPOSE OF THE CONSULTANCY The purpose of this Consultancy is to undertake an Investment Mapping of the Manufacturers Strategy sub-clusters, namely the Beverages, Agro-Processing, Plastics & Packaging and Assembly sub-clusters, in order to identify the various investment opportunities and to package them into marketable profiles. The exercise will support the Malawi Investment and Trade Centre (MITC) to develop a comprehensive and targeted investment promotion sub-programme for potential foreign direct investors and domestic investors in the Manufacturing Sector. The Investment Mapping is part of the broader Investor Facilitation Programme led by MITC and within the framework of the Trade, Industry and Private Sector Development Sector Wide Approach (TIP SWAp) which covers the Sugar Cane, Manufacturing and Oil Seeds Products Clusters. The consulting firm must strongly take into account existing guiding documents, among others, the Investment and Export Legislation, the National Export Strategy (NES), the Manufactures Strategy, the National Industrial policy, the MDGS II etc. The Consulting Firm will work in close collaboration with the Ministry of Industry and Trade (MoIT) and with the Malawi Investment and Trade Centre (MITC). SPECIFIC TASKS The consultancy is expected to cover the below captioned areas that are at the core of the Investment Mapping exercise. Particularly, the consultancy will cover the following tasks: Conduct a situation analysis of the said clusters in Malawi; Review and document the potential investment opportunities in Malawi under the referenced Manufactures sub-clusters namely, Beverages, Agro-Processing, Plastics & Packaging and Assembly; Work with all relevant stakeholders in order to understand the social, geographic and economically placed resources, features and facilities in the highly potential geographical areas that have a competitive and/or comparative advantage to the establishment of the said manufacturing sub-cluster investments in those geographic areas; Interview a sampled number of investors operating in the respective sub-clusters of the Manufacturing sector in order to understand the operating constraints in those sub-clusters so as to ably strategize on the nature of industry/commercial entity that can locate in those sub-clusters; Assess incentives in the respective sub-sectors to be packaged as part of the investment proposition, with reference to the present incentives packages on offer; Refer to the list of imports into Malawi to determine possible import-substituting projects in the sub-clusters and prospective viable locations in Malawi; Determine export-oriented opportunity projects in the sub-cluster vis-à-vis national capability and international demand.  Also determine possible export markets for the sub-cluster components; Develop marketing profiles for the packaged opportunities; Develop detailed investor mapping  for the referenced sub-clusters of the manufacturing sector; Determine backward and forward integration within each sub-cluster; Quantify raw materials availability to sustain respective sub-cluster operations in respective areas/regions;

MW-Energy Sector Project - P099626

ESCOM LTD | Published December 25, 2015  -  Deadline January 20, 2016
cpvs

Addendum # 2 - Supply And Installation Of 33kv And 11kv Distribution Lines, Capacitor Banks,electrification Of Peri- Urban Areas And Underground Cables THEELECTRICITY SUPPLY CORPORATION OF MALAWI LTD. ProjectName: Electricity Network Strengthening and Expansion for Energy Sector Support Project (ESSP) IDA CreditNo. 49800-MW TenderReference No: ESC06/PJCT/ICB/G/FY2015-16 Subject ofProcurement: Supply and Installation of 33kV and 11kV Distribution Lines, Capacitor Banks, Electrification of Peri- Urban Areas and Underground Cables ADDENDUM #2 ItemNo. Section/Subject Clause/Subject Page BiddersQuery ESCOMReply 1 Lot 3,  Schedule6   GTP Final 12 Oct15, scope ofthe specification data sheet of the energy meter Clause11.1,MECHANICAL             &CONSTRUCTIONAL 59 As for onerequest of the energy meter: Able to parallel up external tamper detectors for several meters to detect same external tamper e.g.meter box opening. Please clarify whatis application Yes, it is required toavoid bypass in the box. All meters in the box to trip on external tamper upon opening of the box. 2 Lot3,  Schedule6   GTP Final12 Oct15, scope of the specification data sheet of the energy meter Clause11.1,DISPLAY INCDICATORS, FACILITIES                   &CAPABILITIES 61 Display meter's configuration at the CIU is needed to comply Which configuration? Pleasegive us more detailedinformation The minimumconfigurable  are as follows:- i) prepayment/postpayment mode of operation ii)Configurable emergency credit operation iii) Configurable disconnection on tamper iv) Configurabledisplay onTamper 3 Lot3,  Schedule6   GTP Final12 Oct15, scope of the specification data sheet of the energy meter Clause11.1,DISPLAY INCDICATORS, FACILITIES                   &CAPABILITIES 61 Asfor the specification of the meter: Display supply group code via short code, it is needed to comply Please explain and givemore detailed information. BISApproved 4 Lot3,  Schedule6   GTP Final12 Oct15, scope of the specification data sheet of the energy meter Clause11.1,DISPLAY INCDICATORS, FACILITIES                   &CAPABILITIES 61 Asfor the specification of the meter: Standardised short codes, it is needed to comply Please explain and give more detailedinformation. BISApproved 5 Lot3,  Schedule6   GTP Final12 Oct15, scope of the specification data sheet of the energy meter Clause11.1,Meter Indelible Markings 62 Asone request of Meter Indelible Markings: "Tested" sticker, it is needed to comply Themanufacture need to be given moreexplanations and clarifications. Need for a stickerthat is indelible marking stating ''Tested'' to confirm QA requirements 6 Lot3,  Schedule1,   technicalspecifications , chapter F, scope of the energy meter Clause6.1CONSTRUCTION FEATURES 252 Thecircuit breaker is the accessory of the energy meter We need to affirm whether the circuit breaker is needed to supply. Yes 7 Lot3,  Schedule6   GTP Final12 Oct15, scope of the specification data sheet of 4 Way Single Phase Energy Meter Pole Top Enclosure Clause11.2 63 4 WaySingle Phase Energy Meter Pole Top Enclosure Please affirm the way of installationof the pole topenclosure. By steel banding ontwo positions 8 Lot3,  Schedule6   GTP Final12 Oct15, scope of the specification data sheet of 4 Way Single Phase Energy Meter Pole Top Enclosure Clause11.2,Indelible Markings on Enclosure lid 63 For 4Way Single Phase Energy Meter Pole Top Enclosure, as one request of Indelible Markings on Enclosure lid:Tampering Shall BeProsecuted, it is needed to comply The manufacture need to be given moreexplanations and clarifications for this request. Indelible markingon the cover stating ''TAMPERING SHALL BE PROSECTED'' on the front cover isrequired. 9 Schedule 1 Chapter G  Technical specificationswooden poles andblocks 120 wehave checked all the specifications , there is no specification about wooden poles accessory Please provide the drawings?sample or detailed technical specifications in order that we could provide the rightproducts and better prepare the technical documents for this bid. The attached form (Attachment 1) is the list of the wooden polesaccessories Attached are ESCOMwooden pole specifications Stock Code 13/003 for 9m, Stock Code 13/005 for11m and Stock Code 13/007 for 12.6m. (See Attachment 5,6&7) 10 Lot 3,  Schedule6  GTP Final 12 Oct15, scope of thespecification data sheet of 16m? LV Aluminium Concentric Service Cable Clause6.6 41 16m? Concentric Service Cable , Alluminium with communication Please find the attachment 2.The cable's drawing and the specification data is provided, please confirm whether it can meet the requirement. Yes 11 Schedule 6 GTP 3.0- MV Conductors & 8.0 - 66KV Line Materials 3.1, 3.2,3.3, 8.2, 8.3, 8.4 29-31& 47 -49 ACSR Conductor100mm² DOG ACSR Conductor 175mm² Lynx AAC 100 mm2 Wasp Conductor 130mm2 ACSR Tiger Conductor 150 mm2 ACSR WolfConductor 175 mm2 ACSR LYNX Conductor Please confirm whether there is antiseptic oil for these conductors. If there is, whattypes of coatings are available, interior or steel-cored? No 12 Lot 4,  Schedule6   GTP Final12 Oct15, scope of  Cable Fault Locator and HV TestEquipment Clause13.0, 66 Asfor the cable fault locator, there are two types of this product. Please confirm thatthe loose instruments shall be required orthat the system could be installed in the vehicle. Loose Instrumentshall be required 13 Lot3,Schedule6   GTP Final 12 Oct15, scope of Distribution Box with MCCBs33kV or 11 /0.4kV Clause5.1 Asfor the 400V Cubicle Distribution Box, there is only one technical data sheet. The detailed drawing is requested kindly toprovide apart from the technicaldata sheet. Additional data isattached "Distribution box additional Data"  providing busbar and circuitbreaker ratings (See attachment8) 14 FBD ESCOMVol 1_Lines Final 12Oct15 & FBD ESCOM Vol_ II Lines Final 12Oct15 13.3 Marking for Transport 62& 66 (1)Plant, Test and Inspection Schedule, HSEQ and Others (2) All parts of the Contracted Equipment and the Contractor'sequipment shall be well-packed and protected against loss or damage during transport by sea and over land? Is this "Plant" samewith contractor's equipment or any difference? Yes, Plant is bothContracted equipment and Contractor'sequipment. 15 ForM.V. and L.V. Conductor, the Technical Specification is given in Chapter D of schedule 1 along with Technical data Schedule but inChapter I of Schedule 6, at page 29 to 31, again Technical Data Sheets have been given with different values. Please clarify whichare to be followed. Use Schedule 6- Pages 29to 31 Values 16 Losses and Impendences given in the Technical Specification of Distribution Transformer given in Chapter B of Schedule Iare different from the Technical Data Sheets given in Chapter I of Schedule 6 (Page 7 & 13). Pleaseclarify. Use Vol 1 Section IIIClause 1.2 ( c), Page  1-35 17 TheCreepage distanceof the Surge Arrestor given in the Sketch (Page 11, Chapter M) of Schedule I of Technical specification is 20mm/kV whereas in Technical Data Sheet at Page 55 of Chapter I of Schedule 6, it is 30 mm/kV.PleaseClarify. Use30mm/kV 18 PowerFrequency withstand Voltage (Dry & Wet) and Mechanical failing load of LV Bobbin Insulators is different in TechnicalSpecification (Chapter E Page 19)and Technical data Sheet (Page 27 of Chapter I of Schedule 6).Pleaseclarify. Use Schedule 6- Page 27Values 19 The TechnicalSpecification of the Concentric Cable 16 Sq.mm is not available. See Volume IISchedule 6 Item 6.6- Page 41 20 It ismentioned in Price Schedule No. 2 that the Vehicle and the Vehicle and Mobile Phones shall be as specified in Vol. 2 but no detailsavailable in Vol. 2. It is providein  Volume II Clause 12.2.2 and 12.2.3, Pages 60-61 21 ThePower Frequency withstand Voltage (Dry) for 33kV Fuse Cut Out given in Chapter E of Schedule I, is as 170 kV, where as in TechnicalData Sheet at page 33 of Chapter I of Schedule 6, is given as 95 kV. The creepage/Leakage distance is also given 610 mm where as inspecification it is 31 mm/kV (i.e. 31x36=1116 mm). Please clarify. Use 95kV and 610mmas per attached ESCOM Spec "10_116 Drop-out fuse-link assembly 33kV"- Stock Code 10/117 (See attachment 4) 22 TheGTP for 33 kV Polymer Post Insulator was not given. This may please be supplied. Refer to Volume IISchedule 6 Item 2.1 and 2.2, Page 26 with correction for 2.2 as in Item 23 below. 23 TheGTPs of the following Material given in Schedule 6 are incorrect:i.                    Para2.2 Page 26 ? 33 kV Polymer Pin Insulatorsii.                 Para 4.1 Page 33 ? 33kV Fuse Link Assemblyiii.               Para 6.2 Page 35 ? LV 4 CoreXLPE Insulated Armoured Cableiv.               Para 6.6 Page 41/42 ? 16 Sq.mm LVAlConcentric Service CablePlease provide the correctedGTPs of above. i) Para 2.2 33kV Polymer Pin Insulator, please note correct values are-Dry power Frequency Withstand Voltage, 50Hz kV 70Lightning impulseVoltage, 50Hz kV (peak) 170Minimum Specified mechanical failing load (SML) kN 45ii) Para 4.1 use attachment 4ESCOM spec. ''10_116 Drop-out fuse-link assembly 33kV'' - Stock Code - 10/117iii) Para 6.2 Use attachment 3 ESCOM specification ''03_025 Cable 185mm2600-1000V PVC-SWA-PVC 4-core Cu'' effectively replacing XLPE with PVC insulationiv) Para 6.6  Use industrial bestpractice, Refer to Item 10 above 24 Please Confirm that the material of Stay Insulators shall be Glazed Porcelain instead of GlazedComposite. Confirmed Glazedporcelain 25 Please confirm that Dimensions and ultimate load of wooden poles shall be as per GTP. As per the ESCOMspecifications attached. Refer to Item 9 above. 26 Inthe Drawing No. 5084014-POLE-E2001 (Alignment Pole), 33 kV Pin Insulators is shown as directly fixed on the Poles wherespecification of Polymer Line Post Insulator (Clause 6.1 of Chapter C), Line Post Insulators fixed with two Bolts is shown. Pleaseclarify which type of Polymer Insulators required for Alignment Pole. According to design eitherof it can be used 27 VolI According toSection I Instruction to Bidders, item 17.5 refers to sales tax and other taxes payable in the Employer's country, thosetaxes are applied to schedules 1 to 6 of Lot 4. How do we submit the breakdown of these taxes in the priceschedules? Breakdown can be specifiedas percentage or by adding anadditional column at right most side alongside Total price. All applicable taxes should be included.Please note the purpose of quoted taxes is for any adjustments for changes in tax rates between bid closing and contractaward. 28 VolI In Section I Instruction to Bidders, item 17.4 and 17.5 itis refer Schedule 6 ?Recommended spare parts, however this schedule is not available. Can you please send this schedule? Recommended spare partscan be quoted using Schedule 1 format 29 PriceSchedule According with item 1 of price schedule No 1, it isindicated a totalquantity of the cable supplied, 10.411 meters. However, in Volume II, 1.2 Scope of supply is mention a total quantity of11.500 to Lot 4. What is the total quantity of cable to supply and install for Lot 4? It is 10,411m as per Lot 4Price Schedule 30 PriceSchedule In item 6 of price schedule No 4 it is indicated a price for line e). These pricesare to keep or they are an example of how to submit the price of miscellaneous and day works? For each item we mustindicate twocurrencies as showed or just one? If it is local item itshould be in MWK & USD for overseas item. These prices shall be used for any future scope changes and not added to Final BidPrice. 31 PriceSchedule In item 3 of price schedule Nº 1, is refer a cable fault locator. In Volume IIin Facilities and Service for the employersays that the cable fault locator should be supply as per the TechnicalSpecification. In Technical Specification we only have the "Earth Fault Locator" in the Ring Main Unit chapter. Doesthe cable fault locator refers to this earth fault locator? Can you send technical specification of the cable faultlocator? For Cable Fault Locatorplease refer to Volume II Clause12.2.5, Page 62 and Volume II Schedule 6 Para 13.0 page 66 32 VolIII Regarding the volume III, section VII, general condition 14 says the contractorshall bear and pay all taxes, duties, levies andcharges assessed. Where do we put the breakdown of all this taxes, duties, leviesand charges? Breakdown can be specifiedas percentage or by adding anadditional column at right most side alongside Total price. All applicable taxes should be included.Please note the purpose of quoted taxes is for any adjustments for changes in tax rates between bid closing and contractaward. In the Structure BOQ, theBOQ for the detail of structure of 0.4 kV Line to be constructed with AAC 100 Sq.mm wasp, 3-Phase 4-wire was given, however theStructure detail for 0.4 kV ? Line to be constructed with ABC, 95 Sq.mm 3 Phase 4- wire is not given. Kindly arrange to provide theStructure BOQ for the Line to be constructed with ABC, 95 Sq.mm 3 Phase 4- wire. Please use  attachment 12 revised Lot 2 Price Schedule Rev 5 1) ABC Structure BOQ is provided inattached Structure BOQ Sheet items - O, R, P and Q. 2) Item 2.00 of Schedule 1 and 4 has been split using 2.00A for OHL and2.00B for ABC. 33 Schedule I /GT Requirement/ Clause 1.2 Informationto accompany bid 6 Please be informed at thetime of tender stage if may not be feasible for a bidder to submit these documents (sag tension charts, foundation details, GADrawing etc.) Kindly confirm whether the same can be submitted by the successful contractor at the time of detailed engineering forthe project YES 34 Schedule I /GeneralTechnical  Requirement Clause2.1.1 11kV power cables ? from line  to distribution transformers; cableshall run partly underground and also inair Please provide drawingdepicting arrangement of cable laying in air and underground Please use attachment 10drawing number 5084014-POLE-E2000 35 Schedule I /GeneralTechnical  Requirement Clause4.4 Earthingpractice Please provide drawingsfor prevailing earthing practicein Malawi Please use attachment 11drawing 'Substation earthing drawing' The Current practice is touse three(3) to four(4) earth mats using 4 x Earth Rods and 200m of 70mm2 Hard Drawn Copper BareWire 36 Schedule I /GeneralTechnical  Requirement Clause8.2.2 FencingWall Please provide the detailsof concrete fencing for distribution transformers Please not that this is NOT required in all lots 37 Schedule I /Technical  Specifications Clause1 Chapter B ?Distributiontransformer Transformer is to beoperated in parallel with existing transformers. Details of existing transformer/equipment need to bearranged Please note that NOTRANSFORMER will operate in parallel with another Transformer 38 Schedule I /Technical  Specifications Chapter B ?Distributiontransformer Please provide terminationarrangement of drawings of transformer Please Refer to drawingNo. Attachment 10 -5084014-POLE-E2000 39 Schedule I /Technical  Specifications Chapter B ?Distributiontransformer Copper earthing requiredand please provide earthing arrangement of existing transformers Please refer to 37above 40 Schedule I /Technical  Specifications Chapter E ?MV Fuse Cut out/ MV Fuse Link Technical Specifications Please clarify which typeof MV Cut Out fuse for 33kV and 11kV need to be used and kindly also provide the drawing for the same Please refer to 21above 41 Schedule I /Technical  Specifications Chapter F / Pole MountedDBand Price Schedule Lot 1 Transformer/BOQ We understand that PoleMounted Distribution Boxes required for Low Tension Side Connection for transformer, however we could find the quantity ofDistribution  boxes in the Price Schedule of Lot 1 Please note thatDistribution boxes are NOT required inLot 1 42 Drawing Number E1000 for11kV Cable Trench Trenchdrawing Please clarify the meaningof "CCT 1-5" and "CCT 1-3" CCT 1-5 means Circuit 1 to circuit 5. For Lot 1, the trench will accommodate from 1 x cable to 5 x cablesdepending on location and cable directions CCT 1-3 means Circuit 1 tocircuit 3. For Lot 4, the trench will accommodate from 1 x cable to 3 x cables depending on location and cabledirections 43 Civil Clarification withrespect to Underground Cables Drawing Number E1000 &E1002 From the drawing it is notclear that how many number of3 core cable need to be laid in one trench. Kindly clarify Refer to Item No. 42above 44 Price Schedule Lot1 Price Schedule Lot1 Lot 1  Transformer structures Items is not included in Price Schedule Please note thattransformer structure is NOT required in Lot 1 45 Schedule 1 / RMU /Technical Specification Technical Specification /BOQ 11kV 300sq mm single corecable for RMU connection is not included in price schedule. Please incorporate the same in price schedule and also confirm thequantity for the same Please note this cable isNOT required. 46 Technical Specifications / Chapter N / RMU / Clause1.3 ? type test We understand that ifmanufacturers has relevant type test reports for similar equipment for last 5 years then there is no need to repeat type test againon the same equipment. Please confirm Type Test isrequired 47 Technical Specifications Chapter I / Capacitor Bank/ Clause 2.4 Please clarify whether theautomatic power factor control panel in bidder's scope or employer's scope It is in Bidder'sScope 48 Technical Specifications Chapter I / Capacitor Bank Please provide uscapacitor bank arrangement drawings including CT/NCT/LA/Isolator ETC Use the current industrialpractice 49 Technical Specifications Chapter I / CapacitorBank Please provide capacitorbank foundation details Please note that they willbe mounted on existing H-pole wooden structure 50 Lot 4 Price Schedule 2 &Price Schedule 4 River crossing ofcable Please provide thearrangement of river crossing for cable Please note it is throughsteel pipe 51 Lot 4 Price Schedule 2 &Price Schedule 4 CableTunnel Please provide the detailsof cable tunnel The Tunnel is500x500mm 52 Price Schedule Lot 1.3 Item no.4.10 132kV lineStructure In Lot 1.3 BOQ shownwooden pole structure for 132kV line dead ends. As we understand in lattice steel structures. It is Wooden Polestructure 53 Lot 4 Price schedule 1 / Item3.3 / Cable fault Locator Please provide technicalspecification for Cable Fault locator Please find the technicalSpec in Vol II ?Schedule 6 Item No 13.0 54 Lot 1 & Lot 4 Cable TerminationArrangements Please provide cabletermination arrangement at various places Please see details Vol II-Schedule 1 -Chapter K 55 Drawing Number E2001,E2002, E2003 Please provide thedetailed drawings of various accessories to be used in the poles Use standardpractice 56 Price Schedule Lot1 Item No.1.6 Structural Isolation withD-fuses Please provide the drawingfor the same Please useBOQ 57 Section 3-EconomicEvaluation Clause No1.2 Transformer lossesspecified in section 3 Clause no. 1.2"Economic evaluation are different from the losses specified in Chapter B Technicalspecification Distribution Transformers Clause No 3.2.10 "Capitalization of Losses" Kindly Clarify which losses need to beconsidered Refer to 16 Above 58 Section VI- TechnicalSpecifications Chapter G Woodpoles As per section 6 TechnicalSpecifications Chapter G- Wood Poles Clause No 26 Stay Blocks and brace/Kicking/Concrete Blocks- itis mentioned stay blocks andbrace / concreate block shall be in accordance with Figure 5 figure 6(a) and 6 (b). but in tender document these drawing are notavailable. You are requested to clarify the following a)      Please furnish drawings ofstay blocks and brace/kicking/concrete blocks b)       Please furnish thedetails on the application of stay blocks and brace/ concrete blocks Please refer to drawings in the bid document- Attachment 9- 5084014-POLE-E1014A 59 As per Schedule 1-Technical Specification Clause no.1.3 Information to be approvedbefore commencing work 7 As per schedule 1?Technical specifications Clause No. 1.3 Page No 7 for all types of foundations are suitable calculations for foundation strengths,foundation drawings, loading data, pole deflection and fibre stress calculation, conductor clearance and election diagrams. Weunderstand that the loading calculation is required for alltypes of pole foundations particular for stress diagrams aresuitablecalculations for foundation strength will only be performed in tower structures not for the general pole erectedfoundations. So, please clarify YES 60 As per Schedule 1-Technical Specification Clause 1.5 serviceConditions 7 As per tenderspecification maximum outdoor temperature mention is -5 degrees. Please note in tender Ice loading details are not mentionedanywhere. Please clarify whether Ice loading calculation is required to consider or not Ice Loading calculationNOT Required 61 Price Schedule, Schedule No 1 Lot 2 Itemno 6.2 4 Way Single phase Splitdin Rail Prepayment Energy Meter Pole Top Enclosure Kindly furnish thedetailed specification and drawing ofenclosure Please refer tospecification  in Vol II Schedule 6 Item No 11.2 for the encloseddetailedspecification 62 ITB17.5(a) Volume I /Section II Bid Data Sheet C. Preparation ofBids 1-30 General Amendment toBid Named place ofdestination: DAP project sites at Northern, Central and Southern Regions in Malawi asrequired in Volume II ? Employer's Requirement ? Scope of Work 63 ITB17.5(d) Volume I /Section II Bid DataSheet C. Preparation ofBids 1-30 General Amendment toBid Named place ofdestination: DAP project sites at Northern, Central and Southern Regions in Malawi asrequired in Volume II ? Employer's Requirement ? Scope of Work All attachments mentioned have been sent to allprospective bidders who bought tender documents. The documents can also be viewed on www.escom.mw and UNDB. ESCOM LTD
  • 1