Public tenders for industrial in Mindszent Hungary

Find all Industrial tenders in the world.
Finding business opportunities has never been easier.

Results for industrial. Make a new search!

Contract award on during the "building energy development Mindszenti Elementary School in Dozsa-works combined with the use of renewable energy sources" adopted procedure

Mindszent Város Önkormányzata | Published June 12, 2015
Winner
Mátrix Bau 2002 Bt.;Mátrix Bau 2002 Bt.;ÖKOHÓD Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság;Központ-Bau Építő és Energetikai Korlátolt Felelősségű Társaság
cpvs
45300000, 45321000, 45421100, 45331000

Part 1 Subject: building energy development Mindszenti Dózsa works Elementary School combined with renewable energy utilization - Subsequent outer side of insulation Volume: 994.4 m2 attic floor insulation of 20 cm thick, rock wool insulation, 351.3 m2 flat roof insulation 18 cm thick waterproofing, 1295, Making 52 m2 external thermal insulation system based on polystyrene 15 cm thick complete with colored II. Color Group, 233 m2 skirting closed cell insulation 10 cm thick bead of plaster surfaces, thermal insulation around doors and shutters 779.06 m 3 cm thick, all 4 sides, creating 1,528.52 m2 scaffolding. Determination of Estimated value: 17,160,000 HUF. Part 2 Subject: Development of building energy Mindszenti Elementary School in Dozsa-works in combination with renewable energy utilization - External window replacement quantity: 291.52 m2 demolition of doors and windows, installation complete. Determination of Estimated value: 16,540,100 HUF. Part 3 Subject: Development of building energy Mindszenti Elementary School in Dozsa-works in combination with renewable energy utilization - Construction of parallel solar system Rack roof with 4 S-FM, collector 2.55 for 10 pieces of roof hooks, 40 m CU pipe 22 insulation HT 22/13 , 1 set of taps, valves, fittings, tube fittings, auxiliary materials. Determination of Estimated value: 2,326,800 HUF. Part 4 Subject: building energy development Mindszenti Dózsa works Elementary School combined with renewable energy utilization - the modernization of heating system Volume: Setting Demolition works (2 boilers and removing fittings), to carry out boiler house heating installation work (boiler-house electrical heating works, cabinet installation, 1 pcs weather after heating control equipment, 1 platinum sensor, 1 external temperature sensor equipment, 30 m heating cable installation, 30 m plumbing and industrial piping insulation, 30 m heating and plumbing intermittent pressure test, 30 m manual stainless exemption alapmázolás, 1 Installing faucet, building 1 solar pump equipment 1 expansion tank heating system 1 buffer tank is equipped with thermal insulation with a 10-piece ball valve, 1 x 2 "balancing valves, 2 x 1 ½ line regulator valve", 1 water strainer, 1 sludge separator, 1 air separator), radiators and radiator valve replacements 96 pieces (Radiator valves 96 pieces, radiator fitting with 96 units, thermostatic sensor head 96 pieces), completion of commissioning and calibration work 1 (heating system átmosatása, filling system softened water , venting and heating work test, test heating, radiators adjustment, boilers and heating systems installation.
  • 1