Public tenders for industrial in Grenoble France

Find all Industrial tenders in the world.
Finding business opportunities has never been easier.

Results for industrial. Make a new search!

Industrial robots

Institut polytechnique de Grenoble | Published December 23, 2016  -  Deadline January 24, 2017
cpvs
42997300

Purchases of industrial robots 4 6 polyarticulated axes.

Industrial robots

Institut polytechnique de Grenoble | Published March 15, 2017
Winner
Staubli Faverges SCA
cpvs
42997300

Purchases of industrial robots 4 6 polyarticulated axes.

CAMERAS FOR THE ACQUISITION OF GEOPHYSICAL LABORATORY AND INDUSTRIAL FLOWS

universite joseph fourier | Published September 18, 2015  -  Deadline October 7, 2015
cpvs

Cameras for the acquisition of geophysical laboratory and industrial flows Lot 1: Purchase of a video capture system with 8 synchronized cameras

Asbestos removal and deconstruction of two buildings for industrial use in Grenoble. The work to be carried out concerns asbestos removal (lot1) and the deconstruction (lot2) of two industrial buildings if

Epfld | Published April 24, 2017  -  Deadline May 22, 2017
cpvs

Asbestos removal and deconstruction of two buildings for industrial use in Grenoble

Removal of industrial waste of the county road laboratory. County Road Laboratory

Conseil general de l'isere | Published February 12, 2016  -  Deadline February 29, 2016
cpvs

Removal of industrial waste of the county road lab

Industrial machinery

CEA Grenoble | Published December 14, 2016  -  Deadline January 12, 2017
cpvs
42000000

Supply of climatic chambers large format for DH-CT-EN PV module testing.

Industrial robots

Institut polytechnique de Grenoble | Published April 5, 2017  -  Deadline May 2, 2017
cpvs
42997300, 42662100

Acquisition of a robotic welding unit for the additive fabrication of metal parts.

Industrial machinery

CNRS délegation Alpes | Published June 24, 2015
Winner
Ravni technologies
cpvs
42000000, 44334000

Supplies for the realization of the superconducting conductor of the hybrid coil on behalf of the National High Magnetic Field Laboratory in Grenoble (LNCMI).

Renewal of electrical equipment pretreatment of industrial wastewater on site slaughterhouses Fontanil Cornillon

Synd. mixte bassins hydrauliques isere | Published January 20, 2017  -  Deadline February 13, 2017
cpvs

Consultation No. 17SYMAA-AM01 Renewal of electrical equipment pretreatment of industrial wastewater on site slaughterhouses Fontanil Cornillon

Industry specific software package

CEA Grenoble | Published April 23, 2016  -  Deadline May 27, 2016
cpvs

Industrial software

Asbestos removal of two industrial buildings located at Pont de Claix. 3, rue de la Paix

Epfld | Published July 25, 2017  -  Deadline August 30, 2017
cpvs

Asbestos removal of two industrial buildings located at Pont de Claix

Assistance Mission for the financial evaluation of charges transferred under common business parks, industrial areas and public lighting

Grenoble alpes metropole | Published April 11, 2016  -  Deadline April 29, 2016
cpvs

Assistance Mission for the financial evaluation of charges transferred under common business parks, industrial areas and public lighting.

Industrial control software package

CEA/Grenoble | Published February 10, 2017
cpvs
48150000

LETI / DTSI / SPIM / LSGA provides development, implementation and support of software support to operational activities cleanrooms of Silicon Platform LETI including the Manufacturing Executing System software used to manage all its activities batch processing, processes and equipment. Leti wants to develop interfacing equipment clean rooms with this software, particularly with a view to clearing paper items from notebooks cleanroom. In this context, the LSGA wants to develop / enhance / reliability of general communication networks between the equipment and the software, gradually developing the interfacing between equipment and software, and develop appropriate protocols to initiate the removal of the paper batch log.

This market includes a firm (metrology equipment) and 2 optional phases (production equipment, priority or not).

The benefits consist mainly of the following tasks:

- Development of interfacing with metrology equipment,

- Specification and development ds automation SECS / GEM or ADS with the Manufacturing Executing System software CEA.

Industrial control software package

CEA/Grenoble | Published October 15, 2016  -  Deadline November 15, 2016
cpvs
48150000

The benefits consist mainly of the following tasks:

Deconstruction of two industrial buildings located in Pont de Claix (38800). The works to be carried out are the following: - Cleaning of premises, clearing; - Deconstruction, complete demolition of b

Epfld | Published August 29, 2017  -  Deadline September 27, 2017
cpvs

Deconstruction of two industrial buildings located in Pont de Claix (38800)

Industrial gases

CHU de Grenoble | Published June 12, 2015
Winner
Sol France
cpvs
24110000

Gas supply for the catering department of the University Hospital of Grenoble with provision of associated distribution equipment.

Industrial gases

CEA/Grenoble | Published April 21, 2015  -  Deadline May 12, 2015
cpvs
24110000

Supply of gas and special gas mixtures can be used in areas with dust controlled. They must meet criteria consistent with the requirements of microelectronics and materials (compliance levels of purity and cleanliness mostly). These supplies will form part of the market (s) on the orders (s) is (s) will be issued successive commands as required by the CEA. Each gas supply is a lot. The supply of specialty gases mainly concerns 55 (fifty five) gases or gas mixtures for all laboratories CEA Grenoble. Delivery points identified to date are: - the gas store CEA Grenoble deported to his provider (Air Liquide Voreppe 38) - the site "LITEN DTNM D2M" located on the University Jean Monnet in Saint-Etienne (42 ). Delivery points can be made to evolve in the scope defined in the specification and will be subject to amendment. Taking of predictive effect in October 2015. The purchase orders to markets will be over a period of 24 months and may be extended by the lifting of the No option called "Extension of purchase orders to the market for a period of a month. This option may be exercised within the limits of twice, an optional extension of the purchase orders to market in two months. Each exercise of option holder is notified at least fifteen days before the expiry of the contract to purchase orders.

Industrial gases

CHU de Grenoble | Published February 14, 2015  -  Deadline March 23, 2015
cpvs
24110000

Gas supply for the restore service Grenoble University Hospital with the provision of the associated distribution equipment.

soil remediation work (excavation and bioventing). These soil remediation of former industrial Becker site. It will take place in four phases: - Phase 1: Phase

Epfld | Published April 11, 2017  -  Deadline May 15, 2017
cpvs
90732300

soil remediation work (excavation and bioventing)

Supply of industrial modular buildings for the construction of a road maintenance center Auberives-en-Royans.

Conseil général de l'Isère | Published October 18, 2014  -  Deadline December 12, 2014
cpvs
44211100

Supply, delivery and commissioning of a county road maintenance center in industrialized modular building comprising a garage workshop square 296mètres an office building lockers square 117mètres and external technical area (salt shed and loading dock washing area, storage area of ​​materials) on a plot of 2 square 791mètres. The supply consists of the turnkey delivery of the building. The licensee shall provide all design services according to the response to the folder (or offr base variant) preparatory services necessary for the establishment, connection, manufacture, delivery, installation and commissioning. The General Council has made sustainability field. Optional tour of the site. This follows the termination of a previous contract, concluded after an appeal open competition, following the liquidation of the old provider. A building permit has already been granted under the old market, it is still valid.