As part of the development activities of his underground laboratory, the National Agency for Radioactive Waste Management (ANDRA), industrial and commercial establishment (EPIC) wishes to carry out the supply and installation of hydro equipment. Benefits include the following tasks: - task 1: supply and delivery of hydrogeological equipment; - Task 2: On-site installation of hydro equipment.
As part of the development activities of his underground lab,
The National Agency for Radioactive Waste Management (ANDRA), industrial and commercial establishment (EPIC) wishes to carry out the supply and installation of hydro equipment.
Benefits include the following tasks: - task 1: supply and delivery of hydrogeological equipment; - Task 2: On-site installation of hydro equipment.
For one of its industrial projects, ANDRA plans to set up a project management assistance contract in order to provide support in the organization and management of activities related to the reassembly and consolidation of the project. Total cost of ownership (CGP) of the project and the constitution of the associated costing file.
Establish a management plan and service monitoring tool, an evolving plan of the CGP and the project costing file, a note of organization and framing of the working group costing.
Support the project management for the development of the costing file.
Accompany the organization, the animation of the various follow-up meetings in the presence of the internal and / or external contributors.
The purpose of this contract is to provide cleaning services for industrial buildings and commercial buildings (offices, corporate restaurant, etc.) at the Aube storage center (CSA) and its railway terminal (TF) located in the department of Aube about 60 km from Troyes.
The cleaning services covered by this contract include a main mission, a secondary mission and a "related service" mission.
i. The main mission includes maintaining clean tertiary and technical premises.
As an indication, the total surfaces to be maintained are:
- painted cement: 5200 m
- carpet: 1200 m
- tiled floor: 1200 m
- false floor: 450 m
- Glaziery: 1150 m
- thermostur: 3000 m
- self-locking: 1330 m
- parquet flooring: 145 m
II. The secondary mission includes in particular the supply of equipment necessary for the proper performance of the service, the installation and replacement if necessary of the distribution equipment as well as the supply of associated consumables. It also includes punctual specific cleaning missions (soils, equipment and industrial installations).
III. The related service concerns any cleaning that does not fall within the scope of the missions mentioned above, and which, if necessary, will be triggered by means of an Andra service order (OS).
ANDRA wants to achieve a production run of prototype level waste storage containers. These prototypes are to be tested for both validate the achievement of performance and engineering data necessary for validation of the industrial feasibility of such objects. The production run is divided into two positions:
- Item A: design, manufacturing, transportation and technical assistance for the metal molds CS1 type and CS5
- Item B: concrete formulas of ownership already developed by ANDRA, manufacture and quality control of ILW containers prototype reinforced concrete CS1 and CS5 kind.
The already adopted concrete formulas and studied by ANDRA are self-compacting. Prototypes have a volume of between 4 and 6 m
Item A: design and manufacture of metal molds.
The station A includes the following steps:
- Item A - Step 1: design of metal molds,
- Item A - Step 2: Production of metal molds,
- A post - Step 3: reception molds on site production of concrete containers.
Position B: manufacture of ILW containers.
The station B includes the following steps:
- Item B - Step 1 (farm): ownership of the reference formulation and verification of required characteristics,
- Item B - Step 2 (optional): ownership of an alternative formula and verification of the characteristics required,
- Item B - Step 3 (farm): supply of other elements necessary for carrying containers (frames, inserts, handling and lifting anchors, instrumentation)
- Item B - Step 4 (farm) production of prototypes 9,
- position B - Step 5 (optional): 12 manufacturing prototypes.
Dans le cadre du développement des activités de son laboratoire souterrain, l'Agence nationale pour la gestion des déchets radioactifs (ANDRA), Établissement public industriel et commercial (EPIC) souhaite réaliser des travaux de réaménagement de son carreau de fonçage (6 000 m
— tranche 1: réaménagement des bâtiments à usage d'ateliers/magasins,
— tranche 2: réaménagement des bâtiments à usage de bureaux et locaux sociaux,
— tranche 3: réaménagement des infrastructures de voirie et aires de stockage.
Réalisation de fondations, de voiles (murs) et de dalles associées à la réalisation d'un bâtiment à usage de bureaux:
— bâtiment en R+1 fabriqué en pré-murs,
— RDC = 960 m
— R+1 = 930 m
— réseau humides enterrés = 250 ml,
— réseaux sec enterrés = 60 ml,
Travaux à réaliser sur une période de 6 mois.
Réalisation de travaux de couverture d'un bâtiment à usage de bureau:
— étanchéités bitume auto-protégée avec isolation,
— mise en place d'une protection végétalisée sur complexe d'étanchéité,
— réalisation des lanterneaux de désenfumage compris leurs commandes,
— réalisation des descentes d'eaux pluviales,
— surface de toiture = 783 m
— ...
Travaux à réaliser sur une période de 3 mois.
Réalisation de travaux de façade bois d'un bâtiment à usage de bureau:
— réalisation du bardage bois et de l'isolation extérieure en élévation,
— fourniture et pose des liteaux horizontaux,
— réalisation des habillages des acrotères et des couventines en aluminium laqué,
— ...
Travaux à réaliser sur une période de 3 mois.
Réalisation de travaux de menuiseries extérieures d'un bâtiment à usage de bureau:
— châssis en aluminium: châssis ouvrants oscillot battant, à la française et à soufflet ou fixes,
— murs rideaux au RDC et R+1 compris châssis incorporés,
— fourniture et pose des portes d'entrées en aluminium vitrées,
— pose de protections solaires extérieures,
— ouvrages complémentaires; calfeutrement, nettoyage,
— ...
Travaux à réaliser sur une période de 3 mois.
Réalisation de travaux de serrurerie dans un bâtiment à usage de bureau:
— réalisation d'un escalier métallique,
— mains courantes,
— réalisation de passerelles,
— ...
Travaux à réaliser sur une période de 4,5 mois.