Industrial machinery

DONG Energy Thermal Power A/S | Published May 20, 2016
cpvs

Industrial machinery

Industrial machinery

DONG Energy Thermal Power A/S | Published May 11, 2016
cpvs

Industrial machinery

Gas distribution and related services

Energinet.dk | Published August 27, 2016
Winner
Bohlen & Doyen GmbH
cpvs

The Municipality of Copenhagen and CPH City and Port has decided to establish homes and offices in the former industrial area between HC Ørsted Power Plant and the harbour at Enghave Brygge. In this context, the natural gas transmission line from Amager to HC Ørstedsværket shall be redirected. This contract notice concerns the project to plan, design and build a new MR station that can feed Energinet.dk's re-engineered gas pipeline. The new MR Station shall be delivered as a turnkey delivery.

Command and control system

DONG Energy Thermal Power A/S | Published October 28, 2016  -  Deadline November 14, 2016
cpvs
42961000, 38810000, 48921000, 38570000, 72212000

DONG Energy Bioenergy & Thermal Power A/S (Employer) intends to establish a new biomass-fired CHP-unit at Asnæsværket (ASV). The new unit is called ASV unit 6 (ASV6). ASV6 is an industrial sized unit that produces process steam, district heating and power by combustion of woodchip based biomass fuels. The unit will be connected to existing infrastructure for process steam and district heating. The power plant site is placed directly in connection with the costal line. Fuel supplies are provided via ship, more specific via barges, or via truck as alternative.

Professional services for the gas industry

Energinet.dk | Published March 30, 2017
Winner
LINSCAN Advanced Pipe lines & tanks services
cpvs
76100000

The Contracting Authority wants to purchase an in-line inspection of three (3) pipelines during 2017, two (2) pipelines during 2018 and four (4) pipelines during 2019. Furthermore the tender includes an option of an intelligent survey with a multiple intelligent pig tool for one (1) pipeline. The option is to be seen as optional and will not be a part of the evaluation.

Professional services for the gas industry

Energinet.dk | Published October 6, 2016  -  Deadline October 24, 2016
cpvs
76100000

The Contracting Authority wants to purchase an in-line inspection of three (3) pipelines during 2017, two (2) pipelines during 2018 and four (4) pipelines during 2019. Furthermore the tender includes an option of an intelligent survey with a multiple intelligent pig tool for one (1) pipeline. The option is to be seen as optional and will not be a part of the evaluation.

Services related to the oil and gas industry

Energinet.dk | Published August 14, 2015
cpvs
76000000, 76510000

Services related to the oil and gas industry

Industry specific software package 2015 / S 133-245003

Fredericia Kommune | Published July 14, 2015
cpvs
48100000, 48000000, 72200000

Branchespecifik programpakke 2015/S 133-245003

Industry specific software package

Fredericia Kommune | Published July 14, 2015
cpvs
48100000, 48000000, 72200000

Dialogmøder vedr. IT-løsning til Social- og Sundhedsområdet.

Gasdistribution og beslægtede tjenester 2015/S 248-452953

DONG Energy Thermal Power A/S | Published December 23, 2015  -  Deadline February 12, 2016
cpvs
65200000, 65210000

The Municipality of Copenhagen and CPH City & Port has decided to establish homes and offices in the former industrial area between HC Ørsted Power Plant and the harbor at Enghave Brygge. In this context, the transmission line from Amager to HC Ørstedsværket shall be redirected. This contract notice includes the project to plan, design and build a new MR station that can be connected to the existing plant at HC Ørsted Power Plant and Energinet.dk's re-engineered gas pipeline. The new MR Station shall be delivered as a turnkey delivery. The MR station is supplied with 55 bar gas from a transmission line. The gas is to be reduced in pressure in the MR-station and supplied to HCV on two pressure levels: 1. Approximately 4 bar gas with a total maximal nominal consumption of approximately 55 000 Nm3/h 2. Approximately 24 bar gas with a total maximal nominal consumption of approximately 11 000 Nm3/h The turnkey contract contains as a minimum — but not limited to — the following: — Design / detailed design of all deliveries, — Delivery of documentation and materials for the purpose of regulatory approval (technical specifications regarding gas, environmental and construction-related regulatory procedures). — Proof of delivery. — Compliance with technical specifications from DONG Energy. — Information on dimensions, weight etc. to be used for foundations. — Architectural project(s), including design drawings, descriptions, as-built drawings, calculations etc. — Establishment of structures, — The design, procurement and construction of installations, including a. Ventilation system. b. Piping for inlet, filter, pre-heating, control, measurement and outlet. c. Instrumentation, instrumentation tubing, blow down and vent lines. d. gas train. e. Heating system incl. space heating. f. SCADA system incl. calculations, PLC programming, data exchange, installation plans, diagrams, charts, etc. g. Electric power supply. h. Low voltage switchgear and control relays. i. Control Panels. j. Communication system (SCADA) k. Gas Alarm System. l. Emergency supply (UPS). m. Water supply n. Drainage incl. connection to sewer — FAT and SAT test of components. — All transportation, handling and insurance etc. incl. crane and crane lift at supplier and the construction site. — All fees etc in connection with the approval of the design and construction of pressurized components according to Danish legislation. — Regulatory requirements for specific measurements, such as noise and emissions. — Contact with authorities in regards to transport through Denmark.

HCV MR Station M-01 MR Station.

DONG Energy Thermal Power A/S | Published December 23, 2015  -  Deadline February 12, 2016
cpvs
65200000, 65210000

The Municipality of Copenhagen and CPH City & Port has decided to establish homes and offices in the former industrial area between HC Ørsted Power Plant and the harbor at Enghave Brygge. In this context, the transmission line from Amager to HC Ørstedsværket shall be redirected.

This contract notice includes the project to plan, design and build a new MR station that can be connected to the existing plant at HC Ørsted Power Plant and Energinet.dk's re-engineered gas pipeline. The new MR Station shall be delivered as a turnkey delivery.

The MR station is supplied with 55 bar gas from a transmission line. The gas is to be reduced in pressure in the MR-station and supplied to HCV on two pressure levels:

1. Approximately 4 bar gas with a total maximal nominal consumption of approximately 55 000 Nm3/h

2. Approximately 24 bar gas with a total maximal nominal consumption of approximately 11 000 Nm3/h

The turnkey contract contains as a minimum — but not limited to — the following:

— Design / detailed design of all deliveries,

— Delivery of documentation and materials for the purpose of regulatory approval (technical specifications regarding gas, environmental and construction-related regulatory procedures).

— Proof of delivery.

— Compliance with technical specifications from DONG Energy.

— Information on dimensions, weight etc. to be used for foundations.

— Architectural project(s), including design drawings, descriptions, as-built drawings, calculations etc.

— Establishment of structures,

— The design, procurement and construction of installations, including

a. Ventilation system.

b. Piping for inlet, filter, pre-heating, control, measurement and outlet.

c. Instrumentation, instrumentation tubing, blow down and vent lines.

d. gas train.

e. Heating system incl. space heating.

f. SCADA system incl. calculations, PLC programming, data exchange, installation plans, diagrams, charts, etc.

g. Electric power supply.

h. Low voltage switchgear and control relays.

i. Control Panels.

j. Communication system (SCADA)

k. Gas Alarm System.

l. Emergency supply (UPS).

m. Water supply

n. Drainage incl. connection to sewer

— FAT and SAT test of components.

— All transportation, handling and insurance etc. incl. crane and crane lift at supplier and the construction site.

— All fees etc in connection with the approval of the design and construction of pressurized components according to Danish legislation.

— Regulatory requirements for specific measurements, such as noise and emissions.

— Contact with authorities in regards to transport through Denmark.

Gasdistribution og beslægtede tjenester 2015/S 250-459430

Energinet.dk | Published December 26, 2015  -  Deadline January 25, 2016
cpvs
65200000, 38420000, 42130000, 44160000, 65210000, 38425100

The Municipality of Copenhagen and CPH City & Port has decided to establish homes and offices in the former industrial area between HC Ørsted Power Plant and the harbor at Enghave Brygge. In this context, the natural gas transmission line from Amager to HC Ørstedsværket shall be redirected. This contract notice concerns the project to plan, design and build a new MR station that can feed Energinet.dk‘s re-engineered gas pipeline. The new MR Station shall be delivered as a turnkey delivery. The MR station will be supplied from the Danish Natural gas transmission system, which has a design pressure of 80 bar, and it shall be designed for a discharge pressure of 55 bar. However both station inlet and — outlet to be designed for 80 bar i.e. pressure testing for 120 bar. The maximum flow will be approximately 66 000 Nm3/h. The turnkey contract contains as a minimum — but not limited to — the following: — Design / detailed design of all deliveries; — Delivery of documentation and materials for the purpose of regulatory approval (technical specifications regarding gas, environmental and con-struction-related regulatory procedures); — Proof of delivery; — Compliance with technical specifications from Energinet.dk — Information on dimensions, weight etc. to be used for foundations; — Architectural project(s), including design drawings, descriptions, as-built drawings, calculations etc.; — Establishment of structures; — The design, procurement and construction of installations, including: o Ventilation system; o Piping for inlet, filter, pre-heating, control, measurement and outlet; o Instrumentation, instrumentation tubing, blow down and vent lines; o gas train; o Odorant system; o Gas fired central heating system for prepeating of gas andl. space heating; o SCADA system incl. calculations, PLC programming, data exchange, installation plans, diagrams, charts, etc; o Electric power supply; o Low voltage switchgear and control relays; o Control Panels; o Communication system (SCADA); o Gas Alarm System; o Emergency supply (UPS). o The buildingstructure — and doors/gates for the meter and regulator room shall be designed for an over-pressure of 5 kN/m2 and the roof shall be designed with a light element for pressure relief in case of an explosion. o The operation of the station is so that the temperature after pressure reduction will be in the range of 2-5 o C therefore removabal trays for water condensated on the piping shall be included. The water shall be drained into the sewer. o Drainage incl. connection to sewer. — FAT and SAT test of components; — All transportation, handling and insurance etc. incl. crane and crane lift at supplier and the construction site; — All fees etc in connection with the approval of the design and construction of pressurized components according to Danish legislation; — Regulatory requirements for specific measurements, such as noise and emissions; — Contact with authorities in regards to transport through Denmark.

MR station Artillerivej.

Energinet.dk | Published December 26, 2015  -  Deadline January 25, 2016
cpvs
65200000, 65210000, 38420000, 38425100, 42130000, 44160000

The Municipality of Copenhagen and CPH City & Port has decided to establish homes and offices in the former industrial area between HC Ørsted Power Plant and the harbor at Enghave Brygge. In this context, the natural gas transmission line from Amager to HC Ørstedsværket shall be redirected.

This contract notice concerns the project to plan, design and build a new MR station that can feed Energinet.dk‘s re-engineered gas pipeline. The new MR Station shall be delivered as a turnkey delivery.

The MR station will be supplied from the Danish Natural gas transmission system, which has a design pressure of 80 bar, and it shall be designed for a discharge pressure of 55 bar. However both station inlet and — outlet to be designed for 80 bar i.e. pressure testing for 120 bar.

The maximum flow will be approximately 66 000 Nm3/h.

The turnkey contract contains as a minimum — but not limited to — the following:

— Design / detailed design of all deliveries;

— Delivery of documentation and materials for the purpose of regulatory approval (technical specifications regarding gas, environmental and con-struction-related regulatory procedures);

— Proof of delivery;

— Compliance with technical specifications from Energinet.dk

— Information on dimensions, weight etc. to be used for foundations;

— Architectural project(s), including design drawings, descriptions, as-built drawings, calculations etc.;

— Establishment of structures;

— The design, procurement and construction of installations, including:

o Ventilation system;

o Piping for inlet, filter, pre-heating, control, measurement and outlet;

o Instrumentation, instrumentation tubing, blow down and vent lines;

o gas train;

o Odorant system;

o Gas fired central heating system for prepeating of gas andl. space heating;

o SCADA system incl. calculations, PLC programming, data exchange, installation plans, diagrams, charts, etc;

o Electric power supply;

o Low voltage switchgear and control relays;

o Control Panels;

o Communication system (SCADA);

o Gas Alarm System;

o Emergency supply (UPS).

o The buildingstructure — and doors/gates for the meter and regulator room shall be designed for an over-pressure of 5 kN/m2 and the roof shall be designed with a light element for pressure relief in case of an explosion.

o The operation of the station is so that the temperature after pressure reduction will be in the range of 2-5 o C therefore removabal trays for water condensated on the piping shall be included. The water shall be drained into the sewer.

o Drainage incl. connection to sewer.

— FAT and SAT test of components;

— All transportation, handling and insurance etc. incl. crane and crane lift at supplier and the construction site;

— All fees etc in connection with the approval of the design and construction of pressurized components according to Danish legislation;

— Regulatory requirements for specific measurements, such as noise and emissions;

— Contact with authorities in regards to transport through Denmark.

  • 1