Industrial machinery

ZZN Jihlava a.s. | Published February 2, 2017  -  Deadline February 22, 2017
cpvs
42000000

The deliverable limit public contract is the delivery of transport routes to the silo in Jihlava, including related construction works -konkrétně these are openings for ventilation.

Industrial machinery

ZZN Jihlava a.s. | Published January 11, 2017  -  Deadline February 14, 2017
cpvs
42000000

The deliverable limit public contract is the delivery of transport routes to the silo in Jihlava, including related construction works -konkrétně these are openings for ventilation.

Technical specifications of supply / technology.

At the bottom plastic resistance chain.

It is a complete newly manufactured conveyors.

On the new bucket elevators will be equipped with sensors to slip.

1.2 - Redler below the front basket of income;

3.4 - Redler under the "railway" income basket;

5 - Redler below the silo connection from extreme cells;

6 - Redler expedition headed silo;

7 - screw conveyors for powder, average length;

8 - Redler "rail" despatch;

9 - Redler below the cells;

10 - Redler of cells;

Position title piece;

1;

1;

1;

1;

1;

1;

7 trough auger 320 to 16 m 3;

1;

2;

3;

remote controlled electric slide 23;

manual damper 23;

1;

Steel structures, supports; 1 680 kg;

electrical (wiring, running line) control buttons on the existing cabinet;

blocking machines, electro-project;

Redler overflow sensor 9;

2.5 mm;

5 mm;

3 mm;

8 mm;

Filter F3 on the 11th floor, including separators and fan, 30 kW, 1;

HVAC systems; 100 m, pr.450 - 1 150 mm;

Electric flaps (including electrical) 2;

The screw conveyor 160, L = 3 m, 1.1 kW 1;

Filter F2 including fan (vacuum cleaners TAS) 18.5 kW 1;

450-150 mm 1;

F1 filter separators for the basement, including a fan, 30 kW 1;

450-100 mm -1;

Electric flaps (including electrical) 5;

2, 4) 2;

Construction under filters; 860 kg 3;

Including compressed air compressor and distribution 1;

Wiring (connection filters and compressor) 1;

Fittings flowing transport; 17.5 m; pr.219 - 273 mm 1;

Bag filter;

60,000 tons;

The dust content in m³ 10 mg / m³;

Complete related installation, inspection, transportation and commissioning of the entire line into a functional unit;

Construction costs;

Passage of the floor (area of ​​1.5 m² for all four passages in total) 4th

Industrial machinery

ZZN Jihlava a.s. | Published February 7, 2017  -  Deadline March 13, 2017
cpvs
42000000

The deliverable limit public contract is the delivery of transport routes to the silo in Jihlava, including related construction works -konkrétně these are openings for ventilation.

Industrial machinery

ZZN Jihlava a.s. | Published May 4, 2017
Winner
Agroing Brno s.r.o.
cpvs
42000000

The subject of the over-limit public contract is the delivery of transport routes to the Jihlava silo, including the related construction works.

The main object of the public contract is the supply of technologies. As far as the related construction works are concerned, they are only related to the supply as necessary for the delivery - specifically air ducts.

Secondary Industrial School Třebíč - Demolition and Construction of Pavilion B, Reconstruction of Pavilion A and Gymnasiums - Stage B

Kraj Vysočina | Published June 8, 2017
Winner
PKS stavby a.s.
cpvs
45214200

Revitalization alley Highlands - IV. Phase - III district Pelhřimov. stage

Krajská správa a údržba silnic Vysočiny, příspěvková organizace | Published October 22, 2014
cpvs

The subject of the public contract is to undertake revitalization alley along roads III / 03411 Střítež - Bor - industrial, II / 348 New Cerekev - industrial, III / 12922 Cross II / 129 - Bolechov and III / 13215 beginnings - the crossroad. Volmanec under IV. stage.

Revitalization alley Highlands - IV. Phase - III district Pelhřimov. stage.

Krajská správa a údržba silnic Vysočiny, příspěvková organizace | Published October 25, 2014
Winner
MUGO zahradnická s.r.o.Jiřího z Poděbrad 704/75Šumperk 787 01 rogik@seznam.cz +420 583222293 +420 583222693
cpvs
77341000, 77211400, 77211600

The subject of the public contract is to undertake revitalization alley along roads III / 03411 Střítež - Bor - industrial, II / 348 New Cerekev - industrial, III / 12922 Cross II / 129 - Bolechov and III / 13215 beginnings - the crossroad. Volmanec under IV. stage.

High school PTA Jihlava - reconstruction of heating School

Kraj Vysočina | Published June 7, 2016
cpvs

The subject of the public contract involves the reconstruction of heating in the area of ​​Secondary School industrial, technical and automotive Jihlava at School 1 in Jihlava.

High school PTA Jihlava - reconstruction of utilities, School

Kraj Vysočina | Published February 22, 2016
cpvs

The subject of the public contract involves the reconstruction of utilities in the area of ​​Secondary School industrial, technical and automotive Jihlava at School 1 in Jihlava and reconstruction of the boiler room at the lunch break room. Submitter allows all candidates for public contracts tour of the place of performance, which will be held on 26. 2. 2016. Meeting participants will tour at 9:00 pm. In front of the main entrance to the complex Middle School industrial, technical and automotive Jihlava, allowance organizations, to at School 1, Jihlava.

High school PTA Jihlava - reconstruction of utilities, School

Kraj Vysočina | Published May 4, 2016
cpvs

The subject of the public contract involves the reconstruction of utilities in the area of ​​Secondary School industrial, technical and automotive Jihlava at School 1 in Jihlava and reconstruction of the boiler room at the lunch break room.

Delivery System for immunity for leadership in the automotive industry

Automotive Lighting s.r.o. | Published September 29, 2015
cpvs

System for immunity for management in the automotive industry - the system comprises: a generator and arbitrary source pulse and waveform generator from the voltage drop of the coupling network for measurement according to ISO 7637-2 and operating software. Equipment used to test the durability of electronic control units.

High school PTA Jihlava - reconstruction of heating School

Kraj Vysočina | Published February 2, 2016
cpvs
45232141

Reconstruction of heating in the complex Middle School industrial, technical and automotive Jihlava at School 1 in Jihlava Reason Public procurement: 1. The aim of the tender is the reconstruction of the heating in the complex Middle School industrial, technical and automotive Jihlava at School 1 in Jihlava. 2. a description of the subject of the contract: This is a reconstruction of heating individual buildings on campus, including the reconstruction of the central boiler house and associated piping water supply and sanitation in existing buildings. 3. a description of the relationship of the public contract and the client's needs: Implementation of reconstruction of heating will remedy the current unsatisfactory state of emergency heating buildings in the complex high school PTA Jihlava, at School 1 in Jihlava. Another reason for the change in heating the anticipated savings for heating. 4. Expected date of fulfillment of public tenders: 31. 8. 2016

High school PTA Jihlava - reconstruction of heating School

Kraj Vysočina | Published April 18, 2016
cpvs

The subject of the public contract involves the reconstruction of heating in the area of ​​Secondary School industrial, technical and automotive Jihlava at School 1 in Jihlava. Submitter allows candidates for public tender place of performance, which will take place on 20. 4. 2016 9:00 pm. Meeting participants will tour the main entrance to the campus high school PTA Jihlava, at School 1, Jihlava.

High school PTA Jihlava - the reconstruction of utilities, School

Kraj Vysočina | Published January 5, 2016
cpvs
45000000

This is a reconstruction of utilities in the area of ​​Secondary School industrial, technical and automotive Jihlava in the street School, including the implementation of the external high-voltage wiring for lighting and laying ducts for optical fiber cables and to reconstruct boiler svačinárnu including the facade of the building. Reason effectiveness of public procurement: 1. The aim of the tender is the reconstruction of utilities in the area of ​​Secondary School industrial, technical and automotive Jihlava at School 1 in Jihlava and reconstruction of the boiler room at the lunch break room. 2. a description of the subject of the contract: This is a reconstruction of the areal sewage and storm sewers and water mains, including the implementation of the external high-voltage wiring for lighting and ducts for laying fiber optic cables, a separate demolition of the chimney and two ventilation shafts and the reconstruction of the southern part of the boiler room to the lunch break room including the facade of the building and build a walkway leading to the main school building with connections to the local service road. 3. a description of the relationship of the public contract and the client's needs: Implementation of reconstruction of engineering networks will remedy the unsatisfactory status quo complex sewage system and water supply in the area of ​​Middle School PTA at School 1 in Jihlava. Construction work of the boiler room will create conditions for lunch compliant restroom students. 4. Expected date of fulfillment of public contracts: 1. Stage 6 - 8/2016, stage 2 7 - 8/2017

Bulk and vacuum road salt for winter 2016/2017

Krajská správa a údržba silnic Vysočiny, příspěvková organizace | Published April 15, 2016
cpvs
34927100

The subject of the public contract is continuous supply about 6,945 tons of road salt in bulk and about 930 tons of vacuum salt intended for the winter maintenance of roads, including transport to and each cestmistrovství centers sponsor. The subject of the public contract is continuous supply about 6,945 tons of road salt in bulk, intended for the winter maintenance of roads, including transport to and each cestmistrovství centers sponsor. The deliverable contracts are continuous supply of about 930 tons vacuum salt intended for the winter maintenance of roads, including transport to and each cestmistrovství centers sponsor. Road maintenance is one of the main activities of the contracting authority. Supplies of industrial salts are intended to supplement the storage capacity of the contracting authority to ensure subsequent maintenance of roads in winter 2016/2017, in order to ensure navigability of roads II. and III. Classes Region to adverse climatic conditions and frost. Without the implementation of the public procurement authority is not able to meet the planned target and meet the needs of the client. Only the implementation of public procurement can be treated with some roads so as to ensure their sledding in the winter. Sponsor assumes the fulfillment of public contracts as follows: supply of road salt in bulk to September 30, 2016 and deliveries of the vacuum salt to March 31, 2017. The sponsor expects to meet the September 30, 2016. Sponsor assumes performance to 31 March 2017.

High school PTA Jihlava - Toilet Polenská reconstruction, renovation of classrooms and locker rooms on the 1st floor Polenská

Kraj Vysočina | Published October 29, 2015
cpvs
45214000

Reconstruction of existing sanitary facilities, classrooms and lockers for students in the Middle School building, industrial, technical and automotive Jihlava at Polenská 2 in Jihlava. Reason effectiveness of public procurement: 1. The public contract is to modernize the existing sanitary facilities, classrooms and changing rooms for school students in the building of secondary school PTA Jihlava, Polenská 2, Jihlava. 2. a description of the subject of the contract: This is a reconstruction of sanitary facilities for students and teachers in the school building, including transfer of sewerage pumping stations in classrooms and reconstruction of heavy and weak, editing and layout object linking workshops with the building of schools, including building a new přezouvárny with social device. 3. a description of the relationship of the public contract and the client's needs: The existing sanitary facilities Schools Secondary Schools PTA building Polenská 2 in Jihlava does not match the structure and capacity needs of the school. Classrooms weak and heavy, and their layout do not qualify for teaching. Missing Link Building workshops with the school building and the building does not přezouvárna for students. Construction work will create conditions conforming to the requirements of modern education. 4. Expected date of fulfillment of public tenders: 2. 9. 2016

Bulk and vacuum road salt for the winter 2015/2016

Krajská správa a údržba silnic Vysočiny, příspěvková organizace | Published March 19, 2015
cpvs
34927100

The deliverable contracts are continuous supply of about 10,600 tons of bulk road salt and about 535 tons of vacuum salt, intended for winter road maintenance, including transportation to the individual cestmistrovství centers and contracting. The deliverable contracts are continuous supply of about 10,600 tons of road salt in bulk, intended for winter road maintenance, including transportation to the individual cestmistrovství centers and contracting. The deliverable contracts are continuous supply of about 535 tons vacuum salt, intended for winter road maintenance, including transportation to the individual cestmistrovství centers and contracting. Maintenance of roads is one of the main activities of the contracting authority. Supply of industrial salt are intended to supplement the storage capacity of the contracting authority to ensure subsequent maintenance of roads in winter 2015/2016, in order to ensure to road II. and III. Classes Region to adverse weather conditions and frost. Without implementation of procurement authority is not able to meet the planned target and meet the needs of the contracting authority. Only turing procurement can be treated with some roads so as to ensure their sledding in the winter. Sponsor assumes compliance with procurement follows: supply bulk road salt to September 30, 2015 and supplies vacuum salt to March 31, 2016. Sponsor assumes compliance to 30 September 2015 Sponsor expected to be made in the March 31, 2016.

Delivery of technological equipment for the automated line II.

Swoboda CZ s.r.o. | Published March 11, 2016
cpvs

Sponsor split tender to supply with the option of a partial fulfillment of the following parts: - Sub-section a) Supply of industrial robots: The deliverable of this part of the contract is the delivery of four units of industrial robots, including transportation. - Sub-section b) Delivery testers Leak: The deliverable of this part of the contract is the delivery of two testers Leak and transport. 1 b) the tender documentation. The candidate may submit a bid for one part or two parts, each part will be determined by independent evaluation. 1) The tender documentation. 1 b) the tender documentation. 137/2006 Coll., On Public Procurement, as amended. Additional information, including the exact wording of the request will then be sent by e-mail to all known candidates, who were contract documentation (ie. All known candidates) and will also be published on the contracting entity profile. 320/2001 Coll., On financial control in public administration will be selected bidder is obliged to cooperate in the performance of financial control. Announcement of the result of the tender will be deemed delivered to all interested bidders upon publication on the profile of the client. Evidence demonstrating the fulfillment of qualifications (see qualification documentation) may be submitted in the Slovak language. It is a tender for the supply with the possibility of partial plnění.Nabídky will be processed and presented separately for the sub-section) and sub-section b) of this tender. This condition is mandatory for both sub-section a) contracts and sub-section b) contracts. Annex B is given CPV code specific to that part. In Appendix B of this form is given technical competence specific to that area. In Annex B is given a specific evaluation of the part. The maturity period starts to run again by re-sending the duly supplemented or corrected documents. Supplier proves the fulfillment of professional qualification requirements by submitting: - Certificate of Incorporation, if it is registered, or of any other similar evidence, if it is registered. The Contracting Authority requires proof of basic qualifications for the sub-section a) tender. The Contracting Authority requires proof of financial and economic capacity for the sub-section a) tender. 1 Qualification Documentation. Each component parts of the contract is determined by independent evaluation. The basic criterion for the award of sub-contracts a) the economic advantage of the offer. Sub-criteria for the award are: A) Offer price (CZK without VAT) - weight 60% B) Delivery time (in number of weeks from contract signing) - weight 40% maturity period starts running again by re-sending the duly supplemented or corrected documents . Supplier proves the fulfillment of professional qualification requirements by submitting: - Certificate of Incorporation, if it is registered, or of any other similar evidence, if it is registered. The Contracting Authority requires proof of basic qualifications for the sub-section b) of the competition. The Contracting Authority requires proof of financial and economic capacity for the sub-section b) of the competition. 2 Qualification documentation. Each component parts of the contract is determined by independent evaluation. The basic criterion for the award of sub-contracts b) the economic advantage of the offer. Sub-criteria for the award are: A) Offer price (CZK without VAT) - weight 60% B) Delivery time (in number of weeks from contract signing) - weight 40%

Delivery of technological equipment for the automated line

Swoboda CZ s.r.o. | Published February 12, 2016
cpvs

Contractor, Swoboda CZ sro announces tender to supply with the possibility of partial performance entitled "Delivery of technological equipment for the automated line" as its object the supply of sub-systems within the project "Acquisition of new manufacturing technologies companies Swoboda CZ, sro" Sponsor split selection tender for the supply with the possibility of partial fulfillment of the following parts: - sub-section a) delivery vibratory feed system: the deliverable of this part of the contract is the delivery of a vibratory feed system, including transport and commissioning. - Sub-section b) Delivery of industrial robot: The deliverable of this part of the contract is the delivery of an industrial robot, including transportation. 1 b) the tender documentation. The candidate may submit a bid for one part or two parts, each part will be determined by independent evaluation. 1) The tender documentation. 1 b) the tender documentation. 137/2006 Coll., On Public Procurement, as amended. Additional information, including the exact wording of the request will then be sent by e-mail to all known candidates, who were contract documentation (ie. All known candidates) and will also be published on the contracting entity profile. 320/2001 Coll., On financial control in public administration will be selected bidder is obliged to cooperate in the performance of financial control. Announcement of the result of the tender will be deemed delivered to all interested bidders upon publication on the profile of the client. Offer and all its parts will be in the Czech language. It is a tender for the supply with the possibility of partial plnění.Nabídky will be processed and presented separately for the sub-section) and sub-section b) of this tender. Annex B is given CPV code specific to that part. In Annex B of the said financing conditions and payment arrangements specific to the area. In Annex B is given a specific evaluation of the part. The maturity date is the date when the purchase price is debited from the buyer's account at the bank. The maturity period starts to run again by re-sending the duly supplemented or corrected documents. Supplier proves the fulfillment of professional qualification requirements by submitting: - Certificate of Incorporation, if it is registered, or of any other similar evidence, if it is registered. 1 Qualification Documentation. The Contracting Authority requires proof of basic qualifications. The Contracting Authority requires proof of economic and financial capacity. Each component parts of the contract is determined by independent evaluation. The basic criterion for the award of sub-contracts a) the economic advantage of the offer. Sub-criteria for the award are: A) Offer price (CZK without VAT) - weight 60% B) Delivery time (in number of weeks from contract signing) - 40% weight due date is the date when the purchase price is debited from the buyer's account at the bank. The maturity period starts to run again by re-sending the duly supplemented or corrected documents. Supplier proves the fulfillment of professional qualification requirements by submitting: - Certificate of Incorporation, if it is registered, or of any other similar evidence, if it is registered. The Contracting Authority requires proof of basic qualifications. The Contracting Authority requires proof of economic and financial capacity. The Contracting Authority requires proof of technical qualifications. Each component parts of the contract is determined by independent evaluation. The basic criterion for the award of sub-contracts b) the economic advantage of the offer. Sub-criteria for the award are: A) Offer price (CZK without VAT) - weight 60% B) Delivery time (in number of weeks from contract signing) - weight 40%

Saving energy company forges and Moravian

Moravské kovárny, a.s. | Published August 18, 2016
cpvs

The subject of this contract, the construction work. A supplier may submit an offer for all the parts, but also on some of the parts of this contract. The project is the revitalization of selected objects in the area of ​​Moravian and forges in Jihlava (MOKOV). All these measures are designed to improve both thermal technical and energy properties of the object. A) Construction of the lightning current and skylights will be canceled and replaced with a new roof structure, also includes new construction skylights. Part B) Electrical - Lighting The project includes the upgrading of lighting and related electrical modification, and in objects independently solves part PD: D.1.4.B_Modernizace lighting and related electrical adjustment. The management system also enables further DALI well as any future reconfiguration of the lighting system without interference in the actual execution of electrical installations (circuit changes, change of control, etc.). Part C) HVAC ventilation device designed in this project, is required to ensure proper climatic conditions in the object space according to the requirements of the Building Act, the decree on general technical requirements for construction, applicable standards, sanitary and fire regulations and the requirements of other technologies in buildings installed . The purpose of installing air-conditioning units to improve the microclimate ventilated area manufacturing plants use more efficient, modern technology and the overall revitalization of the outer roof deck the halls. The proposed system will be designed as a relief. Existing skylights would be abolished and replaced with a new roof structure, also includes new construction skylights. Solved buildings in the complex: SO 08 - Material cutting 3,722 m2 SO 09, 11, 12 - Smithy, incl. administrative and social cervices 6996 m2 SO 10 - Heat treatment of 6,237 m2 SO 07 - Social building 1,156 m2 SO 33 - Expedition 1674 m2 SO 40 - Stock dies 1029 m2 6 ZD - Part A - Building part and lightning). The project also includes upgrading lighting and related electrical modification, and in objects independently solves part PD: D.1.4.B_Modernizace lighting and related electrical adjustment. The management system also enables further DALI well as any future reconfiguration of the lighting system without interference in the actual execution of electrical installations (circuit changes, change of control, etc.). Applicants also submit a quotation: • Calculation of lighting on the buildings respects these specifications including the source file • maintenance schedules for individual areas (maintenance factor calculation) • catalog lists specific fixtures offered to perform the contract. Evaluation of the bids submitted on the technical side will be made on the basis of the output from a computer program (including source files). 7 TD). Air handling equipment designed in this project, is required to ensure proper climatic conditions in the object space according to the requirements of the Building Act, the decree on general technical requirements for construction, applicable standards, sanitary and fire regulations and the requirements of other technologies installed in buildings. The purpose of installing air-conditioning units to improve the microclimate ventilated area manufacturing plants use more efficient, modern technology and the overall revitalization of the outer roof deck the halls. The proposed system will be designed as a relief. The entire system of compensation for air and heating will work with the residual heat from the buildings with surplus energy: • SO 09 Smithy • SO 10 Heat treatment of these surpluses will be heated places where there is increased ventilation, or move material from / to the building, a space with energy shortages: • SO 08 material division • SO 33 Expedition Both of these areas are intertwined in object SO 09 Smithy. To move air from the SO 08 SO material division into 09 Smithy are used interconnecting piping over by a neck to prevent drafts just in connecting corridors. To move air from 33 SO SO Expedition 10 Heat treatment is used connecting pipes over by a neck to prevent drafts in connecting corridors. 6 ZD - Part C - AHU). Part A), construction work and lightning 360/1992 Coll., As amended by the profession of authorized architects and the profession of authorized engineers and technicians active in construction. Part B) Electricity - Required minimum illumination level: At least 3 contracts of similar nature, volume each minute. For similar works authority considers that the work consisting in the supply and installation of electrical wiring and lighting for industrial, commercial and public buildings, with at least 1 work demonstrably carried out while operating the building (to be documented in a list or certificate); 1 work demonstrably solved through lighting LED luminaires built-up area of ​​at least 10.000 m2 (to be demonstrably evidenced by the list or certificate). 1 powder