Public tenders for cooling in Sentrum-trondheim Norway

Find all Industrial tenders in the world.
Finding business opportunities has never been easier.

Results for industrial. Make a new search!
IndustrialcoolingNorwaysentrum-trondheim

UiN Cooling Works

Statsbygg Midt-Norge | Published April 9, 2015  -  Deadline April 27, 2015
cpvs
42500000

On UIN there 1pc refrigeration systems that use R22 and cooling power of 40 kW. All these facilities will be fully or partially replaced and it will be used plant with refrigerant R134a. Refrigeration unit is located in the technical room Shower Step 2. Refrigeration unit must Depleted and removed and delivered to approved landfill. It should be replaced by another unit which is located in Technical 4A that have the same capacity. All refrigeration units cooled with water / glycol connected drycooler.

Climate Cooling System for Fuse Storage - K301

Statsbygg Midt-Norge | Published May 31, 2017  -  Deadline June 19, 2017
cpvs
45331230

Rehabilitation of climate-cooling facilities at the security magazine. Existing liquid-cooled refrigerators in the Technical Room should be replaced because it is in poor condition and has R-22 as a refrigerant. The refrigeration plant will be replaced by a new air-cooled refrigeration plant with R-290 (propane) as a refrigerant and a dry cooler for cooling off from outside air.

Refrigeration and air-conditioning systems (CO2 container test facility — INDEE)

NTNU [The Norwegian University of Science and Technology] | Published October 12, 2016  -  Deadline October 27, 2016
cpvs
42113130, 45331231, 44613200

In connection with the project INDEE, NTNU plans to procure energy efficient and environmentally friendly refrigeration and climate installation (AC) systems for supermarkets and associated office buildings in India. Energy efficient and integrated cooling and AC systems (for which INDEE is the first pilot) based on the natural working media CO2, adapted to the climatic conditions in India, will be executed in a university laboratory.

Directional Solidification machine

NTNU (The Norwegian University of Science and Technology) | Published September 21, 2016  -  Deadline October 7, 2016
cpvs
38432000, 42663000, 38430000

This is a voluntary notice in TED in order to reach the international market. The tender contest is published in accordance with part II.

Directional Solidification machine for metals:

Solidification and casting of metals alloys is an important research field at the Department for material science and engineering, NTNU. For further strengthening research and education in solidification, NTNU plans to procure a Directional Solidification machine. This machine should include a melting and casting system, a computer-operated relocation system for crucibles, a heating system, a cooling system and a vacuum system. This machine should, with necessary adaptations, also have the option to be used for preparing samples of metallic glass.

Analysesenteret - Upgrading of refrigeration

Trondheim kommune | Published June 9, 2015  -  Deadline July 1, 2015
cpvs
45331230, 45000000

The cooling technical installations at Analysesenteret in Agriculture Road 5 in Trondheim will be upgraded. There are problems with high temperatures inside in summer. This has an adverse impact on the work environment and core business Analysis Centre. Existing ice water plants have exceeded technical life and must be replaced to protect the increasing cooling demand in the building. This delivery mainly includes delivery, installation and commissioning of new water / liquid cooling unit (ice water machine), dry cooler system, piping with valves and new cooling coils and chilled beams. Service and Maintenance Agreement on offered cooling unit with technical systems to be offered as an option. Contents of this agreement are described in Appendix B - Technical description.

Industrial machinery

NTNU | Published February 8, 2017  -  Deadline February 28, 2017
cpvs
42000000, 44000000, 51120000

The buyer has the intention of purchasing equipment for production of rapidly solidified metallic ribbons on the laboratory scale (5-10 g per run), using the melt spinning method.

The equipment should be capable of accurate process control, including melt temperature measurement, variable substrate velocity, melt ejection pressure and crucible-substrate distance. A high vacuum pumping system shall be included. Melt temperatures up to 1 700 centigrade shall be accessible while reachable cooling rates shall be in the range of 10^5 to 10^6 K/s. The machine should be capable of exchanging the substrate wheel for a static mold for injection casting of metals.

The contracting authority estimates that the equipment's lifetime will be approx. 10-15 years.

See the contracting authority's requirement specifications in annex 1_2_7 for further procurement requirements (see the annex).

The contracting authority intends to procure 1 machine as described in the tender documentation and the requirement specifications.

Procurement of K301 Plumbing work for PET Radio-pharmaceutical Production, St. Olavs Hospital

Sykehusbygg HF | Published June 8, 2016  -  Deadline August 19, 2016
cpvs
45231113, 45231112, 76480000, 45333000

Sykehusbygg HF invites tenderers, on behalf of St. Olavs hospital HF, to a competition for the following procurement: Project: PET — Radio-pharmaceutical production. Contract: K301 Plumbing work. St. Olavs hospital will be the contracting authority and contract party. The project is for the construction of a new building for PET radio-pharmaceutical production. 1 110m2 gross shall be constructed, divided between 1 011m2 below ground and 99m2 above ground. The areas below ground consist of a concrete bunker for cyclotron and production premises for radio-pharmaceutical. There are strict requirements for screening off radio activity and clean room requirements. K301 consists of plumbing work, including gas installations, sprinklers, sanitation, waste-water and connection to existing district heating and cooling installations. The gas installations shall be carried out in laboratory quality and they will make up most of the contract. The construction work and other technical professions are in separate contracts.

BYÅSEN VG SCHOOL. REHAB VARMEPUMPPE

Sør-Trøndelag fylkeskommune, Bygge- og eiendomstjenesten | Published August 29, 2016  -  Deadline October 10, 2016
cpvs
42511110, 42500000, 45331000, 45330000

Existing heat pump / cooling system will be rehabilitated and expanded by the accumulation and extended energy distribution.

Electrical, structural, HVAC and rørtekniske works to be included.

ANSK-0020-15 air

NTNU | Published March 20, 2015  -  Deadline April 15, 2015
cpvs
42113130, 42532000, 42513100

procurement is a refrigeration system for testing air-to-air heat exchangers. The cooling system to cool moist air down to the desired temperature. temepraturområder outgoing air temperature will be from -45 to +7 degrees C.

Exploratory drilling AND ESTABLISHMENT of wildcat wells in central areas OF ELVERUM

Asplan Viak AS | Published September 16, 2015  -  Deadline September 30, 2015
cpvs
45111250, 71351500

The Geological Survey together with NTNU, Melhus and Elverum municipalities and consulting firm Asplan Viak as engaged in a research project entitled "Optimal resource utilization of groundwater for heating and cooling in Melhus and Elverum," commonly abbreviated "Ormel." The main objective of the project is to obtain scientifically reliable and sustainable basis for optimal utilization and management of groundwater resources for heating and cooling needs. It has previously conducted many due bores and wells establishments in downtown and central areas of Elverum in connection with the mapping of vast potential for the extraction of groundwater for drinking water supply and geothermal energy. The information from these core holes, giving together with previously completed geophysical surveys, important information about the debris composition and depth of the rock in parts of Elverum.

Refrigerators and air conditioners (CO2 container test facility - Inde)

NTNU | Published October 7, 2016  -  Deadline October 27, 2016
cpvs
42113130, 45331231, 44613200

In connection with the project Inde, plan NTNU acquiring energy efficient and environmentally friendly refrigeration and air conditioning (AC) systems for supermarkets and associated offices in India. Energy efficient and integrated cooling and AC systems (which Indee is the first pilot) based on natural working fluid CO2, adapted to the climatic conditions in India, will be conducted in a university laboratory.

5002801 Phasing R22 Government House Steinkjer - Rev A

Statsbygg Midt-Norge | Published June 17, 2015  -  Deadline July 7, 2015
cpvs
45331230

Government House has 3 cooling units that use refrigerants R22. Two machines are located on the 7th floor and a machine in the basement. All these kjølemasinene be removed and replaced by two new machines being installed in new plant room on roof plane 7. The plants equipped with either dry cooler placed on hold by technical room. Both plants will use refrigerant R134a.

PAVA- General Entreprise Havstein and Havsteinekra health and welfare center

Trondheim kommune | Published May 20, 2015  -  Deadline June 17, 2015
cpvs
45000000, 45422000, 45315100

Trondheim municipality will improve or install new nurse call system, later shortened by PAVA, health and welfare centers in Trondheim. PAVA supplied and installed by ATEA and Infratek. In connection with PAVA must be made part structural and technical works. It is these works this mission. In addition to PAVA should be corrected working on Havstein in connection with periodic major maintenance, and specific orders from the alderman. This time will be carried out works at Havstein nursing and Havsteinekra health and welfare center. The following works by Havstein nursing home with 29 residents and 30 assisted living facilities should be performed: • Replacement of 86 doors • Adaptations of technical rooms • New cooling unit plant room • Wiring patient alarm • Working in conjunction with the main maintenance: new floor in the kitchen, new flooring in the cafeteria, work in wardrobes, flat roofing, replace shower and washbasin mixer on nursing section at Havstein, replace light fixtures and emergency lighting for the entire building, as well as switching light fixtures for parts of the outdoor • Councilman order: Upgrading wardrobe and expansion of veranda (30m2) The following work by Havsteinekra health and welfare center with 48 residents and 10 assisted living facilities for the deaf and deaf-blind should be performed: • Replacement of 28 doors • Replacement of 48 2-leaf door set • Adaptations of 2 technical rooms and junction box / room • New cooling unit plant room • Wiring patient alarm

Equipment for hardening and solidification (Directional Solidification machine)

NTNU | Published September 17, 2016  -  Deadline October 7, 2016
cpvs
38432000, 42663000, 38430000

This is a voluntary ulysning at TED to reach the international market. The competition announced by Part II.

Equipment for the setting and hardening of metals:

Solidification and casting of metals and alloys is an important field of research at the Institute of Materials Science, NTNU. To further strengthen research and education in solidification, planning NTNU buying a unidirectional solidification instrument. Such an instrument should include a melting and casting system, computerized system for moving the crucible, heating system, cooling system and vacuum system. With necessary adaptations, should this instrument also have the possibility to be used for sample preparation of metallic glass.

Replacement of air handling units

Statsbygg Midt-Norge | Published June 10, 2016  -  Deadline July 4, 2016
cpvs
45331200

Replacement of 4 air handling units (2 in Nursing and 2 in Siv.Øk) including aid worker.

Disclosure of ice water to cooling coils for generators at Siv.Øk.

New shunt groups for all units.

Replacement of 6 supply air diffusers in A126 and 4 supply air diffusers in A263.

Replacement of supply air and supply air for room 254, and the laying of new flue with control valve for the same room.

Commissioning of air treatment plants for actions taken.

Automation for air handling units.

Option: creation of demand controlled ventilation in auditoriums in Siv.Øk.

Open tender for the purchase and delivery of catering

Trondheim kommune | Published October 11, 2014
Winner
Metos AS
cpvs
39314000, 39141000, 39220000

The largest unit that uses catering is production kitchen in Trondheim. The main principles at the production kitchen is cooking / cooling. The production capacity covers the current needs of approximately 2500 dietary day and future needs of approximately 3000 broom days. During the contract period will be undertaken construction of kitchens in schools, nurseries and canteens where catering is required, Trondheim Property will normally be the device that performs these developments. Estimated value of catering equipment is approximately 3 million. NOK per year. The client wants cheap purchase and delivery of: 1 Large Kitchen for completion and / or replacement / supplementation for the municipality kitchen. 2 Service and repair contract 3's services for production kitchens and nursing homes, mainly in terms of dishwashers.

Assistance to project management of thermal energy projects

Enova SF | Published February 20, 2016
Winner
Fossekall AS
cpvs
72224000, 71314000

The provision applies to assistance with project management of heating projects that have achieved through Enova heat applications.

Project follow mainly involves the following activities:

• Maintaining and updating the application's portfolio overview of ongoing and completed projects.

• Control of project progress in relation to the project schedule and set end date, with active follow-up of projects that deviate from plan.

• Answering inquiries by telephone and e-mail, and clarify documents for signature by Enova responsible by more formal mailings.

• Review of requests for payment of grants to the requirements set in the grant letter for each project. For projects that are in the final phase involves review that Supplier in addition make 3rd party evaluation of achieved energy result in the project.

• Assist Enova inspections on completion of projects.

Relevant technologies for renewable thermal production in the project portfolio are various types of biofuel, waste incineration, various types of heat pumps, solar collectors, absorption chillers, cooling and waste heat. In addition, the projects include external distribution of heat.

Assistance to project management of thermal energy projects

Enova SF | Published October 7, 2015  -  Deadline November 16, 2015
cpvs
72224000, 71314000

Enova wants to recruit an external party that can assist with project management of heating projects that have achieved through Enova heat applications. Project follow mainly involves the following activities: • Maintaining and updating the programs' portfolio overview of ongoing and completed projects. • Control of project progress in relation to the project schedule and fixed end date, with active follow-up of projects that deviate from the plan. • Answering inquiries by telephone and e-mail, and prepare documents for signature by Enova responsible by more formal mailings. • Review of requests for payment of grants to the requirements set in the grant letter for each project. For projects that are in the final phase involves review that Supplier in addition shall carry 3rd party evaluation of achieved energy result in the project. • Assist Enova with inspections on completion of projects. Appropriate technologies for renewable thermal production in the project portfolio are various types of biofuels, waste incineration, various types of heat pumps, solar collectors, absorpsjonskjøling, cooling and waste heat. In addition, the projects include external distribution of heat.
  • 1