Installation work of cooling equipment

Statens vegvesen | Published May 5, 2017  -  Deadline June 16, 2017
cpvs
45331230, 31141000, 42513200

There are several ICT rooms and ICT technical rooms with cooling that no longer functions satisfactory in the Norwegian Public Roads Administration's premises in Brynsengfaret 6, which are to be replaced with modern and more energy friendly technology that automatically regulates the cooling.

There is a need for a higher degree of security when notifying errors.

Service and maintenance of ventilation and cooling systems (framework agreement).

Høgskolen i Oslo og Akershus [Oslo and Akershus University College] | Published January 28, 2016
Winner
AF Energi og Miljøteknikk AS
cpvs
45331210, 71321400, 71315410, 50730000, 45331231, 45331230, 45331220, 45331211, 45331200, 45331000, 45330000, 45213210, 42530000, 42513000, 42500000

Oslo and Akershus University College leases all its premises and the objective of the procurement is to cover the University College's requirement for craftsmen services within ventilation and cooling. The need includes periodic service of installations, continuous repairs and work in addition to projects. The contract can also include material as well as ventilation and cooling equipment. It can also be relevant to provide consultancy services on indoor climate.

Based on historical figures and estimates of future needs, HiOA estimates that the contract's total value will be between 1 500 000 NOK and 2 000 000 NOK excluding VAT per annum of which approx. 2 3rds is for ventilation and 1 3rd cooling. This value is not binding for HiOA nor does it give any rights to the tenderer. The total scope is subject to the University College's requirements from year to year.

For projects with a cost limit of more than 500 000 NOK, excluding VAT, HiOA reserves the right to announce a separate competition for the procurement.

The procurement comprises 2 subject areas:

1. Ventilation,

2. Cooling.

Tenderers are invited to submit tenders for 1 subject area or both. HiOA will enter into a contract with 1 tenderer within each discipline.

Service and maintenance of ventilation and cooling systems (framework agreement).

Høgskolen i Oslo og Akershus (Oslo and Akershus University College) | Published August 28, 2015  -  Deadline October 7, 2015
cpvs
42500000, 42513000, 42530000, 45213210, 45331230, 45331231, 50730000

Oslo and Akershus University College leases all their premises and the objective of the procurement is to cover the University College's requirement for craftsmen services within the area ventilation and cooling. The requirement includes periodic service on systems, continuous repairs and works in addition to projects. The agreement may also include materials as well as ventilation and cooling equipment. It may also be relevant to provide consultancy in relation to indoor climate. Based on historical figures and estimates regarding future requirements, Oslo and Akershus University College estimates the procurement total value will be between 1 500 000 NOK and 2 000 000, excluding VAT per annum. 2/3 of these apply to ventilation and 1/3 applies to cooling. These amounts do not carry any obligations for the University College or rights for the service provider. The total scope is subject to the University College's requirement from year to year. In the case of projects with a cost framework in excess of 500 000 NOK excluding VAT, the University College reserves the right to announce a separate competitive tender procedure of its own for the procurement. The procurement comprises 2 subject areas: 1. Ventilation. 2. Cooling. Tenderers are invited to submit tenders for one subject area or both. The University College will enter into a contract with one supplier for each subject area. In the tender letter the tenderer shall state which subject areas the tender applies to.

Framework agreement for service and maintenance/modernisation of a ventilation and comfort cooling system

Omsorgsbygg Oslo KF [Oslo municipality, the Municipal Undertaking for Social Service Buildings] | Published December 9, 2016
cpvs
71315410, 42500000, 42510000, 42520000, 45330000, 45331000, 45331200, 45331210, 50000000

Framework agreement for service and maintenance/modernisation of a ventilation and comfort cooling system.

Service contract for cooling and ventilation installations.

Oslo Politidistrikt — Økonomiseksjonen | Published December 6, 2014  -  Deadline January 23, 2015
cpvs
45331210, 50710000, 50730000

Oslo Police District has various types of cooling and ventilation installations at several locations in the district. Oslo Police District is looking for a service provider who can carry out maintenance work on them. The Contracting Authority uses Mercell Sourcing Service. To express your interest and gain access to any documents, please click on the link below or copy and paste the link into your browser. [[http://permalink.mercell.com/48040069aspx]] Then follow the instructions on the website.

2016-045 Framework agreement for cooling and heat pump installations

Veterinærinstituttet [The Norwegian Veterinary Institute] | Published December 17, 2016  -  Deadline January 30, 2017
cpvs
42511110, 42530000, 42533000, 45232142, 45315000, 45331000, 45331231

The Norwegian Veterinary Institute shall establish a framework agreement for periodical maintenance and any repairs/technical support for the Norwegian Veterinary Institutes's cooling and heat pump installations. These work comprise service, operation and maintenance, assembly, rehabilitating, repair works, as well as new installations at the Norwegian Veterinary Institute in Oslo.

Information on the procurement.

The Norwegian Veterinary Institute invites tenderers to an open tender competition for the procurement of a Framework Agreement for cooling and heat pump installations to The Norwegian Veterinary Institute.

Inspections.

There will be a site inspection in the Norwegian Veterinary Institute's premises: Wednesday 21.12.2016 (9:00); Unfamiliarity with the site conditions cannot be later claimed as a basis for demanding additional information. Minutes will be kept from the site inspection. If questions are asked about the tender documentation during the site inspection, the questions and answers will be included in the minutes. The minutes will be distributed to all registered tenderers. The minutes are a part of the tender documentation. Tenderers who would like to participate in the site inspection are to send notification via the question function in Tendsign, with the name of the company and a representative at the latest 2 days before the site inspection. Each tenderer can have up to 2 representatives present.

Cooling - service and supply agreement

Stortingets Administrasjon | Published February 11, 2016
Winner
GK Norge AS
cpvs
50730000, 42510000

Procurement purpose and content is to conclude framework agreements for cooling including:

• Repair and maintenance of refrigeration equipment and supplies.

• Replacement of existing smaller cooling units, creation of new small installations.

Cooling equipment for air treatment and kitchen, fan coil systems.

Cooling - service and supply agreement

Stortingets Administrasjon | Published October 28, 2015  -  Deadline December 9, 2015
cpvs
50730000, 42510000

Procurement purpose and content is to conclude framework agreements for cooling including: • Repair and maintenance of refrigeration equipment and supplies. • Replacement of existing smaller cooling units, establishing new smaller installations. • Cooling equipment for air treatment and kitchen, fan coil systems.

Service Agreement cooling towers

Oslo Universitetssykehus HF | Published November 4, 2014
Winner
Buskerud Kulde AS
cpvs
50000000, 31140000

Oslo University Hospital (OUS) has entered into a service agreement for inspection and maintenance of four cooling towers at Rikshospitalet.

65916 14STE1 New cooling towers Oslo police station

Statsbygg Hovedkontor | Published December 17, 2014  -  Deadline January 30, 2015
cpvs
31140000, 42500000, 45331000, 45251150

Existing cooling towers in Oslo police station will be demolished. It has been decided to replace the old cooling towers with new cooling performance will be increased to approximately 1150 kW. Cooling tower is connected with two pieces. refrigeration machines.

New cooling unit in teaching and research building

Norges idrettshøgskole | Published November 5, 2014
Winner
Thermo Control AS
cpvs
31141000, 45331230, 50730000, 45331231

The Objective is to replace the existing chiller in instruction and research buildings with new and complete cooling unit. Hav- ing cooling unit is installed during construction of the development stage years 1994-1995. It is installed in the technical room in the building's basement floor and the cooling performance of 435 kW. Existing machine must be dismantled, out-transported and disposed of. New cooling unit to be delivered, home transported, assembled and installed complete.

Temporary cooling systems and ice surface at Jordal Amfi

Kultur- og idrettsbygg Oslo KF | Published September 5, 2016  -  Deadline September 23, 2016
cpvs
45331230

In connection with the project New Jordal Amfi is a need for additional interim measures to safeguard the sport activity in demolition and new facilities period. There shall be established a temporary training hall for hockey on existing artificial turf and it will be implemented in conjunction with existing Youth Centre; temporary cooling systems and setting up a barracks with changing rooms and offices.

The project consists of a total of four different contracts:

• E1 - Temporary ice rink

• E2 - Cooling and ice surface

• E3 - Technical Infrastructure

• E4 - Renting barracks

This acquisition comes E2- refrigeration units and ice surface.

It must be expected coordination and clarifications with other contracts in the engineering and construction phase.

In entreprise E2 - Cooling and ice surface included delivery and installation of complete cooling systems for both the Youth Centre and the temporary hall being built on artificial turf pitch. In addition, it established complete playing surface including screed, insulation, plastic wrap, banerør, sand filling, culverts, etc. ice surface size in the temporary hall will be 26 x 60m.

Temporary cooling systems and ice surface at Jordal Amfi

Kultur- og idrettsbygg Oslo KF | Published October 27, 2016
Winner
Isbaneteknikk AS
cpvs
45331230

In connection with the project New Jordal Amfi is a need for additional interim measures to safeguard the sport activity in demolition and new facilities period. There shall be established a temporary training hall for hockey on existing artificial turf and it will be implemented in conjunction with existing Youth Centre; temporary cooling systems and setting up a barracks with changing rooms and offices.

The project consists of a total of four different contracts:

• E1 - Temporary ice rink

• E2 - Cooling and ice surface

• E3 - Technical Infrastructure

• E4 - Renting barracks

This acquisition comes E2- refrigeration units and ice surface.

It must be expected coordination and clarifications with other contracts in the engineering and construction phase.

In entreprise E2 - Cooling and ice surface included delivery and installation of complete cooling systems for both the Youth Centre and the temporary hall being built on artificial turf pitch. In addition, it established complete playing surface including screed, insulation, plastic wrap, banerør, sand filling, culverts, etc. ice surface size in the temporary hall will be 26 x 60m.

17-013 Service Vinmonopolet cooling and ventilation

AS Vinmonopolet | Published March 24, 2017  -  Deadline May 8, 2017
cpvs
45331211

AS Vinmonopolet per day 315 shops. Of these, 150-160 stores which have a form of ventilation / cooling where it should be serviced. All stores should be included in the offer.

1000501 Campus Ås SLP K302 Heating and cooling systems

Statsbygg Hovedkontor | Published March 29, 2017  -  Deadline May 22, 2017
cpvs
42513200

Entreprise K302 includes complete systems for heating, komforkjøling and process cooling for the entire building stock (excluding building 143). Heating: The contract includes heat radiators, convectors, aerotempere, omluftssystemer, underfloor heating, heating coils in the air handling units and melting snow. The main heat source is heat recovered from several of the various facilities at the SLP, and heat from the condenser of the refrigeration machines. As peak load and back-up used district heating. The contract includes the supply of heat to the building 143, interfacing with another contract in facade. Cooling: The contract includes complete cooling center 3 pieces cooling units with ammonia refrigerant, a thermal cold storage 3 pieces underground tanks with PCM elements (phase change material) and a dry cooler park control for dumping excess heat. Product includes the supply of cold water to the cooling coils in the air handling units, fan coils, cooling baffles and computer room coolers. The delivery also includes process cooling associated with ultrafysere, refrigerating and freezing and cooling room with heat producing processes and equipment such as autoclaves, MR, battery compartment, the main distribution and luthydrolyse. The contract also includes the supply of comfort and process cooling construction 143, interfaces with other construction in the facade. Entreprisen successor two facing carcase contracts K210-1 Structural part 1 and K210-2 Structural part 2 and a structural construction K230 Seal construction. K240 structural work comprising a complete delivery of all construction works within the facades will coordinated implementation of technical contracts based on a common schedule. "Together Building a surface area of ​​about 27700 m2. Construction go from U3 to level 4, and is located on sloping terrain so that the plane U2 and plane 1 has access to terrain. Much of U2 lies with facades facing ground. U3 lies entirely below ground and consists mainly of culverts during a limited part of the building.

Construction work

Statsbygg Hovedkontor | Published March 30, 2017  -  Deadline May 22, 2017
cpvs
45000000, 45231113, 45331100, 44163000, 45331230, 42513200

The Directorate of Public Construction and Property (henceforth also referred to as Statsbygg) requests, in connection with project:

1000501 Campus Ås the Co-localisation project (SLP) NMBU-VI

Tenders for contract:

K302 Heating and Cooling installations.

Contract K302 includes complete installations for heating, comfort cooling and process cooling for all the buildings (except building 143).

Varme:

The contract includes heating for radiators, convectors, air heaters, recycled air systems, underfloor heating, heater batteries in air treatment aggregates and snow melting. The main heat source will be recycled heat from several of the different process installations at SLP, as well as heat from the condensation side of the cooling machines. District heating will be used as top-load and back-up. The contract includes the supply of heating for building 143, with interface with another contract in the facade.

Cooling:

The contract includes a complete cooling centre with 3 cooling machines with ammoniac as the cooling medium, thermal cold storage with 3 buried tanks with PCM elements (phase changing material) and a dry cold park on the roof for dumping excess heat. The delivery includes the supply of ice water to cooling batteries in air treatment aggregates, fan coils, cooling vents and computer room coolers. The delivery also includes process cooling for ultra-freezers, refrigeration room and freezer room, as well as cooling for rooms with heat producing processes and equipment such as autoclaves, MR, battery rooms, main distribution and lye hydrolysis. The contract also includes the supply of comfort and process cooling for building 143, with interface with another contract in the facade.

The contract succeeds 2 prior framework contracts K210-1 framework part 1 and K210-2 framework part 2 and a construction contract K230 sealed building. K240 Structural fitting work, which includes the complete delivery of all construction work within the facades, will be carried out coordinated with the technical contracts based on a joint progress plan.

Combined, the buildings have a footprint of approx. 27 700 m2. The buildings go from U3 to level 4, and lie in sloping terrain so that level U2 and level 1 have exits to the terrain. Large part of U2 are situated with facades against the terrain. U3 is completely under ground and consists mainly of culverts under a limited part of the building.

Framework agreement for service and maintenance / modernization of ventilation and cooling systems

Omsorgsbygg Oslo KF | Published December 7, 2016
cpvs
71315410, 42500000, 42510000, 42520000, 45330000, 45331000, 45331200, 45331210, 50000000

Framework agreement for service and maintenance / modernization of ventilation and cooling systems

Service and maintenance of ventilation and cooling (framework agreement)

Høgskolen i Oslo og Akershus | Published January 26, 2016
Winner
AF Energi og Miljøteknikk AS
cpvs
45331210, 71321400, 71315410, 50730000, 45331231, 45331230, 45331220, 45331211, 45331200, 45331000, 45330000, 45213210, 42530000, 42513000, 42500000

HiOA rents all of its premises and the contract's purpose is to cover HiOA need for craftsman services within

disciplines ventilation and cooling. The need includes periodic servicing equipment, running repairs and

additionally works for projects. The agreement may also include materials and ventilasjonsog

refrigeration equipment. It will

in addition, could be a need for advice on climate.

Based on historical data and projections about future needs, estimates HiOA that the contract's total value will be

between 1.5 and 2.0 million NOK excluding VAT per year, of which about two-thirds applies

ventilation and a third cooling. This amount shall not entail any obligation for HiOA or

Rights for supplier. Subject to the final scope will be dependent upon the college's needs

from year to year.

For projects with cost of over 500 000 excluding VAT, reserves HiOA

the right to announce a separate competition for procurement.

The acquisition includes two disciplines:

1. Ventilation

2. Cooling

Suppliers may submit tenders for one or both disciplines. HiOA will contract with a supplier

within each subject area.

Service and maintenance of ventilation and cooling (framework agreement)

Høgskolen i Oslo og Akershus | Published August 25, 2015  -  Deadline October 7, 2015
cpvs
45331210, 71321400, 71315410, 50730000, 45331231, 45331230, 45331220, 45331211, 45331200, 45331000, 45330000, 45213210, 42530000, 42513000, 42500000

HiOA rents all of its premises and the contract's purpose is to cover HiOA need for craftsman services in the fields of ventilation and cooling. The need includes periodic servicing equipment, running repairs and work in addition to the projects. The agreement may also include materials as well as ventilation and refrigeration equipment. There will also be a need for advice on climate. Based on historical data and projections about future needs, estimates HiOA that the contract's total value will be between 1.5 and 2.0 million NOK excluding VAT per year, of which about two-thirds the ventilation system and a third cooling. This amount shall not entail any obligation for HiOA or rights to provider. Subject to the final scope will be dependent upon the college needs from year to year. For projects with cost of over 500 000 excluding VAT, reserves HiOA the right to announce a separate competition for procurement. The acquisition includes two fields: 1. Ventilation 2. Cooling Suppliers may submit tenders for one or both disciplines. HiOA will contract with a supplier in each trade. Vendor shall offer letter specify which or which areas offer applies.

73082 Molde University College K 201 General Entreprise new cooling and heating plant and kicks

Statsbygg Hovedkontor | Published October 31, 2014  -  Deadline December 12, 2014
cpvs
45000000

Public Construction ask in connection with the project: No .: 73082 Name: Molde University College. New heating and cooling systems. tenders for construction: K 201 General Construction. New cooling and heating plant and kicks.