Cooling equipment renovation

Ministry for Foreign Affairs of Finland | Published September 22, 2017  -  Deadline October 4, 2017
cpvs
42500000, 45350000

The object of renovation is central cooling equipment in Embassy of Finland, Service Building, Riyadh, Saudi Arabia. Existing air-cooled chiller with nominal capacity 110 RT (refrigeration tons) is located on ground floor in cooling plant of the service building. The system has two air condenser. They are located on roof level above cooling plant. Existing cooling pumps and electrical board are located in cooling plant. Existing cooling plant serves all Embassy building. Renovation works concern demolition of existing chiller (1 pc), air condensers (2 pcs), refrigeration pipes and old refrigerant R22, old cables from existing electrical board to chiller and air condensers and supply, installation and start-up of new compact chiller package, cooling pipes and related balancing, start-up, adjustment works and related to this general obligations. Mechanical equipment and material supply and installation: - Supply and installation of new compact air cooled chiller package (1 pc), - Supply, installation and connection of cooling water pipes, fittings, insulation, local control instruments, valves, supporting and installation materials between. chiller and existing cooling pumps: - Supply and installation of fan coil 4 kW (1 pc) to cooling plant room, - Supply, installation and connection of cooling water pipes, insulation, valves, supporting and installation materials between main cooling pipe and new new fan. coil in cooling plant room. Structural works: - Supply and installation of structural steel materials and their installation so that the chiller package is about 500-600 mm over the existing steel beams, - Supply and installation of service platform zink coated grille around the chiller package. More detailed information available in the invitation to tender with annexes. The object of renovation is central cooling equipment in Embassy of Finland, Service Building, Riyadh, Saudi Arabia. Existing air-cooled chiller with nominal capacity 110 RT (refrigeration tons) is located on ground floor in cooling plant of the service building. The system has two air condenser. They are located on roof level above cooling plant. Existing cooling pumps and electrical board are located in cooling plant. Existing cooling plant serves all Embassy building. Renovation works concern demolition of existing chiller (1 pc), air condensers (2 pcs), refrigeration pipes and old refrigerant R22, old cables from existing electrical board to chiller and air condensers and supply, installation and start-up of new compact chiller package, cooling pipes and related balancing, start-up, adjustment works and related to this general obligations. Mechanical equipment and material supply and installation: - Supply and installation of new compact air cooled chiller package (1 pc), - Supply, installation and connection of cooling water pipes, fittings, insulation, local control instruments, valves, supporting and installation materials between. chiller and existing cooling pumps: - Supply and installation of fan coil 4 kW (1 pc) to cooling plant room, - Supply, installation and connection of cooling water pipes, insulation, valves, supporting and installation materials between main cooling pipe and new new fan. coil in cooling plant room. Structural works: - Supply and installation of structural steel materials and their installation so that the chiller package is about 500-600 mm over the existing steel beams, - Supply and installation of service platform zink coated grille around the chiller package. More detailed information available in the invitation to tender with annexes.

Kaupinoja district cooling plant: cooling pumps.

Tampereen Sähkölaitos Oy | Published February 24, 2016
cpvs
42122430

Kaupinoja district cooling plant: cooling pumps.

Gas cooling systems

Baltic Connector Oy | Published May 18, 2017  -  Deadline June 6, 2017
cpvs
31161200

The scope of the contract covers the supply of equipment and materials of the air-cooled heat exchanger unit for compressor and metering station for Balticconnector project in Finland together with services listed in the procurement documents.

The scope of the contract covers the supply of equipment and materials of the air-cooled heat exchanger unit for compressor and metering station for Balticconnector project in Finland together with services listed in the procurement documents. Module G or H1 shall be applied for conformity assessment according to directive 2014/68/EC (PED) of the European Parliament and of the Council.

The procurement covers the following supplies and services:

Supplies:

— air-cooled heat exchanger, supporting frame, electrical motors, transmissions and required auxiliaries such as ball valves, blind flanges, plugs, bolting, gaskets for vents, drains and junction boxes,

— design pressure 80 bar, design min temp. C -40,

— fluid type: natural gas, nominal flow rate: 300 000 Nm3/h.

Services:

— tests and inspections in factory,

— preservation, packing, marking and shipping,

— storing at the factory,

— documentation and certification,

— delivery to the delivery address (Inkoo, Finland),

— other services necessary for the completion of the supply scope.

The supplies and services will be described in more detail in the specifications which will be provided to the Candidates invited to the negotiations.

The latest water cooling unit

Tasavallan presidentin kanslia | Published June 16, 2015  -  Deadline August 10, 2015
cpvs
42500000

Water cooling unit to be acquired is air cooled, equipped with ulkosovitteinen free cooling device. Water cooling unit cooling capacity of approximately 350 kW outdoor temperature of 35 degrees Celsius and free cooling power of around 150 kW outdoor temperature of 5 degrees Celsius. Acquisition includes the required heat exchanger, which allows the water cooling unit is connected to the property there is a cooling water system. Cooling water supply temperature 7/12 degrees Celsius and free cooling 10/13 degrees Celsius. Water cooling unit is placed in the water on the roof and on the floor below the heat exchanger located in the technical room. Wear medium is 35% of the water etyleeniglykoliliuos. The contract includes installation and commissioning works of equipment, as well as the warranty period servicing and warranty repairs. Target acquisition, and the requirements applicable to it are described in detail in the attached HVAC and according to the RAU document lists the plan documents. NOTE! Ad information can be found Tarjouspalvelu.fi -toimittajaportaalista. Also on offer / request to participate, the transmission is done in this way. A direct link to the notification the additional information can be found here Hilma notification.

Factory-made cooling center

Kuopion Energia Oy | Published March 7, 2016  -  Deadline March 23, 2016
cpvs
42513200

Kuopio Energy Ltd acquires factory-finished operating a cooling capacity of about 1.5 MW transportable district cooling stations. Estimated deployment in October-November 2016.

Factory-made cooling center.

Kuopion Energia Oy | Published March 11, 2016  -  Deadline March 23, 2016
cpvs
42513200

Kuopio Energy Ltd acquires factory-finished operating a cooling capacity of about 1.5 MW transportable district cooling stations. Estimated deployment in October-November 2016.

City Hall cooling

Paraisten kaupunki | Published June 13, 2014  -  Deadline June 30, 2014
cpvs
45000000, 45331230

Paraisten city / service functions to request a quotation in the house cooling contract for technical

Factory-made cooling center

Kuopion Energia Oy | Published May 19, 2016
cpvs
42513200

Prefabricated be transferred to the district cooling center

Factory-made cooling center

Kuopion Energia Oy | Published May 19, 2016
cpvs

Prefabricated be transferred to the district cooling center

The cooling system renovation

Haukiputaan Kehitys Oy | Published February 2, 2015  -  Deadline February 16, 2015
cpvs
45000000

We ask kokonaisurakkatarjoustanne property cooling system on the improvement of the letter of invitation and mentioned below in accordance with the tender documents. The contract includes a new ulkoasenteisen cooling water status of the installation, as well as the old refrigerants associated with demolition. More information in the tender dossier.

TTY / machine house, laser-cooling

TTY-säätiö | Published April 26, 2016  -  Deadline May 13, 2016
cpvs
45300000

Laser Equipment to be built in cooling system. Construction includes plumbing, electrical, automation and cooling unit works.

TTY / machine house, laser-cooling

TTY-säätiö | Published April 26, 2016  -  Deadline May 13, 2016
cpvs
45300000

Laser Equipment to be built in cooling system. Construction includes plumbing, electrical, automation and cooling unit works.

DN400 cooling elements

Tampereen Sähkölaitos Oy | Published June 20, 2017  -  Deadline July 17, 2017
cpvs
44163120

acquisition of parts of the Clock Gate Street - - cooling elements with Kiinnivaahdotettujen of polyethylene and Ranta-Tampella project, Tampere Power Ltd's use. This is an EU-subthreshold specific areas of procurement. acquisition of parts of the Clock Gate Street - - cooling elements with Kiinnivaahdotettujen of polyethylene and Ranta-Tampella project, Tampere Power Ltd's use. This is an EU-subthreshold specific areas of procurement.

Kaupinoja district cooling plant, pumps.

Tampereen Energiantuotanto Oy | Published April 26, 2014  -  Deadline May 9, 2014
cpvs
42122430

Tampere Energy Production Ltd in cooperation with the Tampere district heating Oy to build a district cooling plant in Tampere Kauppi. Cooling water is used Näsijärvi water and district cooling network of softened water. This acquisition is all about Tampere Energy Ltd's acquisition of the pumps.

cooling elements: Biokatu DN500

Tampereen Kaukolämpö Oy | Published July 3, 2015  -  Deadline July 24, 2015
cpvs
44163120

Tampere District heating Oy in the future DN500 kiinnivaahdotetut cooling elements and parts. (This is in specific areas of EU procurement below the threshold)

Kaupinoja district cooling plant, power distribution equipment

Tampereen Energiantuotanto Oy | Published October 31, 2014  -  Deadline November 17, 2014
cpvs
31200000

Tampere Energy Production Inc. designs of up to 40 MWth kaukojäähdytystehoisen MV Kauppi plant in the area (district cooling network design temperatures: 8/16 ° C). A cold source of energy would be used adjacent the bottom of Näsijärvi the water. The cooling power demand increases is also used in the cooling machines to produce the required cooling energy (water chiller to produce the lowest temperature of + 6 ° C). District cooling is produced by the Department of the four free cooling järvivesi- kaukojäähdytyslämmönvaihtimella and May-June of water cooler (vedenjäähdytinyksiköiden designed nimellisjäähdytysteho 2 - 6 MW / unit). Kaupinoja surface water treatment plant planned in conjunction with the cooling body fed to free-cooling and condensation water kokonaisvirtausmääräksion agreed on a maximum of 700 l / s (free cooling chillers and condensing is coupled in series). The lake water temperature varies with the season and the long-term weather conditions, so that in winter the temperature is approx. 4 ° C and the water has warmed up ylimmilleen, approx. 14 ° C. The plant is designed for automatic unmanned operation in mind. The district cooling plant will be placed in a natural park in the vicinity of the plant and, in addition, next to the surface of the water treatment plant, which supplied drinking water distribution of water to the city of Tampere. This acquisition consists of the 20kV switchgear, distribution transformers and distribution centers. Now connected load is approx. 8MVA.

Kaupinoja district cooling plant, water coolers.

Tampereen Energiantuotanto Oy | Published November 12, 2013  -  Deadline November 25, 2013
cpvs
42500000, 31141000

Tampere Energy Production Ltd is planning up to 40 MWth kaukojäähdytystehoisen kj for the construction Kauppi area (district cooling network design temperatures: 8/16 ° C). A cold energy source in the background of Näsijärvi adjacent to the water. The cooling power demand increases is also used in refrigeration machines to produce the required cooling energy (water coolers provide the lowest temperature 6 ° C). District cooling plant produced four free cooling lake water as well as 5-6 kaukojäähdytyslämmönvaihtimella of water cooler (vedenjäähdytinyksiköiden designed Nominal cooling of 2-6 MW / unit). Kaupinoja surface water treatment plant for the planned plant discharged into the cooling and free cooling lauhdutusveden kokonaisvirtausmääräksion an up to 700 l / s (free cooling chillers and condensing is in series). The lake water temperature varies with the season and the long-term according to the weather, so that in winter the temperature is about 4 ° C and the water has warmed up ylimmilleen, about 14 ° C. The plant is planned to automatic unmanned operation in mind. The district cooling plant will be located near the park's natural and in addition the plant is located next to the surface of the water treatment plant, which supplied drinking water from the City of Tampere water supply.

Cooling device for the newborn power unit

HUS-Logistiikka liikelaitos | Published July 13, 2017  -  Deadline July 21, 2017
cpvs
33100000

NOTE! The deadline for the receipt of tenders was extended. Otherwise, the invitation to tender has not been modified. Cooling device for newborn power (VY1116031). Cooling care for asphyxiating newborns. In cooling treatment, the baby's body temperature is lowered for 72 hours to 33.5 ° C, after which the body temperature is raised slowly and controlled to the normal area. NOTE! The deadline for the receipt of tenders was extended. Otherwise, the invitation to tender has not been modified. Cooling device for newborn power (VY1116031). Cooling care for asphyxiating newborns. In cooling treatment, the baby's body temperature is lowered for 72 hours to 33.5 ° C, after which the body temperature is raised slowly and controlled to the normal area.

Cooling equipment maintenance tasks 2017-2018

Senaatti-kiinteistöt | Published November 17, 2016  -  Deadline December 12, 2016
cpvs
50730000

Undefined Contract includes cooling equipment Senate Properties in Western Finland region maintenance tasks in 2017 ... 2018. Contract includes cooling equipment Senate Properties in Western Finland region maintenance tasks in 2017 ... 2018.

Cooling device neonatal ICU

HUS-Logistiikka liikelaitos | Published June 29, 2017  -  Deadline July 14, 2017
cpvs
33100000

Cooling device newborns power (VY1116031). Asfyktisten neonatal viilennyshoito. Viilennyshoidossa child's body temperature is reduced for 72 hours at 33.5 ° C, after which the body temperature is slowly increased to normal and the controlled area. Cooling device newborns power (VY1116031). Asfyktisten neonatal viilennyshoito. Viilennyshoidossa child's body temperature is reduced for 72 hours at 33.5 ° C, after which the body temperature is slowly increased to normal and the controlled area.