Call +44 800 9755 164

Public tenders for furniture in Gdynia Poland

Find all Furniture tenders in the world.
Finding business opportunities has never been easier.

Results for furniture. Make a new search!

Gdynia: Manufacturing, assembly and disassembly 2 pcs. Of urban furniture on the street. Starowiejska in Gdynia

Zarząd Dróg i Zieleni w Gdyni | Published July 27, 2016  -  Deadline October 31, 2017
1. The contract is for construction, assembly and disassembly 2 pcs. Of urban furniture on the street. Starowiejska in Gdynia - based on the building-executive, technical specifications and conditions for the implementation of construction works and the bill of quantities - excluding items affecting filling and planting in pots, greenery maintenance and storage. 2. A detailed description of the contract provides: a) construction project - executive - Appendix A to SIWZ, b) the technical specifications - Annex B to SIWZ c) bill of quantities - Annex C to siwz ..

Road transport services

Pomorski Park Naukowo – Technologiczny Gdynia | Published November 19, 2016  -  Deadline December 28, 2016

1.Przedmiotem contract is the service of transportation, assembly and dismantling of exhibition stands along with providing technical support during the three international trade fairs.

The Contractor may submit an offer for all or some of their part of the contract:

Part 1 covers the services of transport, assembly and dismantling of the exhibition stand along with providing Serv. techn. during the exhibition Bett Show in London in the period from 25 to 01/28/2017.

Part 2 covers the services of transportation, assembly and dismantling of the exhibition stand along with providing Serv. techn. during the exhibition Mobile World Congress in Barcelona in the period from 27.2. to 03.02.2017.

Part 3 covers the services of transport, assembly and dismantling of the exhibition stand along with providing Serv. techn. during the exhibition CeBIT in Hanover from 20 to 03/24/2017.

Detailed description of the contract and the obligations of the Contractor is contained in the Terms of Reference and est. In particular in the Annex. 7 and 8.

The Contractor is obliged to:

The transfer of equipment Contractor will be held on weekdays, ie. From Monday to Friday from 8:00 until 16:00.

b.Zapewnić appropriate to the transported equipment packaging and carry the following equipment:

0,5 m

0.15 m

0.15 m

1.0 m

-10 TVs 42 "or alternatively electronic devices with dimensions not exceeding 10 TV 42"

-panele Floor: 50 pieces with dimensions of 1.0 mx 1.0 m, mdf laid the panels and baseboards at the floor and skirting boards

-kable internet and extenders - 10 pieces

-2 Suitcases with stands and display advertising in the housing dimensions housing dimensions: 1854 cm x 2250 cm x 428 cm

-2 Cabinet with dimensions of 0.9 mx 0.3 mx 0.8 m

-4 Tops wood with dimensions of 1.2 mx 0.3 mx 1.4 m

-8 Hokerów seats with dimensions 0.5 x 0.5 x 1 m

-8 Stools stumps with dimensions of 0.5 mx 0.5 mx 1.0 m

-Ściana Consisting of a mobile element, juxtaposed with one another in width (of the wall 3 with a width of 99 cm, a width of 4 wall 191 cm 2 the walls of a width of 150 cm) and a height of 300 cm

-Oświetlenie Halogen, consisting of a maximum of 10 points diodes.

c.Zmontować of przewiezionego equipment exhibition stand measuring 50 m2 open on four sides and connect required utilities (electricity, lighting, internet) and all the utensils, and set, as agreed with the representatives of the Employer, furniture and other equipment.

18.00.

18:00 on 24 January 2017r.

f.Oddawane the Employer booth must be ready for use, ie. clean, with connections to the electricity network and the Internet, and lighting (cables laid under the floor).

Since the time taken for maintenance tasks is the criterion for evaluation of bids, the Contractor is obliged to ensure the commencement of work by people dedicated to maintenance at the time indicated in the offer, but no longer than 2 hours of notification.

15:00.

22:00 and on 29.01.2017.

Reception will be able to take place during working hours of ordering ie. From Monday to Friday from 8:00 until 16:00.

k.Szczegółowy description in the tender documents.

The Contractor is obliged to:

The transfer of equipment Contractor will be held on weekdays, ie. From Monday to Friday from 8:00 until 16:00.

b.Zapewnić appropriate to the transported equipment packaging and carry the following equipment:

0,5 m

0.15 m

0.15 m

1.0 m

-10 TVs 42 "or alternatively electronic devices with dimensions not exceeding 10 TV 42"

-panele Floor: 50 pieces with dimensions of 1.0 mx 1.0 m, mdf laid the panels and baseboards at the floor and skirting boards

-kable internet and extenders - 10 pieces

-2 Suitcases racks advertising

Screen-housing dimensions housing dimensions: 1854 cm x 2250 cm x 428 cm

-2 Cabinet with dimensions of 0.9 mx 0.3 mx 0.8 m

-4 Tops wood with dimensions of 1.2 mx 0.3 mx 1.4 m

-8 Hokerów seats with dimensions 0.5 x 0.5 x 1 m

-8 Stools stumps with dimensions of 0.5 mx 0.5 mx 1.0 m

-Ściana Consisting of a mobile element, juxtaposed with one another in width (of the wall 3 with a width of 99 cm, a width of 4 wall 191 cm 2 the walls of a width of 150 cm) and a height of 300 cm.

-Oświetlenie Halogen, consisting of a maximum of 10 points diodes

c.Zmontować of przewiezionego equipment exhibition stand with an area of ​​45 m², open on two sides and connect required utilities (electricity, lighting, internet) and all the utensils, and set, as agreed with the representatives of the Employer, furniture and other equipment

18:00

18:00 on the date 26.02.2017.

f.Oddawane the Employer booth must be ready for use, ie. clean, with connections to the electricity network and the Internet, and lighting (wiring laid the

Gdynia: Development of multi-branch project documentation, technical specifications of the workmanship and the receipt of work for the task: Reconstruction of the building No. 26, located in the Hospital of the Marine street the January Uprising 1

Szpitale Wojewódzkie w Gdyni Sp. z o.o. | Published July 22, 2016  -  Deadline December 15, 2016
1. Development of multi-branch project documentation, technical specifications of the workmanship and the receipt of work for the task: Reconstruction of the building No. 26, located in the Hospital of the Marine street the January Uprising 1, including the acquisition of appropriate formal and legal documents in the design process and procedure of the building permit, execution of implementation and the author's supervision at the stage of execution of works. The scope of the contract: Object of the contract include: 1) the execution of a complete multi-branch design documentation (construction and executive), together with all required arrangements necessary to obtain a permit for the reconstruction of the following: a) architectural and construction, b) draft regulations, c) the project design together with an assessment of the technical condition of the building under reconstruction, d) the design of medical technology, e) the design of interior design with the colors and designs executive furniture (zabudowywanych fixed and mobile), f) the design of sanitary installations and ventilation g) the design of electrical installations and telecommunication, h) information on the safety and health protection. 2) Implementation of multi-branch updating inventory building to the extent necessary for the preparation of project documentation. 18.05.2004 r. On the methods and bases for preparation of the investment cost estimate, calculating planned costs of design works and planned costs of works specified in the functional and operational program in a detailed version of the bill of quantities and taking into account the phasing. 4) Development of technical specifications for execution and acceptance of works in electronic form. 5) Obtaining a building permit. 6) The exercise of the author's supervision. 7) The scope of the project includes obtaining all arrangements for a range of investments and in particular: a) the protection of fire protection. for the whole building, b) to meet the requirements of sanitary-epidemiological the scope of the project. A detailed description of the object of the contract: All materials and construction products must have certificates allowing for use, certificates of compliance with Polish standards and hygienic certificates. 2.1 Part of the architectural The building is currently 26 branches are located in: - Level -1 - Diagnostics -Work. mammography, CT, pom. technical (level excluded from the design) - Ground floor - Department of Radiation Therapy - 36 beds - Second Floor - Department of Radiation Therapy - 36 beds - Second Floor - Hospital Chemotherapy Unit (patients fixed line) - 34 beds. Of 2100 m2. 2.2 The Employer shall determine the new location of the different branches of the design of: - Ground floor - entrance from the chapel (from the south) - a minimum of 20 posts for chemotherapy patients daily (patients coming). - Ground floor - the rest of the ground floor (from the North) must be designed for the needs of the Department of Chemotherapy fixed (hospital). 300m2 from the north), the Division of Chemotherapy fixed (hospital) should be designed also for the needs of the Chemotherapy Department fixed the total number of beds ground floor and I p. -34. - First floor - the remaining part I p.9 (from the south) should be designed for the Department of Radiotherapy - second floor - a whole must be designed for the Department of Radiotherapy, Part I, p. And the entire second floor. Must be designed for 52 beds stationary.
  • 1