Public tenders for locker in Poland

Find all Furniture tenders in the world.
Finding business opportunities has never been easier.

Results for furniture. Make a new search!

Overhaul of the roof of the locker room at the School of fat.

 | Published August 7, 2013  -  Deadline August 22, 2013
cpvs
45400000

Repair of the roof of the locker room at the School in fat.

Overhaul of the roof of the locker room at the School of fat.

 | Published September 24, 2013  -  Deadline October 9, 2013
cpvs
45400000

Repair of the roof of the locker room at the School in fat.

Construction of the locker room LZS in Borkowice.

 | Published July 16, 2013  -  Deadline July 31, 2013
cpvs
45212000

The contract is for the construction of the locker room LZS in Borkowice a usable area of ​​94.94 m2 and a volume of 282.28 m3 detailed scope of work and the way they are implemented is defined in the project documentation, the bill of quantities and specifications of the technical implementation and acceptance of works developed for the purposes of this order. .

Modernization of the locker room in the building of the Primary School No. 38 in Łódź, ul. Krochmalna 21 (renovation of the locker room).

 | Published May 27, 2014  -  Deadline June 11, 2014
cpvs
45000000, 45433000, 45450000, 45262522, 45410000, 45431000, 45432112, 45432111, 45422100, 45320000

The subject of this contract is the modernization of the locker room in the building of the Primary School No 38 in Lodz, ul. Krochmalna 21, which includes the following works: - replacement of floor, - replacement windows - replacement of woodwork door, - replacement of cladding floors, cabins cisterns, casing installation water supply - sewerage, renewal paint in the renovated washroom at the locker room - replacement of internal plaster - Exchange sanitation. - Replacement of lighting fixtures, new-performance coatings - repair exterior wall insulation below the dressing room area - performance ventilation Z - replacement of rainwater (divisions) below the area of ​​land.

Construction of a sports locker room at the football field in Młodowie.

 | Published October 2, 2014  -  Deadline October 17, 2014
cpvs
45000000

The contract is for the construction of a sports locker room at the stadium in Młodowie in the following areas: 1 Building locker room: 1.1. Works. 1.2. Installation of water. can. social building with connections. 2 Connect the water supply. 3 Pavement and Tube buffer around the building. 4 Installation of cable connection policznikowego. 5 Installation of Branching and fuse boards. 6 Installation of lighting and sockets. 7 Ventilation, Air Conditioning, Heating. 8 Lightning protection ..

Katowice: Reconstruction of locker rooms for patient rehabilitation workshop for adults and children in the Team of Provincial Specialist Clinic in Katowice and the creation of the locker room with a bathroom for the disabled

Zespół Wojewódzkich Przychodni Specjalistycznych | Published July 19, 2016  -  Deadline July 18, 2016
Winner
INVEKO S.C. Rafał Gut, Marcin Gut, ul. Floriańska 50, 32-590 Libiąż, kraj/woj. śląskie.
cpvs
45000000, 45400000, 45453000, 45111100, 45410000, 45442100, 45432100, 45330000, 45310000

Reconstruction locker rooms for patient rehabilitation workshop for adults and children in the Team of Provincial Specialist Clinic in Katowice and the creation of the locker room with a bathroom for disabled people. As part of this will be done the following assortments of works: 1. locker room for children 1.1. construction, 1.2. work Plumbing, 1.3. construction and installation of mechanical ventilation, 1.4. electrical installation work. 2. Cloakroom for adults 2.1. construction, 2.2. work Plumbing, 2.3. construction and installation of mechanical ventilation, 2.4. works of electrical installations ..

Rebuilding a school locker in Junior Secondary School No. 12 in Gdansk, ul.Wrzeszczańska 29

 | Published May 19, 2014  -  Deadline June 5, 2014
cpvs
45214200, 45310000, 45331000

Scope of work: The scope of the reconstruction includes the execution of works in the basement with an area of ​​165.95 m2 on the locker room learner (theatrical) with room for a school employee and reconstruction of sidewalk between the main building and a gymnasium with a length of 48 m with reference to the existing newly constructed: I. WORKS demolition a newly designed interior walls b c d newly designed floor finishing works II. INSTALLATION WORKS: a replacement of the electrical installation b exhaust ventilation in the locker rooms and room service children's locker room c replacement of the heating system with radiators III.WYPOSAŻENIE LOCKER ROOM All works must be carried out in accordance with the accompanying documentation project of 2013, developed by the Design Laboratory at Gdansk. III. EXCHANGE SURFACE SIDEWALK.

Renovation of rural commons in Trzęsacz and reconstruction inside the locker room and land for a football field in Sarniku.

 | Published November 4, 2013  -  Deadline November 25, 2013
cpvs
45000000, 45453000, 45212220

The contract is for: Repair of a rural reconstruction in Trzęsacz and inside the locker room and land for the purpose of a football field in Sarniku. Description of the order states: Annex 10 to the specification of essential terms of the contract - description of the contract, the bill of quantities and - land development project remodeling the locker room on a football field in Sarniku (branch architecture), - design for remodeling the locker room on a football field in Sarniku (branch architecture and design), - design for sewerage connections for the locker room to pitch the Sarniku, - design for a sports locker room - plumbing - construction project remodeling the locker room to pitch the Sarniku - internal wiring.

Lublin: Services szatniarskie, ie .: service locker room facilities University in Lublin

 | Published August 28, 2014  -  Deadline September 9, 2014
cpvs
98300000

The contract is for service szatniarska, ie .: service locker room facilities University in Lublin. Detailed description of the object of the contract is given in Annex 1, 1.1 do1.4 to the ToR.

Comprehensive maintenance of cleanliness and service in the locker room facilities Warsaw Centers Recreation Wisła.

 | Published December 12, 2013  -  Deadline December 20, 2013
cpvs
90910000, 90911200, 90919200

The contract is a comprehensive maintenance and operation of the locker room cleanliness in facilities Warsaw Vistula River Recreation Centres. A detailed description of the course are: - the range of the cleaning services and service locker Namysłowska Center - Appendix 1 hereto, - the range of the cleaning services of the Centre Inflancka - Appendix 2 hereto, - the range of the cleaning services Leisure Centres Directorate of Warsaw Vistula - Appendix 3 hereto, - the material scope of cleaning services and service locker Centre Grzybowska - Appendix 4 to the Terms of Reference.

Fat: Execution of construction and installation works in the locker room primary school in Fat

Gmina Tłuszcz | Published August 31, 2016  -  Deadline May 23, 2016
Winner
Usługi Remontowo-Budowlane Dariusz Górecki, ul. Rembielińska 8a lok. 124, 03-349 Warszawa, kraj/woj. mazowieckie.
cpvs
45000000, 45214210, 45111300, 45262321, 45262522, 45310000, 45330000, 45331210, 45332000, 45331100, 45400000, 45410000, 45442100, 45432111, 45421131

1. The contract is: Execution of construction and installation works the locker room in the Primary School in fat. 2. The scope of the contract includes the execution: cross-industry construction and installation works to adapt premises level -1 (basement) for the student's locker room in the building of Primary School. John Paul II, ul. Ecclesial 1 in Fat. Currently used student lockers are located in the basement level and are separated in two rooms of varying heights. Locker rooms act as boxes with hangers hook and benches - separated walls of wire mesh - mesh in the upper part and lower part of the brick. Work to be performed is to modernize the rooms currently in use as changing rooms and adaptation to the respective functions other rooms cellar - based n / a studies project: 3. The detailed scope of work determines the design documentation, technical specifications of performance and acceptance of works. description of the order and bill of quantities.

Renovation of the stadium locker room Griffin in Mielec.

 | Published March 18, 2014  -  Deadline April 2, 2014
cpvs
45262690, 45320000, 45453000, 45310000, 45311000, 45311100, 45311200, 45312311, 45315700, 45331000, 45332000, 45333000, 71355000

1 The contract is for the execution of the renovation of the stadium locker room the fretboard in Mielec. Object of the contract, in particular, includes demolition and demolition, earthworks, foundations, insulation, masonry and reinforced concrete work, the ground and floors, windows and doors, plaster and finishing walls and ceilings, facades, roof - covering, drainage, flashings, replacement of part of the fence, internal installations - gas, sewage, hot and cold water, central heating, boiler, ventilation higrosterowalną, ventilation EDM, electrical installation (WLZ-you and boards, lighting system and draft, lightning protection, robots Inspection) supply and installation of container szatniowych and sanitation for the duration of the contract. 2 Detail the subject of the contract is specified in Volume III of the Terms of Reference ..

LOCKER ROOM RENOVATION SPORTS In Strzyżewo.

 | Published July 30, 2013  -  Deadline August 14, 2013
cpvs
45262500, 45262321, 45320000, 45324000, 45400000, 45410000, 45420000, 45421146, 45421152, 45431000, 45442100, 45442110, 45450000, 45330000, 45300000, 45310000, 45311000

1 The contract involves the implementation of the project under the name of a sports locker room renovation in Strzyżewo. The entire construction project includes the renovation of the locker room in Strzyżewo sports. The area covered by this investment is on plots No. 448 located in the town of Strzyżewo. The construction work is expected to: a place partitions on the cement - limestone blocks of cellular concrete, b walled holes in the walls, c replacement of windows and doors; d performance flooring tiles with cokolikami, e supplement internal plaster walls and revetment tiles left unattended execution gypsum plasters, f paints interior walls and ceiling; g replacement of the roofing of the trapezoidal sheet steel roofing tile flat roof with insulation mineral wool and replacing the drywall soffits. h execution of sewerage connections with PVC pipes Wed 160 mm with a length of 3.50 m, i replacing plumbing with white assembly, first replacement of the electrical system. NOTE: The basis for the valuation of orders are drawings and SST. The accompanying bills of quantities are purely incidental. 2 Terms of reference, hereinafter referred to as Terms of Reference consists not only of a substantial part of the descriptive, but also of all the constituent attachments, including the draft contract and its Annexes, on the implementation of a contract covered the subject of these proceedings. 3 Where in the project documentation materials or devices described by giving the name of the manufacturer, patents, or origin, in relation to such materials or equipment ordering allows for the inclusion in the offer, then the use of equivalent materials or equipment, provided that the performance is not as least such as materials or equipment, they substitute ..

Support the locker room in the building of the Centre of Foreign Languages ​​UJK in Kielce.

 | Published July 4, 2014  -  Deadline July 14, 2014
cpvs
98390000

The contract is to support the locker room in the building of the Foreign Language Center at the University of Jan Kochanowski Street. Swietokrzyska 21 D. A detailed description of the object of the contract is contained in Annex 1 to the Terms of Reference ..

CLEANING SERVICE WITH ARMED all day BUILDING AND LOCKER ROOM SERVICE.

 | Published May 14, 2014  -  Deadline May 22, 2014
cpvs
90910000, 79714000

The contract is for a cleaning service with all day supervision of the building and operation of the locker room. The detailed requirements in relation to the aforementioned services includes the specification of essential terms of the contract, Annex No. 2

Support the locker room in the building of the Centre of Foreign Languages ​​UJK in Kielce.

 | Published October 14, 2013  -  Deadline October 22, 2013
cpvs
98390000

The contract is to support the locker room in the building of the Centre of Foreign Languages ​​Jan Kochanowski University in Kielce, located at ul. Holy Cross 21 D. A detailed description of the contract contained in Appendix 1 hereto.

Expansion of Primary and Middle School in Głuchów of the locker room.

 | Published July 16, 2014  -  Deadline July 31, 2014
cpvs
45100000, 45200000, 45300000, 45400000

1. is projected expansion of the existing primary and middle schools in Głuchów of the locker room adjacent to the gymnasium building on the east side. Kompleksł halftime outerwear is made up of 7 boxes szatniowych of the vestibule and hallway. In addition, the main entrance to the school vestibule designed. Expansion in the traditional brick technology, roof made of panels 12cm thick. PVC joinery. The proposed extension is part single-storey, without basement to the roof with a small angle. 2. List of area and volume parts of the proposed: Built-up area ....................................... ............... 152m2 usable area ................................ Cubic capacity of 136m2 ....................... ......................... ................................................ 639m3 Expansion It aims to: -Improved functional school system by separating rooms in the changing rooms for children and young people at the ground level, -adjustment rooms to the existing sanitary regulations. Premises locker room will be linked functionally school building, which will ensure proper use of the building, efficient use of space, meet the requirements of sanitary, fire protection and safety. -.

Service security service locker room for patients in the autumn and winter in clinics SPZOZ Warsaw Wola Downtown.

 | Published October 25, 2013  -  Deadline November 5, 2013
cpvs
98341120

1) The contract is for the provision of services to the Employer in the use of the locker room in the outpatient SPZOZ downtown Warsaw Wola during autumn and winter in 2014. The scope of the above service includes: Support for the locker room to maintain law and order, protection of property left by visitors and the concomitant material liability for the property entrusted to it by users of the locker room, keeping the floor clean around the locker room and the good performance of assigned duties in the locker room following: a ) Cloakroom in Clinic at. Ciolek 1, open Monday through Friday between the hours of 7 ° ° - 19 ° °, in terms of 01.01.2014 - 30.04.2014 and 10.01.2014-31.12.2014 b) in the locker room Ambulance Street. Leszno 17, open Monday through Friday between the hours of 700 - 18 ³ º, dates from 01.01.2014 - 30.04.2014 and 01.10.2014-31.12.2014 c) the locker room in the Outpatient Clinic at. Grzybowska 34, open Monday through Friday between the hours of 7 ° ° - 19 ° °, in terms of 01.01.2014 - 30.04.2014 and 01.10.2014-31.12.2014 d) in the locker room Ambulance Street. Plock 49, open Monday through Friday between the hours of 7 ° ° - 19 ° °, in terms of 01.01.2014 - 30.04.2014 and 10.01.2014-31.12.2014 e) the locker room in the Outpatient Clinic at. 54 elective, open Monday through Friday between the hours of 7 ° ° - 19 ° °, in terms of 01.01.2014 - 30.04.2014 and 01.10.2014-31.12.2014 f) Cloakroom in Clinic at. Dragons 6A, open Monday through Friday between the hours of 7 ° ° - 19 ° °, in terms of 01.01.2014 - 30.04.2014 and 10.01.2014-31.12.2014 g) Cloakroom in Clinic at. Chmielnej 14, open Monday to Friday between the hours of 7 ° - 20 ° °, within the period 01.01.2014 - 30.04.2014 and 01.10.2014 - 31.12.2014 h) Cloakroom in Clinic at. Nowolipie 31, open Monday through Friday between the hours of 7 ° ° - 18 ° °, in terms of 01.01.2014 - 30.04.2014 and 10.01.2014-31.12.2014. In addition to the responsibilities of the locker room attendant to issue keys to the toilet - for all clinics. In the month of May, June, July, August and September locker rooms are closed. Working time locker room can change + / - 1 hour, to which the contractor is required to comply with. The Contractor shall ensure that current medical research and the training of health and safety of its personnel ..

Building the locker room at the sports field - execution of external and internal electrical system.

 | Published September 2, 2013  -  Deadline September 17, 2013
cpvs
45310000

The scope of work includes the implementation of the final phase of building work in the locker room at the sports field, ie external electrical installation for the building locker room - the power of an existing column in the parcel LV network and the internal wiring in the building. A detailed description and scope of work defined in the project documentation is annexed hereto. In cases where otherwise specified mark may be equivalent solutions. By ordering mind equivalents equipment, materials with parameters not worse than those specified in the design documentation, technical specifications and other documents specifying the object of the contract. They are used to identify the technical parameters, quality or functionality of the materials and equipment necessary for the proper execution of the order ..

Service conducting the locker room in the buildings UKSW Street. Wóycickiego and 1/3 Street. Dewajtis 5.

 | Published September 18, 2013  -  Deadline September 26, 2013
cpvs
98341140

The purpose of this contract is to conduct locker service in the buildings of the University of Cardinal Stefan Wyszynski University in Warsaw. Wóycickiego third and Street. Dewajtis 5 in Warsaw in the period from 01.10.2013 - 31.05.2014 r, 7 days a week from 7.30 to 20.30, according to the attached list of objects and the number of staff positions locker room, which is located in Chapter IV - Model Agreement. During the winter holidays and other days off from classes locker room is closed. A day off from classes Employer shall notify the Contractor, at least two days in advance. The Contracting Authority reserves the right to make changes to the opening hours of the locker room. It is the responsibility of the Contractor in the use of the locker room, in particular: 1) the adoption and issuance of outerwear, 2) watch clothing and stuff left, 3) ensuring the cleanliness and aesthetics of the locker room, 4) not letting any of the locker room for outsiders, 5) nice and Cultural service users off. The Contractor shall be liable for clothing left behind in the locker room and locker room for equipment provided by the Employer (numbers to the locker room, hangers). Employer allows partial bids for each separate lots: Part I - Cloakroom Street. Wóycickiego third, part II - Locker Street. Dewajtis 5 Each Contractor shall have the opportunity to bid on your desired part or parts. A detailed description of the contract is set out in Chapter IV of the Terms of Reference - description of the contract. Other terms of the contract are set out in the contract. Order set is the number of CPV 98.34.11.40-8 services (surveillance). The Contractor is required to indicate in the tender part of the contract the performance of which it intends to subcontract. Failing to indicate the subcontractor will be understood that the contract is fully executed by the Contractor submitting the offer.