Public tenders for locker in Denmark

Find all Furniture tenders in the world.
Finding business opportunities has never been easier.

Results for furniture. Make a new search!

Lockers, benches and hooks for locker rooms

Erhvervsakademiet Lillebælt // CVR:31684307 | Published April 25, 2016  -  Deadline May 16, 2016
cpvs
45212230

Erhversakademiet Little Belt In connection with the establishment of the new campus, use 40 Lockers (lockers) for changing rooms.

In the case of changing rooms 2, of which to be installed in the lockers 20 each. See attached sketch.

Model: Z-shape
Colour: Grey
Locking System: Padlock
Base: Closed and jointed at the bottom

1. dressing rooms:
Wall with creating = 6.5 meters, of which there must be placed a bench in the middle. In addition, placing a bench in the middle of the room with loose hooks in the bench length. The length of the bench is 3.87 meters.

2. dressing room:
Wall with creating = 4.80 meters, of which there must be placed a bench in the middle. In addition, placing a bench in the middle of the room with loose hooks in the bench length. The length of the bench is 2.91 meters.

It is expected that the supplier must himself take the ultimate goal, and provides setup.

Conversion and extension of locker rooms, meeting rooms and training hall at Sydtoftens Plejecenter in Grindsted

Billund Kommune | Published February 10, 2015  -  Deadline February 19, 2015
cpvs
45000000

The renovation includes a refurbishment of existing commercial kitchen, which changes to training hall and toilets and changing facilities here. In addition, a department with cold room. The area of ​​redevelopment is a total of 260m². Extension consist of two smaller expansions. An extension of the existing staff changing room of 52 square meters. An extension of 126 m² which includes 2 meeting rooms, as well as time related to it.

Construction work

Odsherred Kommune | Published December 23, 2016
Winner
B. Nygaard Sørensen A/S
cpvs
45000000

Approximately 3,000 m² new construction. Multi-purpose hall, ballroom, fitness, shooting range, locker rooms, cafe mm.

Main contract.

Lockers 2014 / S 169-300231

Svendborg Kommune | Published September 4, 2014  -  Deadline October 21, 2014
cpvs
44421720, 44421300

Lockers Supply is a New tender of mechanical protection from April 2014 as lot 2 in the first tender was canceled, and the rendering of mechanical protection to the member municipalities of KomUdbud who have committed to using it hereby offered Framework Agreement (hereinafter originator). Mechanical security include in this contract alone safes, key cabinets and PC and tablet create, called lot 2 as benævnet of the first call.

Midtfyns Leisure - New hot tub and renovation of swimming pool

Faaborg-Midtfyn Kommune | Published January 7, 2016  -  Deadline February 4, 2016
cpvs
71210000

New hot water: There should be constructing a new hot tub in Midtfyns Leisure. As well as renovation of existing ones. There has prepared a catalog of ideas for the new hot tub, see Annex 10 - "catalog of ideas for hot tub" Renovation of existing shall include: Renovation of the bottom of the Great Basin: There is a great need for a new reservoir bottom, as the existing bassindug's lifespan of approximately 10 years ago, and there are several bumps in the bottom. Therefore, making a new tile floor to the tank, or alternatively bassindug. Renovation of mens locker: Conversion of existing changing rooms for men in connection with the swimming pool, with New walls for toilets, new toilet, new shower area and locker rooms. In addition, total renovation of tiling and other surfaces and installations.

Architectural, construction, engineering and inspection services

Silkeborg Kommune | Published August 13, 2016
Winner
RUM a/s
cpvs

The original Nordre School (later called Sølyst School, Nordre department) located on Nylandsvej 16 in Silkeborg, has been closed since sommerren 2014. The school must now demolished (but retained existing gyms and locker rooms located against playing fields) and on that area are planned performed respectively new Cultural Centre (approximately 500 m²) and 36 residences designed for use for mentally disabled. In the residential section also includes common areas and facilities for staff (a total of about 2,700 m²).

Brenderup Activity - New Idrætshal

DEN SELVEJENDE INSTITUTION BRENDERUP AKTIVITETSC // CVR:21293679 | Published January 6, 2015  -  Deadline January 23, 2015
cpvs
45212225, 45212230

This applies prequalification for the following task. The new hall is offered as a turnkey conversely invitation contest. The hall must meet the requirements of DHF, and additionally contain the foam pit, locker rooms, etc.. Total area is expected around 1,500 m². Target price: 12.5 million. kr. excl. VAT. There is competition therefore include offered scope, layout, architecture and materials. The hall is desired into use as soon as possible - up to 1 / 9-15. The rest of the building can be handed in later. The Contracting Authority is the independent institution Brenderup ACTIVITY.

The refurbishment and extension of Skjern Bank Aren

Ringkøbing-Skjern Kommune | Published May 3, 2014
Winner
Jens Jensen Murer og Entreprenør A/SNiels Ebbesensvej 11Holstebro 7500 +45 96108400
cpvs
45000000, 71000000

The refurbishment and extension of Skjern Bank Arena, so that the spectator capacity after redevelopment is about. 3 100 people. Arena expand with new stand, lobby, lounge and locker rooms. Expansion includes approx. 3000-3500 m2 and the establishment of outdoor areas, including parking facilities. About and the extension has to be offered as a turnkey contract (with a target price) in limited supply with prequalification. The contract includes the design and execution. The turnkey contractor is expected to team up with the following sub-consultants: architects, consulting engineers and possible. landscape architect.

Construction work

Region Midtjylland, Det Nye Universitetshospital, Projektafdelingen | Published July 31, 2014
Winner
Bravida Danmark A/SPark Allé 373Brøndum 2605
cpvs
45000000, 45210000, 45300000, 45400000

This contract covers subproject abdominal / inflammation, tender area S3 at the new University Hospital in Aarhus (DNU). Contract Area S3 contains primarily: Research, office and locker at level 01, the dialysis section outpatient endoscopy section at level 02, operating at level 03 and technique at level 4 Contract area is approx. 12 000 m² new construction.

Conversion and extension of Skjern Bank Arena.

Ringkøbing-Skjern Kommune | Published November 9, 2013  -  Deadline December 11, 2013
cpvs
71000000, 45000000

Conversion and extension of Skjern Bank Arena, so that the spectator capacity for redevelopment is about. 3100 persons. Arena expanded with new stand, lobby, lounge and locker rooms. Extension comprises approx. 3,000 to 3,500 m2 and the establishment of outdoor areas, including parking facilities. About and extension are offered as a turnkey contract (with a target price) in limited supply with prequalification. The contract includes the design and execution. Total contractor is expected to team up with the following sub-consultants: architectural, engineering and possible. landscape architect.

Construction work

Jyllingehallerne | Published August 23, 2016
Winner
Svend Aage Christiansen A/S
cpvs

Much of Jyllinge halls burned down in July 2014. The Contracting Authority wants reconstruction and expansion of gymnasiums, locker rooms, cafeteria and administration under the main project, the contracting entity commissioned by PP Consult A / S, the architects Cornelius + Vöge ApS and Stokvad Advisory engineers A / S. Blueprint 6211 m², 1st floor 1 467 m² and renovation of the basement 680 m². Building and anlægspgaven offered the following in one big contract: unfinished buildings and living quarters. The task includes: Soil, concrete, sewage, construction site, steel, roofing and closing (råhusdelen). Inside complete ring comprising: joinery / carpentry, masonry, painting and floor (aptereringsdelen).

Restricted - Turnkey - Closer Nyvang park with 33 assisted living facilities and associated service facilities.

FOB Kalundborg | Published August 24, 2013  -  Deadline September 23, 2013
cpvs
45000000, 71000000

Plejecentret be extended by 33 social care homes with associated service facilities. 3 existing wings containing outdated homes demolished immediately before construction is started, the demolition is part of the turnkey contract. It is collected for approx. 2 630 m2, which includes assisted living facilities, common areas, locker rooms, laundry room and utility room, storage and 2 decentralized offices with associated staff toilets, as well as two local art spaces. Creation and restoration of the outdoor areas are also part of the turnkey contract. The job is offered on the basis of a work program and a conceptual equivalent to conceptual design. Total Contractor's advisers must therefore complete the project to the main project.

Ørestad Ice rink. Total Counseling.

Københavns Kommune, Kultur- og Fritidsforvaltningen, Københavns Ejendomme | Published September 4, 2013  -  Deadline October 3, 2013
cpvs
71200000, 71300000, 71400000, 71500000

Copenhagen Properties plans to build a new ice rink in the Arena District Ørestad Syd and want to assign a lead consultant for this project. Skating Hall is expected to include a hockey court, auditorium and facilities, locker rooms, club facilities, weight training and storage rooms, equipment rooms and various auxiliary rooms. Ice rink Lens gross area is expected to be approx. 6 000 m2. The plot is approx. 4 500 m2 and is located immediately west of the upcoming Copenhagen Arena. It is expected that the lead consultant to provide architectural and engineering advice from the program phase up to and including complete construction, commissioning and 1-year inspection.

Ørestad Ice rink. Total Consultancy.

Københavns Kommune, Kultur- og Fritidsforvaltningen, Københavns Ejendomme | Published February 15, 2014
Winner
Christensen & CoBragesgade 10bKøbenhavn N 2200 www.cco.as
cpvs
71200000, 71300000, 71400000, 71500000

Copenhagen Properties plans to build a new ice rink in the Arena District in Ørestad Syd and want to assign a lead consultant for this project. Skating Hall is expected to include an ice hockey rink, auditorium and facilities, locker rooms, club facilities, weights room and storage room, technical room and various auxiliary rooms. Ice rink Lens gross area is expected to be approx. 6 000 m2. The plot is approx. 4 500 m2 and is located immediately west of the upcoming Copenhagen Arena. It is expected that the lead consultant to provide architectural and engineering advice from the program phase up to and including the completed building, deploying and 1 year inspections.

Playground equipment

Nyborg Kommune | Published March 2, 2017
Winner
HAGS Danmark A/S
cpvs
37535200

Modernisation of the playground at the special school Foxes Bakkeskolen include the establishment of:

Mandatory: Swings Sandbox Environment Climbing Rocker Sandgrav m. Up / down ramp.

Additional:

6. Gas Station

7. Replacement of networks in existing climbing hexagon

8. Sand Ting locker.

The task has a fixed budget of DKK 300 000, which the bidder must offer the mandatory and including meet as many of the additional products as possible within the budget.

The playground should be the modernization meet DS / EN 1176-1, 1176-2, 1176-3, 1176-4, 1176-5, 1176-6, 1176-7, 1177th

Global navigation and positioning systems (GPS or equivalent)

Københavns Kommune, Teknik- Miljøforvaltningen TMF Stab | Published September 1, 2016
Winner
Fleet Intelligence IVS
cpvs

Delivery and installation of global positioning systems in the fixture so that the buyer gets an overview of the administration's diverse fleet of effective capacity management. Similarly, the buyer a great need to document tasks completed, concrete presence etc.

Buyer's equipment park consists of the following major groups in equipment: tractors, mini tractors and rode locker carriers, trucks over 3 500 kg, vans below 3500 kg, vans with a compactor, vans, sweepers, vibrator rollers, pavers, excavators and reading machines, forklifts, small trolleys and toppers.

The buyer needs to collect GPS data both for normal driving and use of equipment unit, as well as whether any work function is active.

The buyer needs to GPS data sent to their own servers.

Construction work

Jyllingehallerne | Published August 23, 2016
Winner
JS Ventilation A/S
cpvs

Much of Jyllinge halls burned down in July 2014. The Contracting Authority wants reconstruction and expansion of gymnasiums, locker rooms, cafeteria and administration under the main project, the contracting entity commissioned by PP Consult A / S, the architects Cornelius + Vöge ApS and Stokvad Advisory engineers A / S. Blueprint 6211 m², 1st floor 1 467 m² and renovation of the basement 680 m². Construction job offered in the following major contracts: 1) unfinished buildings, 2) accommodation, and 3) technical installation contract. This grant concerns delkontrakten: '3) technical installation contract', since large entrance prices 1) and 2) have been genudbudt as one large contract in negotiated Notice number in OJ S: 2016 / S 058-097128.

Works 2015 / S 210-380621

Jyllingehallerne | Published April 5, 2016  -  Deadline July 13, 2016
cpvs
45000000, 45212000, 45212100, 45212140, 45212200, 45212212, 45212220, 45212225

A large part of Jyllinge halls burned down in July 2014. Contracting Authority wants the restoration and expansion of gymnasiums, locker rooms, cafeteria and administration under the main project, the contracting entity commissioned by PP Consult A / S, the architects Conelius + Vonge ApS and Stokvad, Consulting Engineers A / S. Blueprint 6211 m2, 1st floor 1467 m2 and renovation of the basement 680 m2. Building and anlægspgaven offered in the following three large contracts: Contract I, Råhusentreprise that include: Soil, concrete, sewage, construction site, steel, roofing and closing. Construction II, Interior completion contract which includes: joinery / carpentry, masonry, painting and floor. Construction III Technical installation contract which includes: electricity, plumbing and ventilation. Additional sheets are on www.rib-software.dk See section. VI.3).

Construction work

Jyllingehallerne | Published March 23, 2016  -  Deadline April 18, 2016
cpvs
45000000, 45212000, 45212100, 45212140, 45212200, 45212212, 45212220, 45212225

Much of Jyllinge halls burned down in July 2014. The Contracting Authority wants reconstruction and expansion of gymnasiums, locker rooms, cafeteria and administration under the main project, the contracting entity commissioned by PP Consult A / S, the architects Cornelius + Vöge ApS and Stokvad Advisory engineers A / S. Blueprint 6211 m 2 , 1st floor 1 467 m 2 and renovation of the basement 680 m 2 . Building and anlægspgaven offered the following in one big contract: unfinished buildings and living quarters. The task includes: Soil, concrete, sewage, construction site, steel, roofing and closing (råhusdelen). Inside complete ring comprising: joinery / carpentry, masonry, painting and floor (aptereringsdelen).

Additional sheets are on www.rib-software.dk See section. VI.3).

Construction work

Jyllingehallerne | Published October 29, 2015  -  Deadline November 25, 2015
cpvs
45000000, 45400000, 45210000, 45212000, 45212100, 45212140, 45212200, 45212212, 45212220, 45212225, 45212230

A large part of Jyllinge halls burned down in July 2014. Contracting Authority wants the restoration and expansion of gymnasiums, locker rooms, cafeteria and administration under the main project, the contracting entity commissioned by PP Consult A / S, the architects Conelius + Vonge ApS and Stokvad, Consulting Engineers A / S. Blueprint 6211 m2, 1st floor 1467 m2 and renovation of the basement 680 m2. Building and anlægspgaven offered in the following three large contracts: Contract I, Råhusentreprise that include: Soil, concrete, sewage, construction site, steel, roofing and closing. Construction II, Interior completion contract which includes: joinery / carpentry, masonry, painting and floor. Construction III Technical installation contract which includes: electricity, plumbing and ventilation. Additional sheets are on www.rib-software.dk See section. VI.3).