Public tenders for furniture in Tunyogmatolcs Hungary

Find all Furniture tenders in the world.
Finding business opportunities has never been easier.

Results for furniture. Make a new search!
FurnitureHungarytunyogmatolcs

Space for forming a number of experiences in the implementation of the Dead ecotourism attraction Somes development related projects construction works.

Jót s Jól Egyesület | Published November 11, 2015
Winner
CÍVIS-BAU ÉPÍTŐIPARI, TERVEZŐ ÉS KIVITELEZŐ Kft.
cpvs
45212000, 45212211, 45212420, 45213340

Part 1: splashdown point (u Fülpösdaróc 29.30) approach to ensure the water level of 3.2 x 1.0 m size járóhíd. Adventure Tower building (Fülpösdaróc hrsz 27) Accordingly, a functionally simplistic, finished with wood and supplemented blade pressed concrete staircase walls were planning any closure of its high roof, toronylezárást imitate, but original and unique. Satu Mini-Park (27 Fülpösdaróc u) the tables slightly tilted to easily read the inscription on them. Part 2: ditching one point station (Tunyogmatolcs 0209.hrsz) Water level approach to the 7.6 x 1.0 m step size, and the size of 1.8 x 1.0 m ensures járóhíd. Part 3 Touring Center, bream oven (Győrtelek) The furniture section serves as a stop on the trail that can be used in Gyor plot linked to local traditions and values ​​presented. The buildings around the square stone pavement cover made of white outer facade. Splashdown point (Győrtelek u 439.433) provides 3,2 x 1,0 m sized járóhíd. Part 4: Event Space (u Ököritófülpös 029.) The operation is planned 75 chairs in the project. Part 5: Station 2 splashdown point (u Tunyogmatolcs 653) at the end of two 3.0 x 1.0 m size csapóhíd imitates the ferry ramp which can be moved sodronykötéllel, csörlődobos ship wheel located in the midline. The corridor on both sides of the stairs 10 to 10 m in length will be built step rézsűbiztosítás catering and Hiking Centre (Tunyogmatolcs) net floor area of ​​161.65 m2. Part 6 Jungle Fruit (Géberjén 04.10. U) of different ages and interests nice range of people find their occupation and thus spend more time in this town. We secured a favorable planting distance of the plants used to be so easy to look after, maintain and spread of disease is less than in intensive installation. The shrubs used are chosen to be in all seasons're currently maturing fruit. The area in the middle of a large pergolas provide shade, which may be organizing smaller events as well. The playground marsh area of ​​approximately 150 square meters in area equilibrated and gravel. 7 x 1 meter diameter concrete cake is the basis into which are poured into 7 pieces 100 x 50 mm I-beam, with four corner columns (4 x 5 m floor space of 2.75 meters high), the other part is 0.25 meters high Who. These welded 50 x50 mm zártszelvényből is the foundation on which boat will be anchored to the floor. The exterior walls and interior trim work scenery. The 25-cm-inch height and two meters in length than those provided for more favorable slope to the disabled. The front wall is open four panel ruled that the evenings or holidays can be mounted. The above shown fűtakarás provide the final shape, which is formed such that the wire ropes stretching a double tree trunk, and the converted and the roof structure using the final form would show interesting perspective. Skating Rink This temperature range from -100 to + 80 ° C be used. The ice rink is an essential element of a 1.25 or 1 m in height backboard system, which provides easy track gate 2-4 up. The concrete surface must be such that the longitudinal axis in both directions from 1 to 1.5% slope has. Occasionally fit into each other OSB is used (this is the path not included). The detailed specifications of the tender documentation. Where the proceedings of the public notice or the technical specifications provided - including the printout is unpriced budget - around specific type of article that refers exclusively to the subject of the procurement in order to clarify Contracting equivalent to those adopted megajánlásokat. (310/2011. (XII.23.) Korm Section 26 (3))

A number of experiences Somes space for forming the Dead ecotourism attraction in the implementation of development works of construction related projects - informational contract amendment

Jót s Jól Egyesület | Published September 2, 2015
Winner
CÍVIS-BAU ÉPÍTŐIPARI, TERVEZŐ ÉS KIVITELEZŐ Kft.
cpvs
45212000, 45212211, 45212420, 45213340

Part 1: splashdown point (u Fülpösdaróc 29.30) approach to ensure the water level of 3.2 x 1.0 m size járóhíd. Adventure Tower building (Fülpösdaróc hrsz 27) Accordingly, a functionally simplistic, finished with wood and supplemented blade pressed concrete staircase walls were planning any closure of its high roof, toronylezárást imitate, but original and unique. Satu Mini-Park (27 Fülpösdaróc u) the tables slightly tilted to easily read the inscription on them. Part 2: ditching one point station (Tunyogmatolcs 0209.hrsz) Water level approach to the 7.6 x 1.0 m step size, and the size of 1.8 x 1.0 m ensures járóhíd. Part 3 Touring Center, bream oven (Győrtelek) The furniture section serves as a stop on the trail that can be used in Gyor plot linked to local traditions and values ​​presented. The buildings around the square stone pavement cover made of white outer facade. Splashdown point (Győrtelek u 439.433) provides 3,2 x 1,0 m sized járóhíd. Part 4: Event Space (u Ököritófülpös 029.) The operation is planned 75 chairs in the project. Part 5: Station 2 splashdown point (u Tunyogmatolcs 653) at the end of two 3.0 x 1.0 m size csapóhíd imitates the ferry ramp which can be moved sodronykötéllel, csörlődobos ship wheel located in the midline. The corridor on both sides of the stairs 10 to 10 m in length will be built step rézsűbiztosítás catering and Hiking Centre (Tunyogmatolcs) net floor area of ​​161.65 m2. Part 6 Jungle Fruit (Géberjén 04.10. U) of different ages and interests nice range of people find their occupation and thus spend more time in this town. We secured a favorable planting distance of the plants used to be so easy to look after, maintain and spread of disease is less than in intensive installation. The shrubs used are chosen to be in all seasons're currently maturing fruit. The area in the middle of a large pergolas provide shade, which may be organizing smaller events as well. The playground marsh area of ​​approximately 150 square meters in area equilibrated and gravel. 7 x 1 meter diameter concrete cake is the basis into which are poured into 7 pieces 100 x 50 mm I-beam, with four corner columns (4 x 5 m floor space of 2.75 meters high), the other part is 0.25 meters high out. These welded 50 x50 mm zártszelvényből is the foundation on which boat will be anchored to the floor. The exterior walls and interior trim work scenery. The 25-cm-inch height and two meters in length than those provided for more favorable slope to the disabled. The front wall is open four panel ruled that the evenings or holidays can be mounted. The above shown fűtakarás provide the final shape, which is formed such that the wire ropes stretching a double tree trunk, and the converted and the roof structure using the final form would show interesting perspective. Skating Rink This temperature range from -100 to + 80 ° C be used. The ice rink is an essential element of a 1.25 or 1 m in height backboard system, which provides easy track gate 2-4 up. The concrete surface must be such that the longitudinal axis in both directions from 1 to 1.5% slope has. Occasionally fit into each other OSB is used (this is the path not included). The detailed specifications of the tender documentation. Where the proceedings of the public notice or the technical specifications provided - including the printout is unpriced budget - around specific type of article that refers exclusively to the subject of the procurement in order to clarify Contracting equivalent to those adopted megajánlásokat. (310/2011. (XII.23.) Korm Section 26 (3))

Space for forming a number of experiences of the Dead ecotourism attraction Somes development related projects megvalósítása- construction works of Section 3 and 4 of the Treaty Change

Jót s Jól Egyesület | Published July 22, 2015
Winner
CÍVIS-BAU ÉPÍTŐIPARI, TERVEZŐ ÉS KIVITELEZŐ Kft.
cpvs
45212000, 45212211, 45212420, 45213340

Part 1: splashdown point (u Fülpösdaróc 29.30) approach to ensure the water level of 3.2 x 1.0 m size járóhíd. Adventure Tower Building (u Fülpösdaróc 27) Accordingly, a functionally simplistic, finished with wood and supplemented, tight staircase walls were reinforced blade design, with the closure of high-roofed bar, toronylezárást imitate, but original and unique. Satu Mini-Park (27 Fülpösdaróc u) the tables slightly tilted to easily read the inscription on them. Part 2: ditching one point station (Tunyogmatolcs 0209.hrsz) Water level in the approach of the 7.6 x 1.0 m step size, and the size of 1.8 x 1.0 m ensures járóhíd. Part 3 Touring Center, bream oven (Győrtelek) The furniture section serves as a stop on the trail that can be used in Gyor plot linked to local traditions and values ​​presented. The buildings around the square stone pavement cover made of white outer facade. Splashdown point (u Győrtelek 439.433) provides 3,2 x 1,0 m sized járóhíd. Part 4: Event Space (u Ököritófülpös 029.) The operation is planned 75 chairs in the project. Part 5: splashdown point second station (653 Tunyogmatolcs u) at the end of two 3.0 x 1.0 m size csapóhíd imitates the ferry ramp which can be moved sodronykötéllel, csörlődobos ship wheel located in the midline. The corridor on both sides of the stairs 10 to 10 m in length will be built step rézsűbiztosítás catering and Hiking Centre (Tunyogmatolcs) net floor area of ​​161.65 m2. Part 6 Jungle Fruit (Géberjén 04.10. U) of different ages and interests nice range of people find their occupation and thus spend more time in this town. We secured a favorable planting distance of the plants used to be so easy to look after, maintain and spread of disease is less than in intensive installation. The shrubs used are chosen to be in all seasons fruit're currently worth. The area in the middle of a large pergolas provide shade, which may be organizing smaller events as well. The playground marsh area of ​​approximately 150 square meters in area equilibrated and gravel. 7 x 1 meter diameter concrete cake is the basis into which are poured into 7 pieces 100 x 50 mm I-beam, with four corner columns (4 x 5 m floor space of 2.75 meters high), the other part is 0.25 meters high out. These welded 50 x50 mm zártszelvényből is the foundation on which boat will be anchored to the floor. The exterior walls and interior trim work scenery. The 25-cm-inch height and two meters in length than those provided for more favorable slope to the disabled. The front wall is open four panel ruled that the evenings or holidays can be mounted. The above shown fűtakarás provide the final shape which is formed by stretching a wire rope to the double-tree trunk, and the converted and the roof structure using the final form would show interesting perspective. Rinks Thus temperatures in the range -100 to + 80 ° C be used. The ice rink is an essential element of a 1.25 m high fence or one system that provides easy track gate 2-4 up. The concrete surface must be such that the longitudinal axis in both directions from 1 to 1.5% slope has. Occasionally fit into each other OSB is used (this is the path not included). The detailed specifications of the tender documentation. Where the proceedings of the public notice or the technical specifications provided - including the printout is unpriced budget - around specific type of article that refers exclusively to the subject of the procurement in order to clarify Contracting equivalent to those adopted megajánlásokat. (310/2011. (XII.23.) Korm Section 26 (3))
  • 1