Public tenders for furniture in Tata Hungary

Find all Furniture tenders in the world.
Finding business opportunities has never been easier.

Results for furniture. Make a new search!

1.számú Change Contract

Tata Város Önkormányzata | Published December 2, 2015
Winner
Tata PEWE Konzorcium
cpvs
45200000

Safe and urban regeneration function expansion KDOP - framework 3.1.1 / A-09-02f-2011-0001 within the framework of project implementation Tata Kossuth Square to terminate a contract of 4 pedestrian crossing will take place during the reconstruction. Kossuth tér related traffic facilities: building a jumper between the two courses of 26, 90 m. Road construction: the addition of K1 and K2-action parkolósor parallel roads built, 2.5 m width between the parking lot and sidewalks 1,5¬ * 1.5 m zöldsáv squares. The other reconstruction-related road works Parallel parking on the paved road in Komárom section of 19.0 m length of 2, 5 m in width. Surface water drainage: Precipitation sewer pipeline laying (mine constructions, ground works, additional road breakdowns and repair allegations included), V80 R 97m, V60 R 97m, NA500 KGPVC 95m, NA400 KGPVC 133mm, NA300 KGPVC 88m, NA200 KGPVC 35m registration: The construction works Before beginning készítni must be approved by the authority and the contractor engedélező traffic restriction plan for the duration of construction. The Kossuth square landscape and environment architectural revitalization of the following work concerns: the removal, installation, Water Preview statue and the pool and retaining wall demolition, new housing, space stairs, retaining walls, pool construction, exterior Mobilio (compartment furniture, bicycle, selective waste collection, woody vegetation selling mobile devices), touch-screen terminal for outdoor placement, kiépítéssel surveillance system. If the statue's restoration coincides with the period of construction, it must work with the specialist performing the restoration should not prevent restoration, along with the need to provide access to the contractor. The main volumes of the detailed design (architecture, hydraulic engineering) are as follows: The space inside landscape architecture works of the main characteristics data during the reconstruction - 3000 m2 of space and walkway cover natural stone cladding elements, borders, bordűrökkel - 200 m2 inkrusztatív nature (intended precious stone material , inlaid) pavement surface, - 3 m2 decorative, artistic construction needs, precious stone material cladding decorative elements (stone graphics), - the development of 2,300 m2 demanding architectonic public space green area - 280 m trimmed hedges, 84 reared high ornamental value, shapes Installing trimmed taxa related work - Construction of automatic irrigation systems for green areas based on the plans attached - Block Stone benches: The seat and front part of the square facing the limestone host structure (base) of reinforced concrete. Fields of reinforced concrete retaining walls 20 cm thick framed, the height of which varies but does not exceed 1.5 meters. Additional blocks of stone benches: the statue of Maria Immaculata along around a circle of radius 5.4 m, 3 sections 2.0 + 4.7 + 10.2 = 16.9 meters in total length. Stairs: A semi-circular staircase total length: + 15.4 + 16.3 + 14.4 17.3 + 18.2 + 19.2 + 20.1 = 120.9 meters. Water pool built on the central square on 3 sides flanking the curved and straight lines, this 4-fellépésű limestone block staircase is flanked by a total length of 26.4 m / pool, or a total of: additional landscaping stairs 52.8 meters in the area (3 locations) limestone blocks of stone stairs. Total length: 16.0 + 12.8 + 9.6 = 38.4 meters of water surface, fountain ("water attraction"): 25 m2 surface of water, about 1 meter high water curtain. Water Engine room: in-ground concrete pit, bounding main external dimensions 4,5x3,5x3,3 m and 1.35 m high water consumption hiding Expected opening: 3-4 m3 / d recycling water: 15 m3 / ha two basins together.

Information on the outcome - Safe and urban regeneration function expansion KDOP - within the framework of implementation of the framework 3.1.1 / A-09-02f-2011-0001 project contract for Tata Kossuth Square

Tata Város Önkormányzata | Published August 14, 2015
Winner
Tata PEWE Konzorcium
cpvs
45200000, 45232452, 45233262, 45233161, 45233251, 45233200, 45233221, 45112711

Safe and urban regeneration function expansion KDOP - framework 3.1.1 / A-09-02f-2011-0001 within the framework of project implementation Tata Kossuth Square to terminate a contract of 4 pedestrian crossing will take place during the reconstruction. Kossuth tér related traffic facilities: building a jumper between the two courses of 26, 90 m. Road construction: the addition of K1 and K2-action parkolósor parallel roads built, 2.5 m width between the parking lot and sidewalks 1,5¬ * 1.5 m zöldsáv squares. The other reconstruction-related road works Parallel parking on the paved road in Komárom section of 19.0 m length of 2, 5 m in width. Surface water drainage: Precipitation sewage routing (mine building with earth works, additional road breakdowns and repair allegations included), V80 R 97m, V60 R 97m, NA500 KGPVC 95m, NA400 KGPVC 133mm, NA300 KGPVC 88m, NA200 KGPVC 35m registration: The construction works Before starting készítni be approved by the authority and the contractor engedélező traffic restriction plan for the duration of construction. The Kossuth square landscape and environment architectural revitalization of the following work concerns: the removal, installation, Water Preview statue and pool and retaining wall demolition, new housing, space stairs, retaining walls, pool construction, exterior Mobilio (compartment furniture, bicycle, selective waste collection, woody vegetation selling mobile devices), touch-screen terminal for outdoor placement, kiépítéssel surveillance system. If the statue's restoration coincides with the period of construction, to be a technician carrying out restoration work on the restoration should not prevent the need to ensure access together with the contractor. The main volumes of the detailed design (architecture, hydraulic engineering) are as follows: The space inside landscape architecture works of the main characteristics data during the reconstruction - 3000 m2 of space and walkway cover natural stone cladding elements, borders, bordűrökkel - 200 m2 inkrusztatív nature (intended precious stone material , inlaid) pavement surface, - 3 m2 decorative, artistic construction needs, precious stone material cladding decorative elements (stone graphics), - the development of 2,300 m2 demanding architectonic public space green area - 280 m trimmed hedges, 84 reared high ornamental value, shapes Installing trimmed taxa related work - Construction of automatic irrigation systems for green areas based on the plans attached - Block Stone benches: The seat and front part of the square facing the limestone host structure (base) of reinforced concrete. A 20 cm thick reinforced concrete retaining walls fields framed, the height of which varies but does not exceed 1.5 meters. Additional blocks of stone benches: the statue of Maria Immaculata along around a circle of radius 5.4 m, 3 sections 2.0 + 4.7 + 10.2 = 16.9 meters in total length. Stairs: A semi-circular staircase all length: 14.4 + 15.4 + 16.3 + 17.3 + 18.2 + 19.2 + 20.1 = 120.9 meters. Water pool built on the central square on 3 sides flanking the curved and straight lines, this 4-fellépésű limestone block staircase is flanked by a total length of 26.4 m / pool, or a total of: additional landscaping stairs 52.8 meters in the area (3 locations) limestone blocks of stone stairs. Total length: 16.0 + 12.8 + 9.6 = 38.4 meters of water surface, fountain ("water attraction"): 25 m2 surface of water, about 1 meter high water curtain. Water Engine room: in-ground concrete pit, bounding main external dimensions 4,5x3,5x3,3 m and 1.35 m high water consumption hiding Expected opening: 3-4 m3 / d recycling water: 15 m3 / ha two basins together.
  • 1