Public tenders for furniture in Sopron Hungary

Find all Furniture tenders in the world.
Finding business opportunities has never been easier.

Results for furniture. Make a new search!

Delivery of various furniture furnish the main building of the Hungarian Academy CSFK

MTA Csillagászati és Földtudományi Kutatóközpont | Published June 10, 2015  -  Deadline June 30, 2015
cpvs
39100000, 39113000

Supply contract / delivery of various furniture MTA CSFK main house furnish

Furniture (incl. office furniture), furnishings, domestic appliances (excl. lighting) and cleaning products

Soproni Erzsébet Oktató Kórház és Rehabilitációs Intézet | Published August 13, 2015
cpvs
39000000, 39700000, 39141000, 39220000, 39714110, 45421151

Bútorok (beleértve irodai bútorok), lakberendezési cikkek, háztartási berendezések (kivéve világítás) és tisztítótermékek

Delivery of various furniture furnish the MTA CSFK main building - information

MTA Csillagászati és Földtudományi Kutatóközpont | Published August 12, 2015
Winner
Balaton Bútor Kft.
cpvs
39100000, 39113000

Delivery of various furniture the MTA CSFK main building furnish the following quantities: Ma-1 Desktop 9 units Ma-2 Desktop 63 pieces of minus 5% today-3 Desktop 1 Ko-1 Container 63 pieces of minus 5% Ko-2 Lockers 6 minus 100% No-1 Folding Panel page 1 Sz-2m Cabinet - open high shelf 92 pieces of minus 16% W - 3c printer cabinet with 11 C-4 Cabinet - lockable 9 pieces W-5 Open shelving 1 No. 6 Low-door cabinet 1 W-7 medium high open shelf 1 W-8 Mailer cabinet 2 x Ta-1 Meeting table 2 Ta 2 Meeting table 9 pieces of minus 30% Eb-1 Kitchen 1 Championship 2 Kitchen 2 VMA-1 Executive worktable 1 IR-1 Executive wardrobe 5 IR-4 Executive cabinet 8 IR-3 Driver's wardrobe 1 minus 100% IR 2 Executive closet 2 ECF-3 Leadership Conference table 2 Kie-1 paper basket 46 pieces Kie -2 Hanger 44 pcs Kie-3 Table lamp 71 pieces of minus 5% 4-Kie Kie-3 Pedal szeemeteskosár 5 whiteboard 18 pieces of 100% minus-6 Kie Kie dishwasher 1-7 Information board 1 EA-1 dining folding Panel 1 Pa-1 Coffee table 2 minus 50% Ps-1 small armchair with 4 minus 100% Ps-2 High chair 6 minus 50% S-1 Office chair 73 pieces of minus 5% S-2 Meeting's 116 db minus And 14%, 1 dining chairs 100 minus 12%

Furniture (incl. office furniture), furnishings, domestic appliances (excl. lighting) and cleaning products

Soproni Erzsébet Oktató Kórház és Rehabilitációs Intézet | Published June 24, 2015  -  Deadline August 3, 2015
cpvs
39000000, 39700000, 39141000, 39220000, 39714110, 45421151

Kitchen equipment Purchase of Technology in the Sopron Elizabeth Teaching Hospital and the Rehabilitation Institute of SIOP 2.2.8 / 14 - within the framework of the implementation of infrastructure development project, the tender notice.

Information treaty amendment 1 .; Within the framework of a contract "in Sopron Elizabethan Gardens recovery tasks" on EEOP 3.1.2. / 2F / 09-11-2013-0045 identification number of applications works, implementation of construction of objects

Sopron Megyei Jogú Város Önkormányzata | Published November 13, 2015
Winner
Everling Városépítő Építőipari, Kereskedelmi és Szolgáltató Kft.
cpvs
45112711, 45211360, 45210000, 45223800, 45240000, 45255110, 45212320

Within the framework of a contract EEOP 3.1.2 / 2F / 09-11-2013-0045 identification number "of Sopron Elizabethan Gardens recovery tasks" on tender works, construction implementation object of Key specifications. 60 pieces of patient / dangerous / construction an area of ​​tree cutting 68 pieces of hardwood trees planted 770 pieces of evergreen planting of 9,602 pieces shrub planting of 32,704 pieces of perennial planting nine pieces dézsás plant placement design 430 plant care interventions 19,500 m2 lawn establishment Irrigation Music Pavilion reconstruction of Cascade restore Norton type of well construction Utilities construction Sörház terrace reconstruction of 7098 m2 scattered paved walking path renovation of approximately 460 m Fence renovation of approximately 530 m3 hlladékelszállítása purchase of 144 pieces of furniture park contains the details of the contract documents.

Information on the second contract amendment;. Within a contract "in Sopron Elizabethan Gardens recovery tasks" in the framework of EEOP 3.1.2 / 2F / 09-11-2013-0045 identification number of applications works, implementation of construction of objects

Sopron Megyei Jogú Város Önkormányzata | Published November 13, 2015
Winner
Everling Városépítő Építőipari, Kereskedelmi és Szolgáltató Kft.
cpvs
45112711, 45211360, 45210000, 45223800, 45240000, 45255110, 45212320

Within the framework of a contract EEOP 3.1.2 / 2F / 09-11-2013-0045 identification number "of Sopron Elizabethan Gardens recovery tasks" on tender works, construction implementation object of Key specifications. 60 pieces of patient / dangerous / construction an area of ​​tree cutting 68 pieces of hardwood trees planted 770 pieces of evergreen planting of 9,602 pieces shrub planting of 32,704 pieces of perennial planting nine pieces dézsás plant placement design 430 plant care interventions 19,500 m2 lawn establishment Irrigation Music Pavilion reconstruction of Cascade restore Norton type of well construction Utilities construction Sörház terrace reconstruction of 7098 m2 scattered paved walking path renovation of approximately 460 m Fence renovation of approximately 530 m3 hlladékelszállítása purchase of 144 pieces of furniture park contains the details of the contract documents.

Reference No. 2. contract amendment; The agency contract "NYDOP-3.1.1 / B1-13's identification number-2013-0001," The Castle District lockers renewal - Phase I, "the technical performance of supervisory duties the subject of a project called"

Sopron Megyei Jogú Város Önkormányzata | Published July 31, 2015
Winner
CÉH Tervező, Beruházó és Fejlesztő Zrt.
cpvs
71500000, 71356100

Procurement subject: "Contract of the" NYDOP-3.1.1 / B1-13's identification number-2013-0001, "The Castle District lockers renewal - Phase I," the technical performance of supervisory duties the subject of a project called "Public procurement quantity: The NYDOP- area of ​​concern in the context of a project called about 20,000 m2 to 12,000 m2 for the construction of paving and landscape design, lighting a total renovation - 3.1.1 / B1-13-2013-0001-s identification number, "A Phase I safety deposit box Várkerület renew" New street furniture placement, design and construction of reinforced concrete 80 m2 pavilion, as well as supplying traffic engineering, traffic management functions including water construction works technical control tasks game. Define the task: Regulation § 16. According to.

Information on the outcome of the procedure; "The relief work in Sopron Elizabethan Gardens 2014-2015" works, design implementation, process re-open

Sopron Megyei Jogú Város Önkormányzata | Published April 29, 2015
Winner
Everling Városépítő Építőipari, Kereskedelmi és Szolgáltató Kft.
cpvs
45112711, 45211360, 45210000, 45223800, 45240000, 45255110, 45212320

Procurement subject: 'a contract' 'within the framework was EEOP 3.1.2 / 2F / 09-11-2013-0045 identification number of applications for works, the subject of design implementation. "The Sopron Elizabethan garden restoration tasks of procurement quantity: Technical highlights 60 pieces Patient / dangerous / construction site timber cut 68 pieces of hardwood trees planted 770 pieces of evergreen planting of 9602 pieces shrub planting of 32,704 pieces of perennial planting 9 piece dézsás plant placement design 430 plant care interventions 19500 m2 lawn establishment of irrigation systems bandstand reconstruction of Cascade restore Norton types of wells Public building construction reconstruction Sörház 7098 m2 terrace paved walking path scattered about renovating renovation of approximately 460 meters of fences purchase of 144 530 m3 hlladékelszállítása park furniture detailed in Tender Documentation.

Contract award notice - Purchase Kitchen Equipment Technology under the SIOP-2.2.6-12 / 1B from 2013 to 0008 ID No. "Complex development of the Sopron Elizabeth Hospital and the Rehabilitation Institute of Learning" project

Soproni Erzsébet Oktató Kórház és Rehabilitációs Intézet | Published October 16, 2015
Winner
Euro-Expert Team Kft.
cpvs
39000000, 39220000

Kitchen acquisition of production equipment under the SIOP-2.2.6-12 / ID No. 1B-2013-0008 "Complex development of the Sopron Elizabeth Hospital and the Rehabilitation Institute of Learning" project, as follows: 1 stainless cold-automatic slicer Expected parameters: Körkésátmérő: up to 250 mm. Size: 700 x 680 x 700 mm Power: 0,18 kW Voltage: 230W the specified size and power +/- 15% deviation is permissible. 1 Stainless steel Kutter Expected parameter to be suitable for universal use, meats, vegetables, etc. shredding. Size: 470 x 330 x 400 mm Capacity: 9.4 liters. Power: 0,35 kW "Voltage: 23V The specified size, tonnage and power rating of +/- 15% deviation is permissible 1pc stainless steel foil wrapping machine parameters expected. Anodized aluminum rollers and rods, adjustable temperature control, automatic film tension heating surface: 300x175 mm Maximum sheet width: 500 mm Net Weight: 15 kg Voltage: 230V Power: 0,45 kW "The specified dimensions and performance of +/- 15% deviation is permissible. 3 1400L high-capacity kitchen refrigerator Expected parameters: Temperature range: 0 / + 10 ° C "Size: 1500 x 2025 x 820 mm Voltage: 230V Power: 0,51 kW" The specified dimensions and performance of +/- 15% deviation is permissible . 3 large stainless steel kitchen with electric stove Expected parameters: 4 square hobs, cookers per sheet size: 300x300mm, power: 3,5kW, open ducts, height-adjustable legs. Dimensions: 800 x 900 x 900 mm Voltage: 400V 3NPE Total power: 14 kW The specified dimensions and performance +/- 10% deviation is permissible. 1 piece of stainless steel or non-corrosive metal meat grinder Expected hygienic parameters: Accessories: stainless steel tray and stainless steel receiving vessel. Power: 140 to 200 kg / h Voltage: 230 V, 400 V 1 Universal kitchen machine with accessories Expected parameters: Auxiliary Equipment: stainless finish húsörlő, passzírozó, slicing, dicing, grating auxiliary machinery (5 discs), beaters, dough hooks, blender ( 3 head, üstkapacitás 16 liters), fűszerörlő, mákörlő and knife sharpening machine, stainless steel rostlazító auxiliary machinery. Voltage: 230/400 VA specified hőfoktartománytól +/- 10% deviation is permissible. 4 3 floors, a built-in static oven Required parameters: Double panorama glass security door, oven internal illumination. Dimensions: 800x900x1460 mm Voltage: 400V 1pc electric fryer, 2 sütőkosárral Expected parameters: Stainless steel, control lamp, safety thermostat, thermal cut, oil drain valve, oil temperature control, Oil tank volume: 2x15 liters Oven Rack size 250x280x120m fryers because: 700x775x850 Voltage: 400V Power: 27kW The specified dimensions and performance +/- 10% deviation allowed 2 electric convection oven Required parameters: a built-in stand design. Capacity: 5 x 2/3 GN. Dimensions: 610x620x660 Voltage: 230 V Power: 3.2 kW the specified dimensions and performance +/- 10% deviation is permissible Grade 3 Expected tray trolley Closed alloy design parameters of shipping containers, with 2 270 ° opening hinged doors, which are secured in the open position magnet, two fixed and two lockable swivel wheels 200 mm diameter. Ergonomic push handle, the car round bumper frame has a side of the castor wheels, tray capacity is 33 (3x11) pieces, three columns arranged in Sines export "100 Compact tray set of parameters expected EURONORM size (530x370 mm) Insulated Tray Set (lower and upper parts .), double-skinned, PU foam insulated Accessories: - porcelain adagtál 0.9 l + cover - insulated plastic tureen - 0.34 l + cover - kompótos Bowl 0,2 l - patient card holder trays and lid are provided with circumferential grooves, so do not stacked on each other will slip away. "rm to the invitation. The term steel AISI 304/4301 DIN1 steel composition thereof. Contractor is responsible to transport products to the site, installation, adjustment, installation, test operation and the use of conducting training. The term provided for in § 26 paragraph (6) "or equivalent" for any reason at that location was not indicated. CPV code: 39000000-2 Furniture (incl office furniture), s residence

Road construction works

Sopron Megyei Jogú Város Önkormányzata | Published October 10, 2017  -  Deadline November 6, 2017
cpvs
45233120, 45111290, 77300000, 34928400, 77314100, 45232120, 45232410, 45262300, 45262310, 45110000, 45315300, 45233228, 45233220

Completion of the construction project of the project called "Kisvárkerület and Várkerület" in Sopron.

The 1st District of the Várkerület was completed, and the reconstruction of the remaining districts of the District District will be completed, touching the area between Kisvárkerület and Ötvös street - Széchenyi tér.

The contracting authority determines the magnitude of the tasks as follows:

Main job:

Public Space Architecture.

Green surfaces.

Planting 2 234 pcs.

Grassland 382 m2.

Delivery of land 350 m3.

Installation of street furniture.

Installation of street furniture and wooden gratings 130 pieces.

Faveremrácsos resin filling 5-7 cm vtg 84 m2.

1.3. natural stone and / or pavement construction in pedestrian (3 665 m2) and mixed-use (service) areas (1,387 m2), transport areas (400 m2), parking (730 m2), grassland (400 m2).

Line drainage.

Preparation of drainage ducts with prefabricated elements, with fittings, shaft 53 fm.

Placement of drainage pipes with earthworks, with gravel filling, with 6 shafts 232 fm.

2. Creation of irrigation system with 1 400 fm pressure-compensated drip pipe laying.

Surface rainwater - drainage, sewage and water connections, sewage, network, demolition and construction.

Drilling and demolition of working boats with two-sided drilling 500 m2.

The pavement of concrete, asphalt pavement is demolished 108 m2.

Ground clearance of working hours with transport 150 m3.

Preparation of soil improvement layer with compression 108 m3.

Ø150-200 mm BUILDING of a KÖA coated tubing with fittings 133 fm.

Ø160mm PP SN10 pipe construction with fittings 36 fm.

Ø 32-40 mm Construction of KPE pipe with fittings 13 fm.

Construction of a water canal with complete fittings 22 pcs.

Public lighting and power grid works (0,4kV public lighting ground cable network (construction)).

5. Road construction, traffic engineering, traffic management (6,464 m2).

5.1 Road Construction in the Quarry (Demolition, Construction Works).

Asphalt paving, border demolition with transport 527 m3.

Concrete pavement, covering, edges, pavement concrete demolition with delivery 3 448 m3.

Preparation of frost protection layer with compression 854 m3.

Creating a Ckt base is 1 022 m3.

5.2 Traffic Engineering (demolition, construction works).

Breakdown of road signs, signal lanterns, construction of 161 pcs.

Creating signs of 232 m2.

Cable protection pipe 960 m.

Equipment programming 4 pcs.

Waterworks Reconstruction.

Sewage and rainfall pipes, construction of pipelines with fittings, mines construction, earthwork (DN200, DN250, DN300 Dissolve 650.7 fm; DN150 Wastewater, drainage and precipitation connections total 50, 367.8 m).

Construction of 416 m drinking water piping and connections with earthwork (416 m span rail, 23 KPE pipe joints) built with ductile cast iron piping system (BLUTOP type or equivalent).

Retaining wall.

Existing stone and reinforced concrete (vb.). the retaining wall and its bases are demolished 47 m3.

Vb support wall 15 - 50 cm vg C30 min. concrete with base 87 m3.

Wall covering of 2 cm vtg with anti-freezing sludge hard-limestone tiles 17 m2.

Further details on the above amounts are set out in the technical specification forming part of the procurement documents.

Depending on the negotiation, the Bidder may deviate from the specified parameters.

The contracting authority is 321/2015. (X.30.) Korm. Ordinance, Section 46 (3), accepts an equivalent product.

The contracting authority draws attention to the fact that, in the case of offering an equivalent, equivalence must be verified by the tenderer in his tender.

Road construction works

Sopron Megyei Jogú Város Önkormányzata | Published November 22, 2017  -  Deadline December 27, 2017
cpvs
45233120, 45111290, 77300000, 34928400, 77314100, 45232120, 45232410, 45262300, 45262310, 45110000, 45315300, 45233228, 45233220

Completion of the construction project of the project called "Kisvárkerület and Várkerület" in Sopron.

The 1st District of the Várkerület was completed, and the reconstruction of the remaining districts of the District District will be completed, touching the area between Kisvárkerület and Ötvös street - Széchenyi tér.

The contracting authority determines the magnitude of the tasks as follows:

Main job:

Public Space Architecture

green surfaces

Planting 2 234 pcs

Grassland 382 m2

Delivery of land 350 m3

Installation of street furniture

Installation of street furniture and wooden gratings 130 pieces

Faver grilles resin filling 5-7 cm vtg 84 m2

1.3. (400 m2), parking lot (730 m2), masonry (400 m2), natural stone and / or pavement construction in pedestrian (3 665 m2) and mixed use

Line drainage

Preparation of drainage ducts with prefabricated elements, with fittings, shaft 53 fm

laying drainage pipe with earthwork, with gravel filling, with 6 shafts 232 fm

2. Creation of irrigation system with 1 400 fm pressure-compensated drip pipe laying

Surface rainwater - drainage, sewage and water connections, sewage, network, demolition and construction

Drilling and demolition of working boats with two-sided drilling 500 m2

The pavement of concrete, asphalt pavement is demolished 108 m2

Ground clearance of working hours with transport 150 m3

Preparation of soil improvement layer with compression 108 m3

Ø150-200 mm BUILDING of a KÖA coated tubing with fittings 133 fm

Ø160mm PP SN10 pipe construction with fittings 36 fm

Ø 32-40 mm Construction of KPE pipe with fittings 13 fm

Construction of a water canal with complete fittings 22 pcs

Public lighting and power grid works (0,4 kV public lighting ground cable network (construction))

5. Road construction, traffic engineering, traffic management (6,464 m2)

5.1 Road Construction at the Quarry (Demolition, Construction Works)

Asphalt paving, border demolition with transport 527 m3

Concrete pavement, covering, edges, pavement concrete demolition with delivery 3 448 m3

Preparation of frost protection layer with compression 854 m3

Creating a Ckt base is 1 022 m3

5.2 Traffic Engineering (Demolition, Construction Works)

Breakdown of road signs, signal lanterns, construction of 161 pcs

Creating signs of 232 m2

Cable protection pipe 960 m

Equipment programming 4 pcs

Waterworks Reconstruction

(DN200, DN250, DN300, DN250, DN350, DN150, DN150, DN150, Wastewater, Eaves and Precipitation Connections total 50 pieces, 367.8 m), Sewage and Soil Canal Grounds,

Construction of 416 m drinking water piping and connections with earthwork (416 m span cable, 23 KPE pipe connections) with ductile cast iron piping system (BLUTOP type or equivalent)

retaining wall

Existing stone and reinforced concrete (vb.). the retaining wall and its bases are demolished 47 m3

Vb support wall 15 - 50 cm vg C30 min. concrete with base 87 m3

Wall covering of 2 cm vtg with anti-freezing sludge hard-limestone tiles 17 m2

Further details on the above amounts are set out in the technical specification forming part of the procurement documents.

Depending on the negotiation, the Bidder may deviate from the specified parameters.

The contracting authority is 321/2015. (X.30.) Korm. Ordinance, Section 46 (3), accepts an equivalent product.

The contracting authority draws attention to the fact that, in the case of offering an equivalent, equivalence must be verified by the tenderer in his tender.

Road construction works

Sopron Megyei Jogú Város Önkormányzata | Published November 22, 2017
cpvs
45233120, 45111290, 77300000, 34928400, 45232120, 45232410, 45262300, 45262310, 45110000, 45315300, 45233228, 45233220

Completion of the construction project of the project called "Kisvárkerület and Várkerület" in Sopron.

The 1st District of the Várkerület was completed, and the reconstruction of the remaining districts of the District District will be completed, touching the area between Kisvárkerület and Ötvös street - Széchenyi tér.

The contracting authority determines the magnitude of the tasks as follows:

Main job:

Public Space Architecture.

Green surfaces.

Planting 2 234 pcs.

Grassland 382 m2.

Delivery of land 350 m3.

Installation of street furniture.

Installation of street furniture and wooden gratings 130 pieces.

Faveremrácsos resin filling 5-7 cm vtg 84 m2.

1.3. natural stone and / or pavement construction in pedestrian (3 665 m2) and mixed-use (service) areas (1,387 m2), transport areas (400 m2), parking (730 m2), grassland (400 m2).

Line drainage.

Preparation of drainage ducts with prefabricated elements, with fittings, shaft 53 fm.

laying drainage pipe with earthwork, with gravel filling, with 6 shafts 232 fm.

2. Creation of irrigation system with 1 400 fm pressure-compensated drip pipe laying.

Surface rainwater - drainage, sewage and water connections, sewage, network, demolition and construction.

Drilling and demolition of working boats with two-sided drilling 500 m2.

The pavement of concrete, asphalt pavement is demolished 108 m2.

Ground clearance of working hours with transport 150 m3.

Preparation of soil improvement layer with compression 108 m3.

Ø150-200 mm BUILDING of a KÖA coated tubing with fittings 133 fm.

Ø160mm PP SN10 pipe construction with fittings 36 fm.

Ø 32-40 mm Construction of KPE pipe with fittings 13 fm.

Construction of a water canal with complete fittings 22 pcs.

Public lighting and power grid works (0,4kV public lighting ground cable network (construction)).

5. Road construction, traffic engineering, traffic management (6,464 m2).

5.1 Road Construction in the Quarry (Demolition, Construction Works).

Asphalt paving, border demolition with transport 527 m3.

Concrete pavement, covering, edges, pavement concrete demolition with delivery 3 448 m3.

Preparation of frost protection layer with compression 854 m3.

Creating a Ckt base is 1 022 m3.

5.2 Traffic Engineering (demolition, construction works).

Breakdown of road signs, signal lanterns, construction of 161 pcs.

Creating signs of 232 m2.

Cable protection pipe 960 m.

Equipment programming 4 pcs.

Waterworks Reconstruction.

Sewage and rainfall pipelines, construction of pipelines with fittings, mines construction, earthwork (DN200, DN250, DN300 Dissolve 650.7 fm; DN150 Wastewater, erosion and rainfall total 50, 367.8 m).

Construction of 416 m drinking water piping and connections with earthwork (416 m span rail, 23 KPE pipe joints) built with ductile cast iron piping system (BLUTOP type or equivalent).

Retaining wall.

Existing stone and reinforced concrete (vb.). the retaining wall and its bases are demolished 47 m3.

Vb support wall 15 - 50 cm vg C30 min. concrete with base 87 m3.

Wall covering of 2 cm vtg with anti-freezing sludge hard-limestone tiles 17 m2.

Further details on the above amounts are set out in the technical specification forming part of the procurement documents.

Depending on the negotiation, the Contracting Authority may deviate from the specified parameters.

The contracting authority is 321/2015. (X.30.) Korm. Ordinance, Section 46 (3), accepts an equivalent product.

The contracting authority draws attention to the fact that, in the case of offering an equivalent, equivalence must be verified by the tenderer in his tender.

  • 1