Call +44 800 9755 164

Public tenders for furniture in Hungary

Find all Furniture tenders in the world.
Finding business opportunities has never been easier.

Results for furniture. Make a new search!
FurnitureHungary

Furniture

Országos Bírósági Hivatal | Published January 18, 2017  -  Deadline February 13, 2017

Interior design, furniture and curtains obtain antique furniture restoration of Godollo Godollo District Court and the district attorney's office in the framework of the purchase contract in the tender and procurement documents indicated below.

Furniture

Országos Bírósági Hivatal | Published January 19, 2017  -  Deadline February 9, 2017

Building on joint use of interior fitting to the image of various furniture and other equipment to obtain the Eger County Court and the County Prosecutor, historical (st or antique) furniture restoration, and carrying out related tasks.

Furniture

Budavári Ingatlanfejlesztő és Üzemeltető Nonprofit Kft. | Published January 18, 2017  -  Deadline February 22, 2017

Contract Definition: Entrepreneurship elements movable joint sales agreement.

object of the contract: "need to Buda Castle Palace, the former St. Stephen's Hall reconstruction of authentic custom-made wooden floors, manufacturing wall coverings, ceiling, furniture components, as well as the incorporation of these elements hall."

required under the protection of the historic Buda Castle St. Stephen's former room of the reconstruction of authentic custom-made wood:

- Preparing floor plans of components manufactured, manufacturing,

- Wall cladding elements make plans for preparing, producing,

- Preparation of plans ceiling components manufactured, manufacturing,

- Preparation of plans and windows manufactured components, manufacturing,

- Preparation of furniture components product design and manufacturing.

Furthermore, the incorporation of these elements in the room in the procurement documents (hereinafter referred to as "KD") indicated below.

The process involved in procurement accredited consultant responsible for the dr. Szterényi Alexander (00159).

Furniture

Országos Bírósági Hivatal | Published January 3, 2017  -  Deadline February 13, 2017

Interior design, furniture and curtains obtain antique furniture restoration of Godollo Godollo District Court and the district attorney's office in the framework of the purchase contract in the tender and procurement documents indicated below.

Purchase Mobilio in Godollo Godollo District Court and the district attorney's office building renovation:

1. Seating (roller swivel chairs, rolling chairs with armrests work, chairs, armchairs, sofa), a total of 335 pieces.

Tables, a total of 276 pieces.

Cabinets, a total of 242 pieces.

4. Accessories (coffee table, coat hanger, dining counter and desks, desk, bench and -szekrény), a total of 32 pieces.

Benches, a total of 77 pieces.

Filing, rolling filing system, a total of 32 pieces.

Custom-made furniture and wall coverings:

Kitchenettes, a total of 4 pieces.

Wall profile, a total of 298 pieces.

Wall hanger, a total of 10 pieces.

Wall cladding, a total of 10 pieces.

Boardroom tables, a total of 55 pieces.

Boardroom lectern, a total of 10 pieces.

Court Strips, a total of 468 pieces.

Fire Showcases a total of seven pieces.

Coat of Arms (tempered glass painted on pontmegfogásos method, a total of 3 pieces.

Függönyözés:

Double-row curtain rods and accessories, a total of 92 pieces.

Transparent Curtains, total: 362.24 m².

Curtains, total: 362.24 m².

Information System:

Information boards and related accessories, a total of 118 units, quantitative deviation of +/- 15% is possible.

Briefing floor plan showing signs of 2 pcs.

Tactile Map 1 total.

Contractor is responsible for the particular product fulfillment site of delivery, set up and on-site installation.

A detailed and accurate quantitative data and technical requirements of the procurement documents have been identified.

The upholstery replaced, the new draft selection of the investor and the designer's approval is needed (in a planned).

Quantities:

- Cabinet: 1,

- Desk: 1,

- Conference table: 1,

- Armchair: 1,

- Sofa set (sofa: 1, arm-chair: 2 pieces, small table: 1)

- Chair: 1.

The contractor responsible for the return of the product removal, refurbishment and completion on site.

A detailed and accurate quantitative data and technical requirements of the procurement documents have been identified.

Purchase a variety of furniture and other equipment

Országos Bírósági Hivatal | Published December 21, 2016
Purchase a variety of furniture and other equipment

"Győr, Árpád út offices building No. 32 built-in furniture"

Győr-Moson-Sopron Megyei Kormányhivatal | Published December 30, 2016  -  Deadline January 23, 2017
"Győr, Árpád út offices building No. 32 built-in furniture"

The Gödöllői District Court and the Prosecutor's Office is located in the district Gödöllői complete reconstruction and expansion works of interior design implementation, and specific types of furniture purchases

Országos Bírósági Hivatal | Published January 4, 2017  -  Deadline February 13, 2017
The Gödöllői District Court and the Prosecutor's Office is located in the district Gödöllői complete reconstruction and expansion works of interior design implementation, and specific types of furniture purchases

Office machinery, equipment and supplies except computers, printers and furniture

Budapest Környéki Törvényszék | Published December 22, 2016  -  Deadline January 31, 2017

Rental of multifunction devices, full operation and maintenance of the Tribunal in Budapest region and operating in the jurisdiction of the district courts for.

The hiring around Budapest Court and operating in the jurisdiction of the district courts to the original factory packaging, new multifunction devices, full operation and maintenance of the following amounts:

- (For A4 paper size: 45 pages / minute copy / print speed), 93 pieces of black-and-white A3 MFPs,

- (For A4 paper size: 75 pages / minute copy / print speed) 1 black-and-white A4 A3 MFP,

- (For A4 paper size: 30 pages / minute copy / print speed) A3 color MFP 2.

The amount granted from the contracting authority during the contract period may vary from + 30%.

The contractor is responsible for the leased multifunction devices in locations specified by the contracting authority (floor, office), transportation, installation, to management education to persons specified by the contracting authority site as one time, to the full operation and maintenance of the leased MFPs contract during the entire period.

As part of the complete operation and maintenance services, according to the contractor as part of the terms and conditions specified in the contract tender documentation:

- Provides a dye for printing and copying is necessary for the contracting authority,

- Ensure the wearing parts needed for multi-function devices,

- Carry out regular maintenance work on time according to the manufacturer's specifications multifunction devices,

- In case of failure of the multifunction devices: Budapest site within a maximum of eight hours of work, Pest County locations within a maximum of 10 working hours of the start-time error correction multifunction devices,

- If the defect can not be repaired on the spot, performing the multi-function device movement, delivery, and at the same time for the duration of the repair replacement mu ...

Sewage, refuse, cleaning and environmental services

Magyar Közút Nonprofit Zrt. | Published January 14, 2017  -  Deadline February 21, 2017

framework operated by the Hungarian Roads Management Company. road network in each seating location of sites or individual sites of waste water collection, removal for disposal of entrepreneurial framework contract.

Operating Area: Komarom M1 APM.

Place name:

Grébics the right furniture; km section: 72+ 500; Sewage tank: 2 x 10 m³.

The amount of acquisition: 1500 m³ / year.

However, if Contracting Authority finds that the septic tanks were filled, it shall notify the contractor to whom within 4 hours emptying should start.

In the case of wastewater disposal is based on the accounts of the toilet building water meter water meter.

The Offeror is responsible for the writing of the data supplied, transferred for treatment wastewater / sludge quantity (m3) per rest and treatment broken down by January 31 of the year following the reference year of engineering concerned.

The remaining 30% with regard to the contractor acknowledges that in the absence of the amount of exhaustion towards the Contracting Authority may not claim any.

The total volume of detailed technical requirements included in the technical specifications as part of the procurement documents.

Operating area: M3 Gödöllői APM.

Place name:

Ring bilateral rest; km section: 18 + 000; sewage pool: 2 x 8 m³.

Babat right hand rest; km section 32 + 000; Sewage tank: 1 x 10 m³.

Galga bilateral rest; km section 43 + 600; Sewage tank: 2 x 10 m³.

Hort bilateral rest; km section 60 + 500; Sewage tank: 2 x 10 m³.

Ecséd the right furniture; km section 66 + 300; Sewage tank: 1 x 10 m³.

The amount of acquisition: 5500 m³ / year.

However, if Contracting Authority finds that the septic tanks were filled, it shall notify the contractor to whom within 4 hours emptying should start.

In the case of wastewater disposal is based on the accounts of the toilet building water meter water meter.

The Offeror is responsible for the writing of the data supplied, transferred for treatment wastewater / sludge quantity (m3) per rest and treatment broken down by January 31 of the year following the reference year of engineering concerned.

The remaining 30% with regard to the contractor acknowledges that in the absence of the amount of exhaustion towards the Contracting Authority may not claim any

The total volume of detailed technical requirements included in the technical specifications as part of the procurement documents.

Operating area: Kali APM.

Location Name: Mezőszemere bilateral rest; km section: 122+ 200; Sewage tank: 2 x 15 m³.

The amount of acquisition: 1500 m³ / year.

However, if Contracting Authority finds that the septic tanks were filled, it shall notify the contractor to whom within 4 hours emptying should start.

In the case of wastewater disposal is based on the accounts of the toilet building water meter water meter.

The Offeror is responsible for the writing of the data supplied, transferred for treatment wastewater / sludge quantity (m3) per rest and treatment broken down by January 31 of the year following the reference year of engineering concerned.

The remaining 30% with regard to the contractor acknowledges that in the absence of the amount of exhaustion towards the Contracting Authority may not claim any

The total volume of detailed technical requirements included in the technical specifications as part of the procurement documents.

Operating area: APM Emődi

Place name:

Igrici bilateral rest; km section 153 + 500; Sewage tank: 2 x 15 m³.

Bilateral Civil furniture; km section 171 + 250; Sewage tank: 2 x 15 m³.

The amount of acquisition: 3000 m³ / year.

However, if Contracting Authority finds that the septic tanks were filled, it shall notify the contractor to whom within 4 hours emptying should start.

In the case of wastewater disposal is based on the accounts of the toilet building water meter water meter.

The Offeror is responsible for the writing of the data supplied, transferred for treatment wastewater / sludge quantity (m3) per rest and treatment broken down by January 31 of the year following the reference year of engineering concerned.

The remaining 30% with regard to the contractor acknowledges that in the absence of the amount of exhaustion towards the Contracting Authority may not claim any

The total volume of detailed technical requirements included in the technical specifications as part of the procurement documents.

Operating area: M3 Hajdúnánási APM.

Location Name: Hajdúnánási engineering plant; km section 203 + 000; Sewage tank: 2 x 20 m³

The purchase volume of 600 m³ / year.

However, if Contracting Authority finds that the septic tanks were full, that the contractor

Engineering design services

NIF Zrt. | Published December 29, 2016  -  Deadline February 2, 2017

The M34 motorway section between Vásárosnamény preparing Záhony-licensing plan, obtaining a valid building permissions, and the preparation of an export plan (A003.16).

to be performed within the framework of the business (planning) contract tasks - among other things - to cover:

The approximately 39.3-km-long M34 motorway M3 - No 41. The main road forking node and the No. 4. 2x2 lane from the main road Záhony regional connections, physical (guard rail and / or reinforced concrete elements) expressway section and related structures (six separate level and one on level junction, works of art, a complex and a simple, on either side of the road furniture, Engineering separation with site preparation, control points as necessary utilities are concerned, etc) licensing plan, preparation of related industry-specific plans, complete, final acquisition of building permits, as well as the preparation of the implementation plan based on the design plan. The design must take into account that the road nagytávban developed a motorway.

The planning and authorization covers all the necessary corrections and in need of bypass roads.

Job section already completed a feasibility study for review of the "Guidelines for the preparation of feasibility study for the period 2014-2020 the Integrated Operational Programme for Transport Development job application" by the current manual.

Prepared necessary for establishing the trail of a government decree documentation at the time of preparation, according to ministerial regulations in force.

The total volume of detailed technical requirements and a detailed description of the tasks included in the tender documents.

Dear Offeror Please note that a detailed definition of the tasks included in the contract!

  • 1