Call +44 800 9755 164

Public tenders for furniture in Marseille-02 France

Find all Furniture tenders in the world.
Finding business opportunities has never been easier.

Results for furniture. Make a new search!
FurnitureFrancemarseille-02

Furniture

CPRP SNCF | Published December 23, 2016  -  Deadline February 1, 2017

Supply, assembly and office furniture installation.

Lot 1: furniture.

Lot 2 seats.

Lot 3: screen media.

Lot 4: luminaires.

Concrete carcassing work

Conseil régional Provence-Alpes-Côte d'Azur | Published January 19, 2017  -  Deadline February 23, 2017
The construction system is mixed, concrete substructure and ground floor, wood floors (R + 1, R + 2) and cover. 

Works: infrastructure on special foundations, superstructure off wood frame, exterior works, screeds, waterproofing of underground walls, raw concrete and precast architectural concrete on the ground floor of buildings.

Construction: roof structure, glulam frame range greater than 20 meters, timber frame walls, exterior cladding, interior walls Clt, wood blades ceiling soffit lathing wood, wood-concrete floor sealing on wooden support, zinc works, storm drainage, roof safety.

Quantities: about 148 sets joinery glass aluminum.

Quantities: about 152 windows wooden double doors.

External steel joinery, full steel doors, railings, metal stairs, handrails, gates, fences, safety ladders, outdoor breezes sun, ventilation grilles.

Partitions, cladding and soffit plaster plates, partitions Carrobric, interior linings on wooden facades, acoustic linings on wooden facade, false ceiling plasterboard, acoustic false ceiling, wood wool suspended ceiling, false ceiling leachable.

Porcelain stoneware, cove base, straight baseboards, wall covering stoneware, various works Quantities: 2015 square meters of wall faience, 1885 square meters of sealed tiles.

Quantities: 175 single-leaf doors block, approximately 768 square meters of wood flooring.

Quantities: 4280 square meters of paint on substrate raw concrete, 8820 square meters of paint on substrate plasterboard.

Quantities: 1 wood boiler, about 78 hanging toilet bowls.

Quantities: 530-proof luminaires, about 1235 functional luminaires.

Quantity: cooking for about 600 ration.

Quantities 1045 square meters of sports floor.

Climbing wall.

3 Lifts.

preparatory works, earthworks, roads, external works, furniture, metalwork, storm water, retention basins, sewage system, drinking water network, gas network, heating network / ventilation network strong currents / low courfants .

Cleaning, clearing, felling, pruning of existing trees, implementation of topsoil, tree pits, planting pits, planting, watering, back guarantee and maintenance.

  • 1