Call +44 800 9755 164

Public tenders for furniture in Lille France

Find all Furniture tenders in the world.
Finding business opportunities has never been easier.

Results for furniture. Make a new search!

Road construction works

Soreli | Published December 24, 2016

Work for the development of public spaces on the perimeter of Phase 1 - West End - operation Fives Cail Babcock Lille Fives

The works include the construction of approximately 2.9 hectares of public spaces including roads and utilities operations (about 900 ml of roads), landscaped areas of development (approximately 2700 m 2 massive, 120 trees), paving realization (about 5650 m 2 ), Supply and installation of street furniture (including about 930 ml low smooth, support 65 bicycle units, 12 baskets, 42 grates of trees, 210 posts, etc.), children's playground, lighting (130 luminaires) and signaling, development of traffic lights, construction of linear gardens including the supply and installation of automatic sprinklers and and metal goulettes (about 230 ml), earthworks and disposal inert and non-inert rubble, site preparation.

Work on about 1.7 hectares of public spaces: - earthworks (cut and fill) - realization of sanitation and connections - achieving basins with storage control - realization of pavement to the road surface there including the borduration - achieving sheaths floor crossing (water, gas, electricity, and Orange Network Cable, lighting) - completion of the withdrawal sanitation - realization sidewalks, and pedestrian access including borduration - including achievement of parking borduration - realization of the wearing course on roads and parking lots - making final level of ancillary works (sanitation and key mouths) - realization of signaling.

Work on about 1.2 hectares of public spaces: - earthworks (cut and fill) - realization of sanitation and connections - achieving basins with storage control - realization pavement until ROULEME layer. ..

Road construction works

Soreli | Published January 10, 2017  -  Deadline February 15, 2017

Work for the development of public spaces on the perimeter of Phase 1 - West area - operation Fives Cail Babcock Lille Fives

The works include the construction of approximately 2.9 hectares of public spaces including roads and utilities operations (about 900 ml of roads), development of landscaped areas (approximately 2700 m2 of massive, 120 trees), paving realization (about 5650 m2), supply and installation of street furniture (including about 930 ml low smooth, support 65 bicycle units, 12 baskets, 42 grates of trees, 210 posts, etc.), children's playground, lighting (about 130 luminaires) and signaling, development of traffic lights, construction of linear gardens including the supply and installation of automatic sprinklers and and metal goulettes (230 ml), earthworks and disposal of inert and non-inert rubble, site preparation.

Work on about 1.7 hectares of public spaces: earthworks (cut and fill) - realization of sanitation and connections - achieving basins with storage control - realization of pavement to the road surface including the borduration - achieving sheaths floor crossing (water, gas, electricity, and Orange Network Cable, lighting) - completion of the withdrawal sanitation - realization sidewalks, and pedestrian access including borduration - achievement of parking including borduration - realization of the wearing course on roads and parking lots - making final level of ancillary works (sanitation and key mouths) - realization of signaling.

Work on about 1.2 hectares of public spaces: earthworks (cut and fill) - realization of sanitation and connections - achieving basins with storage control - realization of pavement to the road surface including the borduration - achieving ...

  • 1