Call +44 800 9755 164

Public tenders for furniture in Guesnain France

Find all Furniture tenders in the world.
Finding business opportunities has never been easier.

Results for furniture. Make a new search!

Bus shelters

SMT du Douaisis | Published July 30, 2015
Winner
SAS NT Urbaneo
cpvs
44212321, 44112100

Supply and installation of new non-advertising shelters including: non-advertising Shelter "simple and standard." Shed not advertising "awning", without windows return. Non-advertising Shelter "small format", with a roof and smaller back windows as the simple furniture. Non-advertising Shelter "double", with a roof corresponding to the surface of simple furniture assembled 2. The shelters will consist at least of the following: A roof window on the back, two back windows (except for shelter canopy). A baseboard or bib or retaining support for stiffening the holding of windows at the back and on returns. Two frames of information to network dimensions (time and plan).

Engineering services

SMT du Douaisis | Published November 6, 2015
Winner
SAS Segic Ingénierie
cpvs
71300000

Project management change stations central stations in side line "A" TCSP Douaisis including: Demolition or not central stations and possibly left side. The construction of lateral stations (including street furniture in the resort, shelters, lighting, etc.). The recovery of dismantled furniture stations except DAT. The recovery in upstream and downstream stations, infrastructure (concrete platform for TCSP, road and pedestrian roads). The resumption of the SLT, horizontal and vertical signage. The modification of the multi-tube if necessary. The recognition of the networks and their movement if necessary. The docking station (respect for the law on accessibility). The integration and management of traffic conflicts. Taking into account the constraint of provisional docks especially in the phasing of the work. Any travel provisional docks. Deleting temporary docks (dismantling and depositing in the workshop of eveole). The mission is as follows: A preliminary study. A study draft. A project study until the mission of assistance to operations prior to receipt within the meaning of the Act MOP. A scheduling assignment, supervision and coordination. An assistance mission to project management in the conduct of administrative procedures. (If necessary: ​​study case by case, the impact study, public inquiry, etc.) (conditional phase).

Engineering services

SMT du Douaisis | Published February 18, 2015  -  Deadline March 31, 2015
cpvs
71300000

Project management change central stations stations lateral line "A" TCSP Douaisis including: - demolition or not the central stations and possibly left side, - the construction of lateral stations (including street furniture in the resort, shelter, lighting ...) - Recovery furniture resorts dismantled except DAT - the recovery in upstream and downstream stations, infrastructure (concrete platform for TCSP, road and pedestrian roads), - the resumption of SLT , horizontal and vertical signage, - modification of the multi-tube if necessary - the recognition of the networks and their movement if necessary - docking station (compliance with accessibility legislation) - insertion and management of traffic conflicts, - taking into account the constraints of provisional platforms including the timetable of work, - any movement of temporary docks - the removal of temporary docks (dismantling and depositing in the workshop Eveole). The mission is as follows: - a preliminary study - a study of draft - a project study until the mission of assistance to operations prior to approvals granted pursuant to the MOP law - a mission scheduling, management and coordination - a mission to assist contracting authorities in the conduct of administrative procedures. (If necessary: ​​a study case by case, impact assessment, public inquiry, etc ...) (conditional phase).

Bus shelters

SMT du Douaisis | Published April 18, 2015  -  Deadline May 27, 2015
cpvs
44212321, 44112100

Supply and installation of new non-advertising shelters including: non-advertising Abri "single or standard". Non-advertising Abri "awning" without shelter advertising windows not return "Small", with a roof and windows smaller return than simply not advertising "double" shelter furniture with a movable roof 2 corresponding to the surface Simple assembled. The shelters will be composed of a minimum of the following: A roof window on the back, two back windows (except for shelter canopy) A baseboard or bib or retention bracket to stiffen the holding of the windows at the back and on returns. Two frames of information to network dimensions (time and plan).
  • 1