Call +44 800 9755 164

Public tenders for furniture in Lahti Finland

Find all Furniture tenders in the world.
Finding business opportunities has never been easier.

Results for furniture. Make a new search!

Play and the annual audit exercise equipment as well as furniture and equipment

Lahden kaupunkiseudun hankintatoimi | Published February 17, 2017  -  Deadline March 9, 2017
cpvs

the subject of the contract is the Gulf of the city's public green spaces and play areas for play and annual inspections of sports equipment, furniture and accessories. the subject of the contract is the Gulf of the city's public green spaces and play areas for play and annual inspections of sports equipment, furniture and accessories.

Construction work

Lahden Tilakeskus | Published January 28, 2017
cpvs
45000000, 45310000, 45331000, 45332000

Kivimaa swimming pool renovation.

The indoor swimming pool was built in 1986 and there is no use of the early adoption of the actual fundamental improvement. Renovation is made of graduates divided by the main drawings of the contract.

timetables:

The contract Kilpailutus 3 - 4/2017.

Construction 5/2017 - 9/2018.

corrective measures to be taken in connection with fundamental improvements and furniture and equipment costs revised in the upcoming tender documents.

The contract type is divided into a chore, with HVAC and waterproofing work subordination to the main contract of page-contractors.

Kivimaa swimming pool renovation

Lahden Tilakeskus | Published January 27, 2017
cpvs
45000000

The contract is drawn up of the award decision after the end of the waiting period. corrective measures to be taken in connection with fundamental improvements and furniture and equipment costs revised in the upcoming tender documents. The contract type is divided into a chore, with HVAC and waterproofing work subordination to the main contract of page-contractors. Kivimaa swimming pool renovation. The indoor swimming pool was built in 1986 and there is no use of the early adoption of the actual fundamental improvement. Renovation is made of graduates divided by the main drawings of the contract. Timetables: The contract Kilpailutus 3 - 4/2017 construction 5/2017 - 9/2018 List of selection criteria and their short-list of selection criteria and their short contract is drawn up of the award decision after the end of the waiting period.
  • 1