Public tenders for furniture in Iisalmi Finland

Find all Furniture tenders in the world.
Finding business opportunities has never been easier.

Results for furniture. Make a new search!

Residential furniture renovation

Kiinteistö Oy Petterinkulma | Published December 23, 2016  -  Deadline January 24, 2017
cpvs
45000000

Construction includes a kitchen, hall and bedroom furniture for the renewal of electricity work, as well as the hot water system renewal. There are three apartment buildings with a total of 63 apartments. Renovation carried out in a package contract, including in accordance with the construction and building services work documents. the initial implementation period of the project 2/2017 - 12/2017. Construction includes a kitchen, hall and bedroom furniture for the renewal of electricity work, as well as the hot water system renewal. There are three apartment buildings with a total of 63 apartments. Renovation carried out in a package contract, including in accordance with the construction and building services work documents. the initial implementation period of the project 2/2017 - 12/2017.

Office and computing machinery, equipment and supplies except furniture and software packages

Iisalmen kaupunki / Tekninen keskus | Published February 3, 2016
Winner
Tekla Oy
cpvs
30000000

To contribute to the design and kartantuotanojärjestelmä and cadastre, land.

Petter Kumpulaisentie 11 ABC renovation

Kiinteistö Oy Petterinkulma | Published December 2, 2014  -  Deadline December 17, 2014
cpvs
45000000

The renovation, apartment building, housing 27 pcs. The renovation of the new flats built-in furniture, air conditioning, hot water systems and sanitation. The renovation project will be implemented as a package contract, include all construction and building equipment (HVAC) work and materials. Project duration 4/2015 - 11/2015.

Petter Kumpulaisentie 9 ABC renovation

Kiinteistö Oy Petterinkulma | Published February 2, 2016  -  Deadline February 17, 2016
cpvs
45000000

The renovation, apartment building, housing 20 + 6 (new) pieces.

The renovations of the new flats built-in furniture, air conditioning, plumbing systems, roof, balconies repaired and glazed. In addition, the upper housing is divided into two dwelling.

The renovation project will be implemented as a package contract, include all construction and building services (HVAC) work and materials.

Project duration 4/2016 - 12/2016.

Kirkonsalmi school repair 2-phase

Iisalmen kaupunki/tekninen keskus | Published January 28, 2016  -  Deadline February 22, 2016
cpvs
45000000

repair 2-phase comprises according to the plan of the school premises and outside the building and HVAC-works. Include constructions. dismantling and repair / construction of partition walls, lower and intermediate floors, exterior walls of the outer structures, floor coverings and furniture. The tasks include roof work, as well as the renewal of the roof drains. Suspended ceilings renewed. vierustoilla building pits are built rainwater drainage and renewed drainage. Indoors repaired / renewed mm. drainage and ventilation. Electrical Work includes mm. transfer cable management and renewal of lighting.

  • 1