Public tenders for furniture in Schongau Germany

Find all Furniture tenders in the world.
Finding business opportunities has never been easier.

Results for furniture. Make a new search!

Sterilisation, disinfection and hygiene devices

Krankenhaus GmbH Landkreis Weilheim-Schongau | Published April 23, 2016
Winner
Quintec Software GmbH
cpvs
33191000

Washer-disinfectors, sterilizers, Furniture and Equipment Sterilgutdokumentation to equip the central Sterile Hospital Schongau.

Sterilisation, disinfection and hygiene devices

Krankenhaus GmbH Landkreis Weilheim-Schongau | Published December 1, 2015  -  Deadline January 13, 2016
cpvs
33191000, 33197000

Washer-disinfectors, sterilizers, equipment and furniture Sterilgutdokumentation to equip the Central Sterile Hospital Schongau.

Medical equipments, pharmaceuticals and personal care products

Krankenhaus GmbH | Published October 14, 2017
Winner
Metallwarenfabrik Walter H. Becker GmbH
cpvs
33000000

Furniture equipment.

Various workstations and cupboards, cleaning tables, sterile warehouses and others.

Heating, ventilation and air-conditioning installation work

Stadt Schongau | Published January 25, 2017
Winner
Scheel Gebäudetechnik GmbH
cpvs
45331000

The partial reconstruction of the primary school Schongau is created close to the stock School and connected through a connecting corridor. The partial basement new building will be constructed as a two-storey reinforced concrete building with a flat roof. It comprises 4 buildings (part 1: Gymnasium u Hort / Part 2: Aula u classrooms / Part 3: Class house / part 4: Mensa u class house...); Building height: 8 m; GFA: about 6 500m 2 ; BRI: about 24 000m 3 ; Construction: Structural: Monolith mainly in situ, partly architectural concrete requirements; Roof: flat roof construction, rollnahtverschweistes steel, green roof; Facade: wooden elements, concrete precast elements, window and post and beam constructions in wood-aluminum construction.. Interior: drywall, suspended ceilings; Doors / fixed furniture in wood; Flooring: cement screed, tiles, carpet.

VE - GS 06 -. Ventilation incl insulation work.

- About 4 St. ventilation equipment;

- About 5 St. supply and exhaust systems;

- About sum outside air 40 000m 3 /H.

Plumbing and drain-laying work

Stadt Schongau | Published January 25, 2017
Winner
Regenerative Heiztechnik Manfred Schratt
cpvs
45332000

The partial reconstruction of the primary school Schongau is created close to the stock School and connected through a connecting corridor. The partial basement new building will be constructed as a two-storey reinforced concrete building with a flat roof. It comprises 4 buildings (part 1: Gymnasium u Hort / Part 2: Aula u classrooms / Part 3: Class house / part 4: Mensa u class house...); Building height: 8m; GFA: about 6 500m 2 ; BRI: approx 24 000m 3 ; Construction: Structural: Monolith mainly in situ, partly architectural concrete requirements; Roof: flat roof construction, rollnahtverschweistes steel, green roof; Facade: wooden elements, concrete precast elements, window and post and beam constructions in wood-aluminum construction.. Interior: drywall, suspended ceilings; Doors / fixed furniture in wood; Flooring: cement screed, tiles, carpet.

VE - GS 07 - Sanitary incl insulation work.:

- Approximately 720 m sewers;

- Approximately 1 200 meters of water pipes;

- 110 St. Sanitary Furnishings.

Primary school construction work

Stadt Schongau | Published January 26, 2017
Winner
Regeltechnik Seidl
cpvs
45214210

The partial reconstruction of the primary school Schongau is created close to the stock School and connected via a connection gear. The partial basement new building will be constructed as a two-storey reinforced concrete building with a flat roof. It comprises 4 buildings (part 1: Gymnasium u Hort / Part 2: Aula u classrooms / Part 3: Class house / part 4: Mensa u class house...); Building height: 8 m; GFA: approximately 6500 m²; BRI: about 24 000 m³; Construction: Structural: Monolith mainly in situ, partly architectural concrete requirements; Roof: flat roof construction, rollnahtverschweistes steel, green roof; Facade: wooden elements, concrete precast elements, window and post and beam constructions in wood-aluminum construction.. Interior: drywall, suspended ceilings; Doors / fixed furniture in wood; Flooring: cement screed, tiles, carpet.

VE - GS 10 - Building automation:

- 900 hardware-wired data points;

- 1 St. control center with monitor and printer.

Primary school construction work

Stadt Schongau | Published October 31, 2017  -  Deadline December 5, 2017
cpvs
45214210, 45430000

The partial new construction of the elementary school will be created in the immediate vicinity of the existing building and connected via a connecting corridor. The construction takes place during the ongoing school operation. At the same time the building project extension of the Realschule (builder district WM-SOG) is carried out on the same construction field. The teilunterkellerte new building is directed as a two-storey reinforced concrete construction with Flachdacher. It comprises 4 structures (component 1: sports hall and shelter / component 2: assembly hall and specialist rooms / component 3: class house / component 4: canteen and class house); Building height: approx. 8 m; GFA: approx. 6 500 m²; BRI: approx. 24,000 m³; Construction: Structure: Reinforced concrete predominantly in cast-in-situ concrete, partially exposed concrete requirements; Roof: Flat roof construction, rolled stainless steel, green roof; Facade: wooden elements, precast concrete prefabricated parts, window u. Post-and-beam structures in wood-aluminum construction. Interior fittings: drywall, suspended ceilings; Doors / built-in furniture in wood; Floors: Cement screed, tiles, carpet.

Installation of sports hall floor for the elementary school with the following services:

- Waterproofing against soil moisture (DIN 18195-4): approx. 420 m²;

- Linoleum sports floor with substructure and thermal insulation: approx. 420 m²;

- Linoleum sports floor without UK, on ​​screed: approx. 160 m²;

- Playing field marking: approx. 650 m.

Primary school construction work

Stadt Schongau | Published October 5, 2017  -  Deadline November 9, 2017
cpvs
45214210, 45324000

The partial new building of the primary school is created in close proximity to the structure and connected via a link. The construction is carried out during the ongoing school work. On the same site, the expansion of the Realschule (building owner, Landskrona WM-SOG) is being carried out on the same site. The partly basemented new building is constructed as a two-storey reinforced concrete building with flat roof. It comprises 4 building elements (component 1: sports hall and hoard / component 2: aula and technical rooms / component 3: class house / component 4: cafeteria and class house); Building height: approx. 8 m; BGF: approx. 6,500 m²; BRI: about 24,000 m³; Construction: Structure: reinforced concrete mainly in in-situ concrete, partial exposed concrete requirements, roof: flat roof construction, roll-welded stainless steel, Gründach; Facade: Wooden elements, exposed concrete parts, window & Post-beam structures in wood-aluminum construction. Interior: drywall, suspended ceilings; Doors / built-in furniture in wood; Floors: cement, tiles, carpet.

Dry construction work for the primary school with the following services:

- Installation walls approx. 853 m²;

- front shells approx. 285 m²;

- Suspended plasterboard cover approx. 276 m²;

- Suspended plasterboard corner acoustics approx. 58 m².