Public tenders for bin in West-midlands United Kingdom

Find all Furniture tenders in the world.
Finding business opportunities has never been easier.

Results for furniture. Make a new search!

Quotation for Repairs and Maintenance of Bin Room Sprinklers Damper Fire Fighting Equipment

Sandwell Metropolitan Borough Council | Published March 1, 2018  -  Deadline March 19, 2018
cpvs
50413200

Quotation for Repairs and Maintenance of Bin Room Sprinklers Damper Fire Fighting Equipment Sandwell Metropolitan Borough Council is seeking to appoint an experienced contractor to carry out annual repairs and maintenance for installed equipment to Sandwell Metropolitan Borough Council's premises. The Council is seeking to appoint a single contractor for the provision of this service. The maintenance and repair service shall cover Monday to Friday between 9am and 5pm (not including bank holidays). In exceptional circumstances, the contractor may be requested by the premise manager to attend to emergency situations. Based on historical data expenditure is estimated to be in the region of £30,000 per annum. However, this information is intended to assist with the preparation of your bid. The Council does not bind itself to this or any other figure and is not a guarantee of business which may be generated from this contract. The contract period will be for 3 years, commencing 1st July 2018 to 30th June 2021. The Council will be using the In-tend e-Tendering System for this Procurement exercise, please visit https://in-tendhost.co.uk/sandwellmbc to access the Sandwell MBC In-tend Supplier Portal. From here you will be able to register your company, express an interest in the opportunity, and gain immediate access to Quotation or other related documents. To submit a quotation you will be required to 'Opt In'. For a Step by Step user guide to the Sandwell MBC In-tend Supplier Portal please click on the `Guidance for Suppliers` section of the website. All procurement responses must be carried out via the Sandwell MBC In-tend Supplier Portal. If you require further assistance in respect of the system please contact the In-tend support team on 0844 272 8810. Closing date: Monday 19 March 2018 at 15:00hrs

AHA - Fire Alarms Maintenance - PP843

Orbit Housing | Published March 3, 2017  -  Deadline March 28, 2017
cpvs
315182, 316251, 316252

This will encompass maintenance of Fire-Alarms, Fire-Extinguishers, Fire Dampers, AOV, Bin Chute, Dry Riser and Emergency Lights.

2016 - 439 Goring Road Phase 2 2016-17 Concrete repair works & Installation of balcony balustrade including other associated works - AWARD

WM Housing Group | Published April 7, 2017  -  Deadline January 27, 2017
Winner
Gunite (Eastern) Ltd
cpvs
45262300

If you wish to express an interest in this project please ENSURE YOU ARE REGISTERED AND LOGGED INTO OUR PORTAL. The `Express Interest` button will only appear on the Tender Management page if you are logged in. * Applicants are advised to ensure that they do not base their submission on discussions with any other member of WM Housing Group Staff. If you require any clarification on matters contained within the Tender Documents, you must do so via Correspondence of the WMHG E-Tendering portal. Failure to observe this requirement may result in your bid being eliminated. Please note that in the case of tender clarifications where appropriate, answers will be circulated to all tenderers. * Your return must be submitted via 'Submit Return' on the WMHG E-Procurement portal before the deadline date provided in the project details. PROJECT BRIEF The original contract went out to tender in September 2015 where it was awarded to a main contractor. The project consisted of the replacement of pitched roof coverings 3 storey (Including dormer roofs & vertical tiles) improved ventilation and roof membrane/ insulation to maisonettes plus associated items such as insulation, guttering, rain water goods, soffit, fascia boards replacement to all elevations and sub-elements, the bin chute roofs. Other works that were carried out were internal & external lighting, new communal flooring and decorating. During the asbestos soffit removal works to the underside of the walkway, it was discovered the condition of the concrete was in a very poor condition. The balcony installation contractor was put on hold, as the original specification from the structural engineer's design could not be achieved. The works will consist of the following- Concrete repair works to the soffits, fascias of the balcony walkway complete. This will include additional strengthening supports under the walkways, above door openings & brickwork repair. Installation of the waterproofing system to the flat roof extensions including to walkways, balconies, & staircases. Installation of new fascia, guttering, downpipes and all other associated works to the extensions, walkways and around bin chute areas. To continue with the installation of new balustrades throughout 7 blocks including the installation of entrance gates. Please Note: All balustrades and gates have all been manufactured and ready for installation works once all the repair works have been carried out to the walkways.
  • 1