Call +44 800 9755 164

Public tenders for furniture in Tournai Belgium

Find all Furniture tenders in the world.
Finding business opportunities has never been easier.

Results for furniture. Make a new search!

Bedroom, dining room and living-room furniture

CPAS de Tournai | Published October 4, 2016
Winner
Arido NV
cpvs
39143000, 32342400, 33192000, 39113100, 39130000, 39131100, 39142000, 39224340, 39515200, 42418000, 45212230

Supply of furniture for the equipment of a nursing home and care with a capacity of 132 beds including delivery and installation of equipment ready for use.

That furniture includes furniture for offices and places of business, the furniture in the rooms, restaurant and hospitality areas, furniture locker rooms, the "medical" furniture (electric beds, examination tables, stretchers and stretcher), armchairs geriatric, outdoor furniture, draperies and acoustic devices and small supplies (bins, ashtrays, pallet and racking).

MR / MRS Kain - Phase 2 - Current Furniture

C.P.A.S. de Tournai | Published September 29, 2016
cpvs
39143000, 32342400, 33192000, 39113100, 39130000, 39131100, 39142000, 39224340, 39515200, 42418000, 45212230

Supply of furniture for the equipment of a nursing home and care with a capacity of 132 beds including delivery and installation of equipment ready for use.

That furniture includes furniture for offices and places of business, the furniture in the rooms, restaurant and hospitality areas, furniture locker rooms, "medical" furniture (electric beds, examination tables, stretchers and stretcher), armchairs geriatric, outdoor furniture, draperies and acoustic devices and small supplies (bins, ashtrays, pallet and racking).

MR / MRS Kain - Phase 2 - Current Furniture

C.P.A.S. de Tournai | Published April 29, 2016  -  Deadline June 14, 2016
cpvs
39143000, 32342400, 33192000, 39113100, 39130000, 39131100, 39142000, 39224340, 39515200, 42418000, 45212230

Supply of furniture for the equipment of a nursing home and care with a capacity of 132 beds including delivery and installation of equipment ready for use.

That furniture includes furniture for offices and places of business, the furniture in the rooms, restaurant and hospitality areas, furniture locker rooms, "medical" furniture (electric beds, examination tables, stretchers and stretcher), armchairs geriatric, outdoor furniture, draperies and acoustic devices and small supplies (bins, ashtrays, pallet and racking).

Bedroom, dining room and living-room furniture

CPAS de Tournai | Published May 7, 2016  -  Deadline June 14, 2016
cpvs
39224340, 39131100, 42418000

Supply of furniture for the equipment of a nursing home and care with a capacity of 132 beds including delivery and installation of equipment ready for use.

That furniture includes furniture for offices and places of business, the furniture in the rooms, restaurant and hospitality areas, furniture locker rooms, the "medical" furniture (electric beds, examination tables, stretchers and stretcher), armchairs geriatric, outdoor furniture, draperies and acoustic devices and small supplies (bins, ashtrays, pallet and racking).

Medical furniture

CHWapi | Published December 5, 2015
Winner
BTG
cpvs
33192000, 33100000, 33157000, 33157800, 33190000, 33193100, 33193120, 39000000, 39500000, 39515200, 39515400

The contract is awarded by open tender for Lots 3, 4, 5, 6, and by public tender for lots 1, 2, 7, 8.

Lot 48: equipment operating theater equipment, Fixed and mobile storage, room furniture special equipment

CHWapi | Published November 9, 2015
cpvs
33100000, 33192000, 33192200, 33192210, 33192340

Lot 48: equipment operating theater equipment, Fixed and mobile storage, room furniture special equipment

Lot 48: equipment operating room equipment, Fixed and mobile storage, room furniture special equipment

CHWapi | Published November 27, 2014  -  Deadline January 15, 2015
cpvs
33100000, 33192000, 33192200, 33192210, 33192340

Lot 48: equipment operating room equipment, Fixed and mobile storage, room furniture special equipment

Furniture design services

Fabrique d'église de la cathédrale Notre-Dame de Tournai | Published May 4, 2017  -  Deadline July 4, 2017
cpvs
79934000

Tournai Cathedral. Market by negotiated procedure with European advertising aimed at designating a team of project authors for the study and follow-up of the execution of works for the interior design of the nave and transept. The cathedral, which is owned by the province of Hainaut, has been under restoration since 2003. The current phase of the work (transept and the five towers) will end in 2019. In this framework, the Church Factory, , Is launching a public contract to design and implement the interior layout of the restored premises. The market includes the design and realization of the podium, its liturgical furniture and lighting, the design and realization of a baptistry, a desk and a "place of reconciliation and listening", the choice 700 seats for the public and the design of a communication brochure to appeal for donations for the project. La Fabrique wishes that an original and unique artistic project be developed for the interior design of the cathedral of Tournai.

Furniture (incl. office furniture), furnishings, domestic appliances (excl. lighting) and cleaning products

Centre régional de soins psychiatriques Les Marronniers | Published March 6, 2015
Winner
Image Up
cpvs
39000000

Equipment Therapeutic Centre, culture and sports.

Medical equipments

Chwapi | Published November 12, 2015
Winner
Mercura Industries
cpvs
33100000, 33192000, 33192200, 33192210, 33192340

Lot 48: equipment operating theater equipment, Fixed and mobile storage, room furniture specific equipment.

Parking PIRON: Structural work and development of the surroundings

CHWapi | Published October 15, 2015
cpvs
45223300

The company will be responsible for the construction of a car park with 140 seats on the corner of Rue de Barges and Piron Street in 7500 Tournai. This works contract is a single lot under the full responsibility of the selected company, it includes the following sub items: - Preparatory work and selective demolition; - Earthworks general and particular; - Deputy foundations and foundations; - Coatings; - Linear elements; - Drainage and drainage; - Small structures; - Signals; - Turfing, planting and street furniture; - Lighting; - Access management; It is noteworthy that the bidder must comply strictly with the conditions indicated in the planning permit parking.

Parking PIRON: Structural work and development of the surroundings

CHWapi | Published April 21, 2015  -  Deadline May 28, 2015
cpvs
45223300

The company will be responsible for the construction of a 140 parking spaces at the corner of rue de Barges and Piron Street in 7500 Tournai. This works contract is a single lot under the full responsibility of the successful bidder, it includes the following sub lots: - Preparing and selective demolition; - Earthworks general and specific; - Deputy foundations and foundations; - Coatings; - Linear elements; - Drainage and sewage; - Small structures; - Signals; - Grass planting, planting and street furniture; - Lighting; - Access Management; It should be noted that the bidder will strictly observe the conditions mentioned in the planning permit parking.

From Bongnie neighborhood. Development of green spaces.

administration communale de Tournai | Published September 29, 2015  -  Deadline November 10, 2015
cpvs
45000000

The market is mainly to achieve the development works of public green spaces within the site of the former military hospital From Bongnie. Works include: - preparatory work (demolition and dismantling) - earthwork and leveling required - achieving foundations and sub-foundations - the execution of block paving - provision by the contractor to put new materials implemented in the company, unless the tender documents or the bill of quantities so states otherwise - supplies and implemented linear elements - patching and adapting to new developments related roads - small construction Arts (stairs) works - planting work and installation of street furniture - turfing of slope and land-filled - repair of all the facilities damaged by the work - test - supply plans after work

Highways and Drainage Street New Cure

IPALLE SCRL | Published October 4, 2016  -  Deadline November 10, 2016
cpvs
45232400, 45233220

A. drainage work funded SPGE

• Demolition of the existing network

• diameter pipe laying 200 to 315 in US

• diameter pipe laying in EP 315

• Installation of precast concrete manholes

• The transformation of existing visited rooms

• The camera passes through networks

• The achievement of individual connections

B. road development work to the common load

• The road works are carried out on a communal type of network

• Demolition of existing coatings

• Demolition of existing linear and punctual

• Demolition of existing foundations

• Excavation for home side

• asphalt road Direction

• cobblestone road Realization

• Installation of street furniture and signage and road markings

Engineering works and construction works

Direction des Voies hydrauliques de Tournai | Published May 17, 2017  -  Deadline July 7, 2017
cpvs
45220000, 45223110, 45233200, 45212350

This contract consists of carrying out phases 2, 3 and 4 of the modernization works of the Scheldt to the ECMT class Va in the crossing of the tour This work is integrated into the European project known as the "Seine-Scheldt Est" (SEE) who

Includes the upgrade of the Upper Scheldt and the Walloon ridge to the 2,000-meter gauge (ECMT Va class). The project mainly includes:

- the Scheldt quays between Delwart Bridge and Devall Bridge: complete development of undeveloped docks, road surfaces, replacement of guardrails, street lighting, street furniture, plantations, installation of an evolutive nautical halt;

- the Pont des Houx area: replacement of the three stone arches of the existing structure and integration of guide rails;

This work is divided into three geographically distinct phases:

- Phase 2: evolutionary nautical halt, Pier and Fish Piers;

- Phase 3: Quai du Luchet d'Antoing and Quai Vifquin;

- Phase 4: Bridge of Holes and docks Casterman, Sakharov and Vicinaux;

This market includes a firm tranche, phase 2 and two conditional tranches, phases 3 and 4.

Architectural, construction, engineering and inspection services

Ville de Tournai | Published February 25, 2017  -  Deadline May 22, 2017
cpvs
71000000

The project is to restructure the site and building Tournai Expo

Its objectives are to:

- Develop the economic potential of an important city equipment and position it as a complementary qualitative qu'équipement within other MICE infrastructure Eurometropolis, Mons and Hainaut in general,

- Increase the attractiveness of the equipment through enhanced functionality, a welcome and comfortable services and more innovative architecture to make it a tool of identity of the city and economically efficient by placing it back on the scene business tourism (living expo, receptions, multiple events)

- Support the wise use of renewable energy through the development of the economic infrastructure in destination: smart grid,

- Integrate the structure into a sensitive approach to sustainable development (materials, accessibility, short circuit, low power consumption, etc ....)

- Enable highly modular spaces to boost the potential host of infrastructure (rooms, workspaces, conference room, bar area, stage area - exhibitions hall, ...)

- Equip the high tech installations website to provide connected and multimedia services.

This contract relates to a complete study mission and monitoring the performance of work which includes all the regular benefits borne by the architect, including benefits in the field of stability, the infrastructure, the audio, special techniques (heating, air conditioning, ventilation, electricity, lighting, fire safety and intrusion), to the EPB (energy performance of buildings), the signage interior and exterior design, furniture and landscape design and scenography.

Polaris area of ​​economic activity, Planning Phase 1-T1303TPEP-PEPVRD1

Agence Intercommunale IDETA scrl | Published October 27, 2016
cpvs
45233120

This contract will focus on the network of road II creation.

This market is organized in two phases clearly identified and detailed in the bill of quantities. To know :

Part 1A: The layout and equipment of the central corridor of the area of ​​activity and roads dead end and the adjoining parcels except for parcels 1, 2 and 3: (Division 1 and Division 3 )

- Preparatory work (demolition, logging, ...) and the site installation;

- Recycling (sorting, crushing and screening) on ​​site recoverable materials;

- Leveling and earthworks required for construction of the trays, roads, ponds, ...;

- Embankments and ditches of development;

- Laying a triple sewage network;

- Construction of concrete roads in the coating or hydrocarbon and associated equipment (concrete sidewalks, signs, ducts, drains, ...);

- Construction of small works of art and design of retention basins, settling and infiltration;

- Opening and provision of a common trench for laying impétrants + distribution of water, the medium voltage equipment and public lighting;

- Arrangements of public spaces (street furniture, fences, ...) and plantations

- All other work included the surveying.

Division 3 "Medium Voltage" is part of the work in Part 1A

Part 1B: The excavation, grading and layout of parcels 1, 2 and 3: (Division 2)

- Preparatory work (demolition, logging, ...) and the site installation;

- Recycling (sorting, crushing and screening) on ​​site recoverable materials;

- Earthworks and leveling required for the development of these plates and the stockpiling of fill land;

- Embankments and ditches of development;

- All other work included the surveying.

Road construction works

Agence intercommunale IDETA SCRL | Published November 2, 2016
Winner
Viabuild Sud SA
cpvs
45233120

This contract will focus on the network of road II creation.

This market is organized in two phases clearly identified and detailed in métré.À namely:

Part 1A: The layout and equipment of the central corridor of the area of ​​activity and roads dead end and the adjoining parcels except for parcels 1, 2 and 3: (Division 1 and Division 3 ):

- Preparatory work (demolition, logging, ...) and the site installation,

- Recycling (sorting, crushing and screening) on ​​site recoverable materials,

- Leveling and earthworks required for construction of the trays, roads, ponds ...

- Construction of embankments and ditches,

- Laying a triple sewage network,

- Construction of concrete pavement in road or hydrocarbon and associated equipment (concrete sidewalks, signs, ducts, drains ...)

- Construction of small works of art and design of retention basins, settling and infiltration,

- Opening and provision of a common trench for laying impétrants + distribution of water, the medium voltage equipment and public lighting,

- Arrangements of public spaces (street furniture, fences, ...) and plantations,

- All other work included the surveying.

Division 3 "Medium Voltage" is part of the work in Part 1A.

Part 1B: The excavation, grading and layout of parcels 1, 2 and 3: (Division 2)

- Preparatory work (demolition, logging ...) and site installation,

- Recycling (sorting, crushing and screening) on ​​site recoverable materials,

- Earthworks and leveling required for the development of these plates and the stockpiling of fill land

- Construction of embankments and ditches,

- All other work included the surveying.

  • 1