Public tenders for pulp in Poland

Find all Forestry tenders in the world.
Finding business opportunities has never been easier.

Results for forestry. Make a new search!

Pipeline cleaning pulp.

PGE Górnictwo i Energetyka Konwencjonalna S.A. | Published December 21, 2013
cpvs
65410000

The service consists of cleaning the sludge pipelines selected pulp.

Supply of products from paper pulp.

 | Published January 13, 2014  -  Deadline January 23, 2014
cpvs
33198000

The contract is for the supply of products from paper pulp in accordance with the form of price-Annex 2 to the ToR ..

Vascular supply of disposable paper pulp and plastic coasters

 | Published September 11, 2014  -  Deadline September 19, 2014
cpvs
33772000

Vascular supply of disposable paper pulp and plastic coasters.

Pipelines pulp sand, installation of pumps, pulp sand and sand mud separator including delivery devices ..

 | Published June 28, 2013  -  Deadline July 15, 2013
cpvs
45252100, 45252200

The contract is for the supply and construction of pulp sand discharge pipe with the supply and installation of submersible centrifugal pumps, portable crane pole and mud sand separator. 1 Discharge pipes piaskowej.Zakres pulp material includes the construction and the supply of pulp sand discharge pipe (the trench), which will connect the new pump installations existing grit confluent with the building of the station, where it will have a sand separator scrubber - length of about 30m. The cables should be made with pipe Eigerflex (flexible pipes with heating tape) or equivalent. 2.Pompy.Zakres material covers the installation and the supply of submersible centrifugal pumps designed for pumping sand pulp 3 units (including one reserve). 3.Przenośny jib crane with manual lifting capacity adapted to the weight of the sand pulp pump, mounted on a reinforced concrete foundation poured. 4 Sand washer supplier shall submit the tender documents: Technical description of the parameters of the engine, the type of material from which the device has been made. Figure device with the name of the supplier. List of fast-wearing during the warranty period. A minimum of two references from the operators of such devices and the results of the organic content in the washed out sand made during the life of the product. Technical, Material All parts sand separator-washer (with auger) in contact with sewage - sand (except valves, bearings, motors, etc.) are made of stainless nierdzewnej.Obciążenie sand up to 1000 kg / h.Wydajność per pulp sand to 8 l / s.Gwarantowana reduction of organics to less equal to 3% loss on ignition ..

Delivery of products from recycled pulp in the macerator.

 | Published September 10, 2013  -  Deadline September 18, 2013
cpvs
33141000

The contract is for the supply of disposable articles made of recycled pulp in maceratorach the S + from Haig - Engineering Company Ltd. ..

Dishes from paper pulp to use 1 x macerator.

 | Published March 27, 2014  -  Deadline April 4, 2014
cpvs
33000000

Dishes of paper pulp, 1 x use the macerator according to Annex hereto.

Supply of equipment for the disposal of vessels from pulp with the service financing and disposable utensils with pulp character case ZOZ/DZP/PN/05/14

 | Published March 19, 2014  -  Deadline March 27, 2014
cpvs
33772000

1 The subject of this contract is: Delivery of equipment for disposal of vessels from pulp with the service financing and disposable utensils from cellulose pulp, character matters ZOZ/DZP/PN/05/14 to the location indicated by the Purchaser in the health care institutions in the Oława, ul. Baczyńskiego 1 2 The contract covers two tasks: Task No: 1 - device for disposal of vessels from pulp Task No. 2 - disposable tableware pulp 3 The obligations of the Contractor in the execution of Task 1 a) Object of the contract complies with the specifications set out in Annex No. 2 and 9 of the Terms of Reference will be delivered, installed and running at the Purchaser. b) The Supplier is obliged to train staff at their own expense with the release of personal certificates (certificate). c) The Contractor shall provide funding for the implementation of the order within the framework provided directly by the Contractor or any other loan or credit institutions ..

Successive supplies disposable utensils from cellulose pulp.

 | Published November 25, 2013  -  Deadline December 4, 2013
cpvs
33198000

The contract is for the supply of blood successive disposable pulp (ducks, swimming pools, kidney bowls, bowls for general use, chamber pots for children, caps for swimming pools, coasters pools) for the disposal of all types of macerators. A detailed description of the contract ie the list range forming part of the contract and the performance requirements and the amount of a particular product range can be found in Annex 3 to this Terms of Reference - Mon. Form of range range.

Mechanical pulp

Komendant Stołeczny Policji | Published December 31, 2013
cpvs
24910000, 44111800, 44112200

Kleje

Delivery with installation and commissioning macerators diapers and dishes from the pulp.

 | Published August 22, 2014  -  Deadline September 1, 2014
cpvs
33100000

Delivery, assembly and commissioning macerators to diapers and dishes from the pulp. Value of the contract shall not exceed the amount specified in regulations issued pursuant to Art. 11 paragraph. 8 of the Act of 29 January 2004. Procurement law (t.jedn. Acts. Laws of 2013. Pos. 907, as amended. D.).

Gdańsk Oliwa: Delivery of grain, pellets, wheat bran, oats and beet pulp miażdżonego to City Zoo in Gdansk - Oliwa

Miejski Ogród Zoologiczny "Wybrzeża" | Published October 14, 2016  -  Deadline October 12, 2016
Winner
Gospodarstwo Rolne Kazimierz Bębenek, Lisewiec,ul. Żuławska, 83-050 Kolbudy, kraj/woj. pomorskie.
cpvs
15613000, 03211400, 03211600, 15613000, 15613000

Task 1 - beet pulp 12.000 kg Task 2 - 23.000 kg of grain Task 3 - sharps 14.000 kg Task 4 - wheat bran 10.000 kg Task 5 - crushed oats 24.000 kg.

Dryers for wood, paper pulp, paper or paperboard

Bogdan Michalski „Tartak” | Published January 26, 2017
Winner
Muehlboeck Holztrocknungstechnik GmbH
cpvs
42991400

Feel free to make an offer in the supply, installation and commissioning drying chamber for drying wood with circulating air through the ceiling apparent and loaded with a forklift from the longest side. To set the open air. The offer for the company Tartak Bogdan Michalski, based in Racot ul. School 23, 64-000 Kościan.

Heating chamber for drying wood, specialized in dry oak wood, consisting of four chambers with circulating air through the ceiling apparent and loaded with a forklift from the longest side, to set in the open air.

1) Construction of cassette aluminum.

2) Support frame aluminum with a minimum thickness of 100 mm.

3) Mineral wool insulation.

4) The rear cover of aluminum sheet trapezoidal.

5) Strength of the minimum snow load 120 kg / m².

6) sliding gate loading (loading from the longitudinal side with a forklift).

7) Control Computer fully automatic.

8) The control cabinet.

9) Single frequency converters to control fans.

10) Manufactured in compliance with EMV standards.

11) Use a mixer type MI-22

12) Spraying pressure min. 25 bar

13) Support service 24 hours / day, 7 days a week

14) Ability to control remotely from mobile devices.

Dryers for wood, paper pulp, paper or paperboard

Bogdan Michalski „Tartak” | Published August 17, 2016  -  Deadline September 21, 2016
cpvs

A detailed description of the contract is in the tender documents posted on the website www.tartakmichalski.pl

Dryers for wood, paper pulp, paper or paperboard

Wrocławski Park Technologiczny S.A. | Published April 29, 2015  -  Deadline May 13, 2015
cpvs
42991400, 42214200, 42990000

Suszarki do drewna, masy papierniczej lub tektury

Delivery of grain, pellets, wheat bran, beet pulp to Coast City Zoo in Gdansk - Oliwa

 | Published October 1, 2013  -  Deadline October 9, 2013
cpvs
03211400, 03211120, 03211600, 15613000, 15615000, 15613000

Part A delivery task and dried beet pulp briquetted simple - 12.000kg Part B - grain, meal, wheat bran, oats, crushed Delivery: Task II: grain a) barley by BN 89/913114 in the amount of 2.500kg b) wheat PN - R -74 103 in the amount of 2.500kg c) oats PN-R-74106 in the amount of 22.000kg Task III: grain products and cereals) in the amount of barley grits 10.000kg b) the amount of wheat middlings 10.000kg Task IV: wheat bran in the amount of 15.000kg Task V: crushed oats in an amount of 27.000kg.

Dryers for wood, paper pulp, paper or paperboard

Wrocławski Park Technologiczny S.A. | Published May 19, 2015
Winner
Zakłady Maszynowe HAMECH Sp. z o.o.
cpvs
42991400, 42214200, 42990000

The contract is the design, delivery (transportation, lodging), installation and commissioning of the brand new (Installation drying processes of qualitative research and energy efficiency, including the training of the persons proposed to operate the device in terms of operation and maintenance. The pilot plant consists of the following main components: - drying chamber - ventilation unit - Installation of heat pumps, - automatic system control and measurement. By designing understood as the execution of projects for individual system components in wersjielektronicznej provided on the media. Employer provides the following types of projects: - Construction project for drying chamber (in 3D CAD format) - a list of components and describes the performance of ventilation, - schematic diagram of a heat pump installation, together with a description selected by the Contractor fittings and dimensions of the frame structure, - project control and power circuits with a list of selected components of the automation system control and measurement. By delivery is meant delivery and bringing the components of the dryer to the installation site. By assembling understood Bringing all components, as indicated by the Employer place individual components are fitted by approved projects, to connect all the components together. Through the launch is meant to connect the various elements of the system for the automation, control and measurement and verification of the correctness of their actions, as well as the correct operation of the control system.

Supply of protective clothing, work boots medical kits for cannulation of large vessels, blood j.uż. of paper pulp and foam for skin care in the conduct of an anti prevention, case ZP.3520/38/13

 | Published August 6, 2013  -  Deadline August 23, 2013
cpvs
33199000

Supply of protective clothing, work boots medical kits for cannulation of large vessels, blood j.uż. paper and pulp foam skin care prevention conducting an anti divided into 5 parts.

Reconstruction of the surface of the municipal road No. 104765 (st. Louis Pulp) located in the Municipality Sarzyna Nowa Sarzyna.

 | Published August 9, 2013  -  Deadline August 27, 2013
cpvs
45212212

4.1. The contract is for the reconstruction of the road surface communal No. 104765 (Pulp Louis Street) located in the commune Sarzyna New Sarzyna. 4.2. The contract scope includes: 1 General building industry 1) preparation of the site, 2) protection of the construction site, 3) the purchase and delivery of materials needed for the job, 4) execution of works, 5) ordering the construction site. 2 Other duties and charges shall be the duty and the cost of the contractor must also: 1) prepare a draft of traffic during construction, together with the opinion of him by the Mayor and Municipal New Sarzyna and approved by the Prefect Leżajsk, 2) surveying services (surveying staking and as-built documentation) and 3) the costs associated with the acceptances of the works and the completion of trials and technical research, 4) the cost of waste disposal, 5) protection of the roads leading to the site from damage caused by transport contractor or its subcontractors. In the case of the destruction of roads contractor will be required to repair them. The contract scope is detailed in the attached project documentation and technical execution and delivery of the works. 4.3. Specified in the bill of quantities names are examples. Accepted materials, equipment and technology equivalent to the mentioned in the bill of quantities provided achieving technical standards. Equivalents in accordance with its definition must have no parameters, for example, worse than indicated in the bill of quantities. The contractor, which refers to equivalent solutions is obliged to prove that offered by the materials meet the requirements specified by the Employer. 4.4. All materials intended to be used in order to carry out the order must comply with the requirements of Art. 10 of the Building Act. 4.5 cost estimate must be in full compliance with the provisions contained in the bill of quantities (material, description, quantity) and will include unit prices for each item. 4.6. The documents that will be required of the contractor in the course of the final: 1 The notification of the completion of works, the Contractor will switch kolaudacyjny sampling, consisting of the following documents (for each task a separate set of documents): 1) As-built inventory geodetic surveying resource admitted to the district office in Leżajsku - 3 copies, 2) construction project executive with marked changes by the designer - if there are any, and 3) approvals and certificates for the materials with the endorsement of the site manager for the incorporation, 4) certified by the Supervisor estimate of post-completion, 5) a statement by the construction manager for compliance of the facility with the construction project, the permit for the construction of , applicable laws and European Union standards; 6) protocols, works disappearing. 2 Documents must be numbered and arranged according to the table of contents, copies of the documents should be certified as a true copy. 3 The Employer shall set the date and start the final approval of the agreement or call for complete documents or other documents required to receive within 7 days from the date notice of the achievement of readiness to receive notifying, by the Contractor. 4 Failure to provide the documents required by the Employer to receive suspend the signing of the final protocol of the works ..

Rebuilding ditches opaskowych R-1, R-2 and River Pulp within the task Modernization object pond.

 | Published September 17, 2013  -  Deadline October 2, 2013
cpvs
45240000, 45246000, 45247000, 45244000

3.1 The purpose of this contract is the execution of works involving the restoration and reconstruction of the River Pulp and ditches sheathing R-1, R-2, and the dam reservoirs 1, 2 and 3 3.2 The scope of work includes: 1 Implementation of preparatory works and earthworks including but not limited to: a) Mechanical grubbing dense shrubs and lichens, tree felling grubbing stumps with a diameter of 36-45 cm, b) Manual mowing thick lichen hard with slopes and wygrabienie wykoszonych lichen - 8278.00 m2, c) blowdown backhoe odmularkami bottom feet wide and 0.80 m (thickness odmulanej 40 cm) - 557.00 m, d) blowdown backhoe odmularkami bottom feet wide and 0.80 m (odmulanej thickness of 30 cm) - 557.00 m, e) Execution zgarniakowymi shovels digging ditches, drainage channels and trenches with flood control - 507.00 m3, f) Levelling slopes and bottom of the trench with water works - drainage - 1602.00 m2, g) Rozplantowanie dozers land extracted from trenches along the trench and its development through the implementation of basic crops and sow grass mix, 2 Execution of works on ditches umocnieniowych R-1, R-2 including but not limited to: a) Implementation of single bands of bowel fascine on Wed 15 cm in the roof slope ditches - 2828.00 m, b) Performance palisade of pins or bars on Wed 7 - 9 cm in the ditch R-2 - 154.00 m, c) The burial pits with slopes of metastasis at a distance to a distance of 3 m ditch R-2 - 302.50 m3, d) Purification of namułu culverts on Wed 0.8 m at a depth of sludge in relation to the diameter of the third trench R-1 - 8,00 m, e) Purification of namułu culverts on Wed 0.4 m at a depth of sludge in relation to the diameter of the third trench R-2 - 12.00 m, f) Exercise zgarniakowymi earthmoving excavators - 303.00 m3, 3 Restoration of the river pulps including, but not limited to: a) Mechanical grubbing dense bushes and undergrowth, b) Manual mowing rare lichens from the riverbed width up to 1.60 m wygrabienie wykoszonych lichen - 1600.00 m2, c) Manual mowing thick lichen hard with slopes of more than 2.0 W and wygrabienie wykoszonych lichen - 7160.00 m2, d) blowdown backhoe - odmularkami feet with a width of up to 1.60 m, thickness of the odmulanej 20 cm - 835.00 m, e) Rozplantowanie dozers earth excavated from the trenches along the trench and its development through the execution of sowing areas zadarnionych mixture of grasses, 4 Renovation and demolition dike monks including but not limited to: a) the grubbing-up of thick bushes and undergrowth, b) Manual mowing thick lichen hard with slopes and crown of the dike and wygrabienie wykoszonych lichen - 35671.00 m2, c) Implementation of trench diggers and przekopów - 86 , 00 m3, d) Demolition of concrete thick. to 20 cm of concrete pipes - a sunbed Wed pipes 0.4 m, e) Performance aluminum core earth dam thickness of 1.0 m 2.0 m - 6.00 m3, f) Exercise of earthmoving excavators and compaction of embankments forming and earth dams with a height of up to 10 m - 80.00 m3, g) Levelling crown slopes and embankments and slopes humusowanie with sowing the humus layer thickness of 5 cm - 107.20 m2, 5 Blowdown tanks and canopy development of ore mined from the bottom of tanks including but not limited to: a) Implementation of excavation dozers - 19,704.00 m3, b) Movement of earth dozers, c) Implementation of shovels and podsiębiernymi zgarniakowymi przekopów and trenching and construction and maintenance of the wooden mattress Shovels, d) Implementation of earthmoving excavators to transport ore, e) Management of spoil dredged from the bottom of the tanks. Define the detailed scope of work: design documentation, technical specification performance and acceptance of, hereinafter referred to as STWiORB and bill of quantities. Employer provides for the execution of works in two stages, which are set out in Appendix 11 to the terms of the contract hereinafter referred to as / TOR /.

Bydgoszcz: purchase and supply of disposable medical equipment, including electrodes, needles, cannulas, products for urological examinations, the tip of the harmonic scalpel, ventouse maternity, products for assisted delivery, resuscitator, mask anesthetic tape Kinesiology, products made from pulp to macerator , et. al.

Samodzielny Publiczny Wielospecjalistyczny Zakład Opieki Zdrowotnej Ministerstwa Spraw Wewnętrznych w Bydgoszczy | Published February 27, 2017  -  Deadline July 6, 2016
Winner
Centrum Zaopatrzenia Medycznego i Weterynaryjnego Centrowet - Cezal Sp. z o.o., ul. Dąbrowskiego 133/135, 60-543 Poznań, kraj/woj. wielkopolskie.
cpvs
33123210, 33125000, 33141200, 33141321, 33140000, 33140000, 33141116, 33155000, 33157400, 33196000, 33198000, 33141410

1. The subject of the proceedings is to purchase and supply of disposable medical equipment, including electrodes, needles, cannulas, products for urological examinations, the tip of the harmonic scalpel, ventouse maternity, products for assisted delivery, resuscitator, mask anesthetic, Kinesiology tape, products from the pulp cellulose into the macerator, et. al. specifically set out in Annex 2 to SIWZ. 2. Object of the contract includes 12 indivisible packets for which ordering a possibility of partial offers, provided that the offer in each package should be full and should meet the specific requirements set out in the form of price, constituting Annex 2 to SIWZ and requirements contained in siwz.