Call +44 800 9755 164

Public tenders for forestry in Bzenec Czech Republic

Find all Forestry tenders in the world.
Finding business opportunities has never been easier.

Results for forestry. Make a new search!

Building insulation Secondary school of gastronomy, hotel industry and forestry Bzenec

Střední škola gastronomie, hotelnictví a lesnictví Bzenec | Published August 10, 2015
cpvs

The subject of this contract is to reduce the energy intensity of the object SS gastronomy, hotel industry and forestry in Bzenec. As part of the revitalization project is divided into two parts: 1. insulation of the building envelope and replacement of the outer apertures second decentralization heating. Public contract covers three school buildings (SO 01 - school, SO 02 - SO hostel and 03 - gymnasium), for which construction works are carried out regarding particular: modifications and relocation of lightning protection, replacement and repair of roof elements, replacement of fillings in the facade for the new plastic, insulation perimeter walls contact system (ETICS), installation of new gas equipment. The object SO 02 and SO 03 dormitory gym will be part of the works also complete renovation of the heating system, the delivery of a new heating sources, including the related supplies, as instrumentation, valves etc. As part of the SO 03 - the gym will also be carried out on the construction of the ventilation (supply and installation of recuperation ventilation hot-air units), measurement and control, including the power connection of the heat recovery units.

Building insulation Secondary school of gastronomy, hotel industry and forestry Bzenec

Střední škola gastronomie, hotelnictví a lesnictví Bzenec | Published June 11, 2015
cpvs

The subject of this contract is to reduce the energy intensity of the object SS gastronomy, hotel industry and forestry in Bzenec. As part of the revitalization project is divided into two parts: the first thermal insulation of the building envelope and replacement of fillings second external heating decentralization. Public contract covers three school buildings (SO 01 - school, SO 02 - SO hostel and 03 - the gym) for which construction work will be carried out, particularly on: editing and translating a lightning rod, replacement and repair of roof elements, replacement of fillings in the façade for the new plastic, insulation perimeter masonry contact system (ETICS), installation of new gas equipment. The object SO 02 and SO 03 dormitory gymnasium construction work will be part of a complete reconstruction of the heating system, the delivery of new sources of heating systems, including related supplies as instrumentation, valves and the like. As part of the SO 03 - the gym will also be made regarding the construction of the ventilation (supply installation of ventilation and recuperative hot-air units), measurement and control, including the power connection of the heat recovery units.

Building insulation High School gastronomy, hotel and forestry Bzenec

Střední škola gastronomie, hotelnictví a lesnictví Bzenec | Published April 20, 2015  -  Deadline November 15, 2015
cpvs
45000000

As part of the revitalization project is divided into two parts: 1. insulation of the building envelope and replacement of external doors, windows second decentralization heating. Public contract covers three school buildings (SO 01 - school, SO 02 - hostel and SO 03 - gym) for which construction work will be carried out, particularly on: editing and translating a lightning rod, replacement and repair of roof elements, replacement of fillings in the façade for the new plastic, thermal insulation of external walls contact system (ETICS), installation of new gas equipment. The object SO 02 and SO 03 hostel gym will be part of the works as the complete reconstruction of the heating system, delivery of a new heating sources including the related supplies in the form of instrumentation, valves, etc.. As part of the SO 03 - gym will also be made part of the construction of air (supply and installation of regenerative hot air unit), measurement and control, including the power connection of the heat recovery units. a) a description needs to be the fulfillment of public contracts fulfilled Within the revitalization project is divided into two parts: 1. The insulation of the building envelope and replacement of external doors, windows second decentralization heating. Public contract covers three school buildings (SO 01 - school, SO 02 - hostel and SO 03 - gym) for which construction work will be carried out, particularly on: editing and translating a lightning rod, replacement and repair of roof elements, replacement of fillings in the façade for the new plastic, thermal insulation of external walls contact system (ETICS), installation of new gas equipment. The object SO 02 and SO 03 hostel gym will be part of the works as the complete reconstruction of the heating system, delivery of a new heating sources including the related supplies in the form of instrumentation, valves, etc.. As part of the SO 03 - gym will also be made part of the construction of air (supply and installation of regenerative hot air unit), measurement and control, including the power connection of the heat recovery units. c) a description of the relationship between the subject contract and the client's needs, building modifications to improve the functional characteristics of the object and thus extend the life of the regenerated structures. d) the expected due date for a public contract term performance of the contract (implementation phase) is set for July 2015 - November 2015

"Building Insulation Middle School gastronomy, hotel industry and forestry Bzenec" - additional works according to amendment no. 1 contract for work no. 145 of 15 of 31. 7. 2015

Střední škola gastronomie, hotelnictví a lesnictví Bzenec, příspěvková organizace | Published December 8, 2015
cpvs

The subject of this contract are additional works that were not included in the original tender conditions, the need arose due to circumstances which authority is acting with due diligence could not have foreseen and such additional works required for the execution of the original works in accordance with § 23 . 7 point. a) the PPA. Objectively unforeseen additional work :: 1. Adjustment of roof construction in places outcome of HVAC and sanitation 2. Change the ventilation duct 3. Modification of supporting the ceiling and hang HVAC Drive 4. Demolition of existing concrete sidewalk gutter fifth Degradation bet. footing (gas) 6. Insulation of perimeter walls hostels 7. Repairs cracks (corner wall-ceiling) 8. Adjust pergolas roofing at the main entrance ninth Translations tenth Window railing Requested extra work: 1. Pick the embankment of the roof (clay) 2nd drainage area for parking hostels (KG D125) 3. Maintaining the current energycanals fourth wall and floor tiling for new windows and door sills fifth DTD instead of plastic sixth Incorporation jambs and lintels seventh increase in the number of incorporation lining - crack windows eighth Sculpt panel to Warehouse confectionery production 9. Electrical and Lighting tenth paint facades - 4.NP SO 01 11th Paintings 12th Editing radiators and heaters 13. Corrections paving and expansion ramps 14th Air headquarters on the 15th Electric blinds 16th Replacement of existing plastic windows 17 . New elements on the façade (shelter, flag holders, Showcase) 18. The new covering over the locker rooms + roof ascent 19th Editing staircase and entrance objectively unforeseeable canceled work: 1. Deduction for hourly billing rate 2. Compensation under KZS insulator substrate 3. Isolation Plinth (XPS) Requested canceled work: 1. Pick the embankment of the roof (clay) 2. tiles and paving of new windows and doors
  • 1