Call +44 800 9755 164

Public tenders for financial in Tarnobrzeg Poland

Find all Financial tenders in the world.
Finding business opportunities has never been easier.

Results for financial. Make a new search!
FinancialPolandtarnobrzeg

Renovation of the facade of the building of the Historical Museum of the City Tarnobrzeg Street. Pawlowski.

 | Published November 24, 2015  -  Deadline December 9, 2015
cpvs
45453000

Pawlowski, including: Demolition works, including: a reflection internal plaster and dismantle the wall covering plinth of stone slabs Construction plastering, including: cleaning the surface of the walls, przemurowanie cracks, fumigation and impregnation of walls, plaster restoration, exterior-drawn, painted plaster, lining the plinth of stone slabs Flashings and nakrywy walls of isolation diaphragm horizontal foundation walls - injection execution scuffguard at the museum building with appendices 1) a) construction project b) the bill of quantities c) STWiOR contractor is obliged to perform and submit to the Employer, on or before the signing of this 1389 contracts) in both paper and electronic b) schedule of - timely - Financial Bills of quantities are auxiliary and are used to illustrate the scale of the works, they are designed to help contractors evaluate the cost of the contract. Establishes the following hierarchy of documents in order to determine in case of doubt whether an item to be within the scope of this contract: a) construction project b) the bill of quantities c) the technical specification performance and acceptance of the Project - technical descriptions and drawings, przedmiarach works, the Technical Specifications execution and acceptance of construction works have been shown the producer's name, names, trademarks, patents or origin of the materials or equipment used for the implementation of this order - wherever Purchaser has added the word or equivalent. Ordering a possibility tender equivalent to those described and specified in the required parameters in the tender documents, provided that they have not worse technical parameters. 1-3 Public Procurement Law, allows for equivalent solutions. Intended for use equipment and materials must meet the parameters specified in the design documentation and should not be worse than the design. It is not allowed to make changes in the assumptions of project documentation, the effects of which rzutowałyby to adopt the draft terms of architectural and especially technological parameters. Detailed scope of work for the implementation includes design documentation - est. No. 8 to the SETC Implementation of the contract is subject to Polish law, in particular the Act of July 7 1994 1623), the Act of 23 April 1964. Procurement Law

Reconstruction of the internal road ul. E. Orzeszkowej a length of 240 m on the stretch of Bank PKO to skyscrapers in Tarnobrzeg ..

 | Published October 17, 2014  -  Deadline November 4, 2014
cpvs
45233142, 45233200, 45111240, 45112100, 45232452, 45100000, 45230000, 45233000, 45112710

1.Przedmiotem contract is the execution of the pn .: Orzeszkowa a length of 240 m over a distance of Bank PKO to skyscrapers in Tarnobrzeg. A detailed description of the object of the contract: Orzeszkowa the length of 240 m over a distance of Bank PKO to skyscrapers in Tarnobrzeg. Ongoing Phase I will be the scope of which includes: Reconstruction of road construction and parking spaces - which consists of making a new foundation and pavement with cobblestones. Reconstruction and expansion of pedestrian - involves performing renovation of existing and construction of these roads sidewalks with cobblestones. Reconstruction of drainage elements - involving the execution of new drains and integrate them into the existing drainage system, and execution of new bars street. Reconstruction of energy networks interfering with the reconstruction of the road network. Scope Investment Phase I documentation is marked with green boundary lines. Formal legal documents will be provided by the Employer within 7 days of signing the contract. with annexes 1) a) Projects implementing b) The technical execution and delivery of the works c) Bills of the Contractor shall execute and submit to the Employer within 7 days from the date of signature of this agreement: 1389) in both paper and electronic b) a detailed schedule of factly -terminowo-financial Bills of quantities are auxiliary and are used to illustrate the scale of the works, they are intended to assist contractors in estimating the cost of the contract. Establishes the following hierarchy of documents in order to determine in case of doubt whether an item to be within the scope of this contract: a) construction project b) the bill of quantities c) technical specification implementation and acceptance of works Project - technical descriptions and drawings, przedmiarach of work, Technical Specifications Execution and Acceptance of Construction Works, were recognized manufacturer names, names, trademarks, patents, or origin of the materials or equipment used for the implementation of this contract - everywhere Contracting Authority has added the word or equivalent. Employer allows the possibility of submitting bids equivalent to those described and shown in the required parameters in the Terms of Reference provided that they have no worse specifications. 1-3 of the PPA, allows for equivalent solutions. Provided for the use of equipment and materials shall comply with the parameters specified in the design documentation and should not be worse than the design. Is not allowed to change the assumptions of design documentation, the effects of which rzutowałyby on in the draft terms of architectural and especially technological parameters. Detailed scope of work for the implementation includes the design documentation - est. No. 8 to the Terms of Reference

Reconstruction of the internal road - ul. Prusa, the stretch of Zwierzyniecka street to street. M. Dabrowska and from the street. Dąbrowskiej to the end of the episode.

 | Published October 17, 2014  -  Deadline November 4, 2014
cpvs
45233000, 45111000, 45233252, 45223300, 45233127, 45233222, 45232410, 45233290, 45112710

1.Przedmiotem order to perform the task entitled .: Dabrowska the end of the episode detailed description of the object of the contract: The scope of the task: The range of tasks includes reconstruction of the existing road to the repair of roads, sidewalks and parking paving technology, extension of new parking spaces, rebuilding These ranges were determined in Fig. No.2 in green - according to legend aim of the upgrade is to restore the damaged road surfaces and car parks and street drainage as well: building new parking spaces and upgrade the lighting. The contract is for the implementation of Phase - I is: 1.Przebudowy road construction and expansion 2.Przebudowy pedestrian 3.Przebudowy Prusa drainage elements: the width of the road - from 3.5 to 7.6 m class street: D-Access design speed: 50 km / h (urban area) category traffic load: KR 1-2 sidewalks with a width of 1.5 - 3.0 m parking parking longitudinal - 7 pc. parking perpendicular parking - 142 pcs. (5 disabled) parking parking miter - 43 pcs. felling of trees Prusa Dabrowska the end of the episode in Tarnobrzeg. Water supply is designed for PE 100 DN 160, PN 1.0 MPa Such refraction are exposed to increased stress as a result of hydraulic shocks, and therefore protects them by making the resistance of precast concrete blocks or poured concrete, with the condition accurately basing them on the ground in natural state. Documents - legal, will be delivered by the Purchaser within 7 days of signing the contract. with attachments: a) Design b) The technical specifications c) of quantities the Contractor shall perform and submit to the Employer within 7 days from the date of signature of this agreement: 1389) in both paper and electronic b) a detailed schedule of works and timely financial-Bills of works are auxiliary and are used to illustrate the scale of the works, they are intended to assist contractors in estimating the cost of the contract. Establishes the following hierarchy of documents in order to determine in case of doubt whether an item to be within the scope of this contract: a) construction project b) the bill of quantities c) technical specification implementation and acceptance of works Project - technical descriptions and drawings, przedmiarach of work, Technical Specifications Execution and Acceptance of Construction Works, were recognized manufacturer names, names, trademarks, patents, or origin of the materials or equipment used for the implementation of this contract - everywhere Contracting Authority has added the word or equivalent. Employer allows the possibility of submitting bids equivalent to those described and shown in the required parameters in the Terms of Reference provided that they have no worse specifications. 1-3 of the PPA, allows for equivalent solutions. Provided for the use of equipment and materials shall comply with the parameters specified in the design documentation and should not be worse than the design. Is not allowed to change the assumptions of design documentation, the effects of which rzutowałyby on in the draft terms of architectural and especially technological parameters. Detailed scope of work for the implementation includes the design documentation - est. No. 8 to the Terms of Reference

Credit granting services

Wojewódzki Szpital im. Zofii z Zamoyskich Tarnowskiej w Tarnobrzegu | Published November 11, 2015  -  Deadline December 17, 2015
cpvs
66113000

Object of the contract: The contract is to service a loan / loan in the amount of 12,500,000.00 zł designed to improve liquidity by consolidating parts of the loans currently serviced loan / credit will be used to repay liabilities to ZUS and US. Description of the order: CPV according to the Common Procurement Vocabulary: 66113000-5 credit granting services 12.00 The purpose of comparing tenders - loan / credit will be launched once in the amount of 12,500,000.00 zł on 28 December 2015. While the deadline for the establishment of security in the form of assignment of receivables from a contract with the NFZ lender / creditor shall be set at 30 days from the date of signing the agreement the loan / credit. 2015. Or the installment for January 2016. In the case of the commission, will be paid by the Purchaser in the amount specified in the offer (up to 1% not more) on launch day loan / credit through the deduction of a sum loan / credit to the bank account of the Purchaser. The Contracting Authority reserves the right to have a bank current account in another bank than the Contractor. For purposes of comparison of tenders Purchaser assumes 365 days each year (including leap), and a month according to the actual amount of calendar days. Purchaser agrees that for the first interest period has been applied WIBOR 1M of payday loans. Then, the first installment would take into account the interest for the period from payment of the loan until 31 January 2016. Through working days Purchaser understands days, public holidays and Saturdays. The repayment by installments liability are dwindling. In the event of early repayment of monthly equity interest will be counted until the repayment of the installment. In the event of early repayment of the capital interest will be counted until the loan / credit. 618 as amended.) ". In case of delays in the repayment of capital the interest rate for overdue debt may correspond to a maximum amount of statutory interest. The loan / loan will be: In this case, the Employer required to join the Bills of Exchange Offer Model Agreement. Until its establishment just a blank promissory note together with declaration / promissory note agreement. c) the costs of collateral will be borne by the Purchaser. Additional information: a) the provisions of the Act on medical activity require the opinion of the social council Hospital (Article 48), which is expressed before signing the loan / credit, 2013, 2014 and 2015 titled measures covering negative financial result in the amount for the year 2012 - 1942 thous. zł; for the year 2013 - 1.049 thousand. zł; for 2014 - 2.827 thousand. zł c) at the date of SWIZ Employer does not have information on the transformation of the hospital into a commercial company. The amount of tax liabilities on 30.09.2014. Is: contributions - 92,814.00 zł; interest - 0.00 zł; prolongation fee - 19,475.00 zł e) The purchaser declares that he has three current accounts, bank Pekao SA: the basic account, account to the Social Fund, called the bill. sum deposit (for a deposit and security deposit), f) The purchaser declares that the bank account was not subject to seizure bailiff hospital has only nadwykonania for the year 2013. in the amount of 375,826.00 zł h) Purchaser declares that nadwykonania on 09/30/2015 with 2015 amounts to 3,691,336.49 zł, including hospital treatment - 2,368,066.52 zł, the Purchaser undertakes to update the assignment of claims each year, after signing the agreement / annex of the National Health Fund for the year. j) the number of beds in the hospital as of 10/31/2015 is 398 pieces. k) the number of patients treated (no overnight stays for chemotherapy) in 2014 amounted to - 18,752, in January-September 2015 - 12,700
  • 1