Construction work for water and sewage pipelines

Gmina Liszki | Published November 25, 2015
Winner
Lider Konsorcjum: FHU INSTBUD Stanisław Boguta S.j.
cpvs
45231300, 45232410, 45231100, 45110000

The contract is for the construction of a sanitary sewage system in the villages Mników, Czułów and Baczyna in the municipality of foxes in the following areas: 1) construction of sanitary fi channel 250 with a total length of 491.0 m; 2) construction of sanitary fi channel 200 with a total length of 4 637.8 m; 3) construction of sanitary fi channel 160 with a total length of 335.4 m; 4) construction of laterals fi 160 with a total length of 1 090.0 m; 5) Completion of a sewage pumping station - pumping station P3 with the construction of 140 financial pressure pipeline with a total length of 1 387.40 m - along with the implementation of monitoring channel performance drilling, asphalt resurfacing (for municipal and county roads) along with substructure and the execution of the sewerage system built inventory. The scope of works includes design, building and executive, technical specifications performance and acceptance of works and bills of quantities. The Contractor shall perform the object of the contract in accordance with: a) the technical documentation of the investment, conditions resulting from the applicable technical regulations and construction law; b) requirements under the applicable Polish Standards mentioned in the project, technical approvals, certification of quality for materials used to perform the contract; c) the principles of sound technical knowledge of the trade, established usages and tips Employer; d) drawn up by himself BIOZ plan, approved by the Employer; e) updated or developed by them and approved the draft temporary traffic organization; f) offering and cost estimate. Contractor shall perform the object of the contract with their own materials used in construction, in line with the current BS and the necessary certificates. This applies to all materials that will be used for the implementation of the agreement in accordance with the offer. Embedded permitted only materials undamaged. Names of materials used by the designer in the various documents are not binding in this tender and are merely illustrative.

Construction work for water and sewage pipelines

Gmina Liszki | Published September 3, 2015  -  Deadline October 12, 2015
cpvs
45231300, 45232410, 45231100, 45110000

The contract is for the construction of a sanitary sewage system in the villages Mników, Czułów and Baczyna in the municipality of foxes in the following areas: 1) construction of sanitary fi channel 250 with a total length of 491.0 m 2) construction of sanitary fi channel 200 with a total length of 4 637.8 m 3) construction of sanitary fi channel 160 with a total length of 335.4 m 4) construction of laterals fi 160 with a total length of 1 090.0 m 5) Completion of a sewage pumping station - pumping station P3 with the construction of 140 financial pressure pipeline with a total length of 1 387.40 m - along with the implementation of monitoring channel performance drilling, asphalt resurfacing (for municipal and county roads) along with substructure and the execution of the sewerage system built inventory. The scope of works includes design, building and executive, technical specifications performance and acceptance of works and bills of quantities. The Contractor shall perform the object of the contract in accordance with: a) the technical documentation of the investment, conditions resulting from the applicable technical regulations and construction law, b) requirements under the applicable Polish Standards mentioned in the project, technical approvals, certification of quality for materials used to perform the contract, c) principles of sound technical knowledge of the trade, established usages and tips Employer d) developed by themselves BIOZ plan, approved by the Employer; e) updated or developed by them and approved the draft temporary traffic organization; f) offering and cost estimate. Contractor shall perform the object of the contract with their own materials used in construction, in line with the current BS and the necessary certificates. This applies to all materials that will be used for the implementation of the agreement in accordance with the offer. Embedded permitted only materials undamaged. Names of materials used by the designer in the various documents are not binding in this tender and are merely illustrative.

Reconstruction of the municipal road (plot Reg. No. 1524) which consists of the construction of the pavement with drainage and repair the road surface above. road in Mników, Gm. The foxes ..

 | Published October 9, 2014  -  Deadline October 27, 2014
cpvs
45111200, 45232411, 45233220, 45233260, 45233253, 45233222

Foxes. 2.Zadanie includes the reconstruction of the road with a length of 0.378 km, including: 1) Stage I: - demolition - construction of pavement with concrete cobblestones - 239.80 m2 - downhill road with concrete cobblestones - 60.70 m2, 500 mm - 161,35 m, - widening the roadway and pavement - 1407 m2 - dehydration - wastewater from el. 135 m of concrete, tray - 22.5 m, ACO DRAIN - 33.50 m, - reconstruction of the fence - 71.5 m, 2) Stage II: - demolition - construction of pavement with concrete cobblestones - 159,70 m2, - downhill road with concrete cobblestones - 62.40 m2, 600 mm - 154 m, - widening the roadway and pavement - 920 m2 - dehydration - wastewater from el. 85.50 m of concrete, strengthening embankments blanks - 28.35 m, ACO DRAIN - 9,50 m. 4.Szczegółowy scope of work determined by the following documents: 1) construction project - executive, 2) bills of quantities, 3) technical specifications and performance acceptance of the works. 5.Wykonawca is also required to: 1) the execution of the project temporary traffic organization, 2) the execution of marking time traffic organization, 3) implementation of an inventory of as-built surveying. 6.Wykonawca committed to performing the contract in accordance with: 1) the technical execution and delivery of the works, 2) requirements under the applicable standards, including the Polish Norm PN and technical approvals, 3) the specification of essential terms of the contract, offer and cost estimate, 4) compliance with the construction and with due diligence. 3.Wykonawca declares that the scope of works covered by nin. Agreement is not in doubt, and that he knows the current state of the place of works and all the factors that may affect the implementation of the agreement and declares that there are no obstacles in the execution of the agreement. 4.Wykonawca prepare the material and financial schedule which shall include a schedule of payments by the Employer for work performed: 1) in 2014. To the amount of 100,000.00 zł gross (1 settlement invoice), 2) in 2015. Remaining amount.