Call +44 800 9755 164

Public tenders for financial in Kielce Poland

Find all Financial tenders in the world.
Finding business opportunities has never been easier.

Results for financial. Make a new search!

Financial and insurance services

Kasa Rolniczego Ubezpieczenia Społecznego Oddział Regionalny w Kielcach | Published November 30, 2016
cpvs
66000000

The contract is the provision by the Contractor service of the service on behalf of the Employer pensions, hereinafter referred to as "benefits" paid to the farmers' social insurance in the form of cash directly into the hands of beneficiaries or of their authorized at the address of residence, according to tradition payments (individual, joined), against confirmation of receipt. Serving benefits will apply to beneficiaries living in municipalities located in Świętokrzyskie covered by the activities of the Regional Branch ASIF in Kielce. Proceedings are divided into 13 parts. Purchaser accepts submission by the Contractor partial bids. The Contractor may submit an offer for one or more lots. The service will be performed by the Contractor on the basis of lists drawn up by the Employer transfers and individual and combined messages broadcast on payments blanks effort Employer.

1.Wykonawca under the contract will be required to provide beneficiaries KRUS pensions in the form of a cash payment terms, ie. The 10th day and the 20th day of each calendar month.

2.Usługa will be executed by the Contractor on the basis of lists drawn up by the Employer transfers and individual and combined remittances of payments, which the Contractor will receive 4 working days before the date of the payment of benefits, the Contracting Party in Kielce, ul. Polish Army 65B.Środki financial payment of benefits to the Employer will provide in the form of non-cash transfer to the Contractor's bank account no later than 2 business days before the expiry of those deadlines benefit payments.

3.Za return undelivered services contractor shall not charge fees.

4.Szczegółowe information on the subject of the contract documentation order- tender documents with attachments.

Financial and insurance services

Kasa Rolniczego Ubezpieczenia Społecznego Oddział Regionalny w Kielcach | Published October 4, 2016  -  Deadline November 3, 2016
cpvs
66000000

1.Wykonawca under the contract will be required to provide beneficiaries KRUS pensions in the form of a cash payment terms, ie. The 10th day and the 20th day of each calendar month.

Financial and insurance services

Kasa Rolniczego Ubezpieczenia Społecznego Oddział Regionalny w Kielcach | Published October 18, 2016  -  Deadline November 9, 2016
cpvs
66000000

The contract is the provision by the Contractor service of the service on behalf of the Employer pensions, hereinafter referred to as "benefits" paid to the farmers' social insurance in the form of cash directly into the hands of beneficiaries or of their authorized at the address of residence, according to tradition payments (individual, joined), against confirmation of receipt. Serving benefits will apply to beneficiaries living in municipalities located in Świętokrzyskie covered by the activities of the Regional Branch ASIF in Kielce. Proceedings are divided into 13 parts. Purchaser accepts submission by the Contractor partial bids. The Contractor may submit an offer for one or more lots. The service will be performed by the Contractor on the basis of lists drawn up by the Employer transfers and individual and combined messages broadcast on payments blanks effort Employer.

Financial and insurance services

Kasa Rolniczego Ubezpieczenia Społecznego Oddział Regionalny w Kielcach | Published November 5, 2016  -  Deadline November 14, 2016
cpvs
66000000

The contract is the provision by the Contractor service of the service on behalf of the Employer pensions, hereinafter referred to as "benefits" paid to the farmers' social insurance in the form of cash directly into the hands of beneficiaries or of their authorized at the address of residence, according to tradition payments (individual, joined), upon receipt odbioru.Doręczanie benefits will apply to beneficiaries living in municipalities located in Świętokrzyskie covered by the activities of the Regional Branch ASIF in Kielce. Proceedings are divided into 13 parts. Purchaser accepts submission by the Contractor partial bids. The Contractor may submit an offer for one or more lots. The service will be performed by the Contractor on the basis of lists drawn up by the Employer transfers and individual and combined messages broadcast on payments blanks effort Employer.

Construction work

Świętokrzyski Zarząd Dróg Wojewódzkich | Published April 19, 2016  -  Deadline May 31, 2016
cpvs
45000000, 71320000, 45100000, 45200000, 45220000, 45230000, 45111200, 45112100, 45112730, 45221100, 45231220, 45231300, 45232452, 45233120, 45233122, 45233124, 45233128, 45233140, 45233220, 45233221, 45233222, 45233290, 45236000

The contract will be implemented on the basis of material and financial schedule of design work, schedule of - financial and construction works contract.

Construction work

Świętokrzyski Zarząd Dróg Wojewódzkich | Published April 11, 2017
cpvs
45000000, 71320000, 45100000, 45200000, 45220000, 45230000, 45111200, 45112100, 45112730, 45221100, 45231220, 45231300, 45232452, 45233120, 45233122, 45233124, 45233128, 45233140, 45233220, 45233221, 45233222, 45233290, 45236000

The contract is to develop a complete design documentation (construction project and executive), together with the necessary arrangements, opinions and approvals, and decisions required to apply for and obtain a decision on whether to allow the implementation of road investment (ZRID), construction works and supervision over their realizations project.

The task carried out in the system design and build. The detailed scope of works included in the functional and operational program, the Technical Specifications, Program and Spatial Concept with attachments and decisions. The contract will be implemented on the basis of material and financial schedule of design work, schedule of - financial and construction works contract.

The contract is to develop a complete design documentation (construction project and executive), together with the necessary arrangements, opinions and approvals, and decisions required to apply for and obtain a decision on whether to allow the implementation of road investment (ZRID), construction works and supervision over their realizations project. The task carried out in the system design and build. The detailed scope of works included in the functional and operational program, the Technical Specifications, Program and Spatial Concept with attachments and decisions. The contract will be implemented on the basis of material and financial schedule of design work, schedule of - financial and construction works contract.

Credit granting services

Gmina Kielce | Published September 9, 2016  -  Deadline October 18, 2016
cpvs

Loan to finance the planned budget deficit of Kielce, in connection with the implementation of some investment projects in the context of long-term projects involving property included in the Multi-annual Financial Forecast of Kielce for the years 2016-2040. The Contracting Authority requires the lodging of security to this part of the contract in the amount of 20 000 PLN.

Kielce: Feasibility study for the project: The development of public transport in Kielce

Gmina Kielce | Published July 22, 2016  -  Deadline July 20, 2016
Winner
Kancelaria VIP Sp. z o.o., ul. Metalowa 4 pok. 301, 10-603 Olsztyn, kraj/woj. warmińsko-mazurskie.
cpvs
71241000

The contract is a feasibility study together with the necessary economic and financial analysis for the project development of public transport in Kielce. The project is planned for implementation from the European Regional Development Fund under the Operational Programme Eastern Poland 2014-2020, Measure 2.1 Sustainable urban transport.

Demolition, site preparation and clearance work

Świętokrzyski Zarząd Dróg Wojewódzkich | Published March 25, 2017  -  Deadline April 6, 2017
cpvs
45111000, 45111200, 45231000, 45312311, 45231300, 45231400, 45232100, 45232130, 45232310, 45232410, 45233000, 45233220, 45233221, 45233253, 45233290, 45233292, 45232440, 45232452, 45262210, 45223500, 45232451, 45221111

The contract is for the execution of works within the framework of the project entitled .: Construction of the northern bypass Chmielnik within DW 765 from the junction with DK 73. The task will be implemented on the basis of project documentation Mon .: Development of design documentation for the project .: The construction of the northern ring road in Chmielnik the provincial road No. 765. the contract will be executed in accordance with the bill of quantities, offer cost estimate, detailed technical specifications, material and financial schedule and contract.

Kielce: Feasibility study for the project: development of public transport infrastructure in Kielce

Gmina Kielce | Published July 28, 2016  -  Deadline July 26, 2016
Winner
EPRD Biuro Polityki Gospodarczej i Rozwoju Regionalnego Sp. z o.o., ul. Szkolna 36A, 25-604 Kielce, kraj/woj. świętokrzyskie.
cpvs
71241000

The contract is a feasibility study together with the necessary economic and financial analysis for the project: development of public transport infrastructure in Kielce. The project is planned for implementation from the European Regional Development Fund under the Operational Programme Eastern Poland 2014-2020, Measure 2.1 Sustainable urban transport. A detailed description of the contract is included in Appendix No. 1 to SIWZ. Terms and method of performing the contract specifies the model agreement, which constitutes Appendix No. 7 to SIWZ.

Kielce: supply, services and works more for the project. Construction Waste Disposal Plant for the city of Kielce and pow. Kielce in Promniku k / Kielce

Przedsiębiorstwo Gospodarki Odpadami Sp. z o.o. | Published August 12, 2016  -  Deadline June 22, 2016
Winner
SCHNEIDER ELECTRIC POLSKA Sp. z o.o., ul. Konstruktorska 12, 02-673 Warszawa, kraj/woj. mazowieckie.
cpvs
45300000, 45310000, 45311100, 72212000, 45317000, 30200000, 30211200

The scope of tasks included the design, supply, installation and commissioning of the following tasks (collectively technological installations): a) The SCADA system and CCTV, b) Network electro-energy, c) telecommunication engineering and network signal, d) SAAP. The contract is to supplement and adapt the tasks to the needs of the Purchaser together with the full integration of new / changed elements of networks and systems covered by the basic agreement (JRP / K-1DT.4-OEP / 12/2015) in line with the scope specified in the schedule of financial-forming Regret. 3 ..

Kielce: Structure of the pavement the provincial road No. 752 on the section Szerzawy - Jadowniki from km 23 + 007 to km 24 + 530

Świętokrzyski Zarząd Dróg Wojewódzkich | Published August 9, 2016  -  Deadline August 8, 2016
Winner
Firma Remontowo - Budowlana GRANIT Wiesław Garnek, Jarząbki 11, 28-114 Gnojno, kraj/woj. świętokrzyskie.
cpvs
45100000, 45233000, 45233000, 45230000, 45233280

The scope of works: The contract covers work on the stretch of provincial road No. 752 from km 23 + 007 to km 24 + 530 and in particular in the field of road construction industry - building pavement width 1.5 m, 1.6 m and 2.0 m, along with reconstruction of drainage along the provincial road No. 752 - the execution expand the existing bituminous pavement by 0.5 mb. - Construction of bus bays - 3 pieces. The contract will be implemented according to the Quick Technical Documentation pn. Structure of the pavement the provincial road No. 752 on the section Szerzawy - Jadowniki from km 23 + 007 to km 24 + 530, Bill of Quantities, offer cost estimate, detailed technical specifications and material and financial schedule.

Repair of the bridge over the provincial road No. 742 m. Oks at km 81 + 402

 | Published April 6, 2016  -  Deadline April 22, 2016
cpvs
45221100

The scope of works: As part of the overhaul is expected to make demolition of road surface on the object and access roads, demolition railing, demolition of concrete beams podporęczowych, concrete overlay of the deck and insulation. Once completed demolition perform new insulation tar paper, a new surface on the object covers the surface resin paving, railings and boards transient. This work should be done half of the object, the obywającym the traffic on the other half of the roadway. The contract will be executed in accordance with the shorthand Technical Documentation, Bill of Quantities, offer cost estimate, detailed technical specifications and schedule of works - Financial works.

Construction of the pavement in the provincial road No. 751 section of New Słupia - Ostrowiec St. in m. Mychów Cologne from km 45 + 256.18 to km 46 + 005.81 left side.

 | Published February 13, 2015  -  Deadline March 2, 2015
cpvs
45100000, 45233142

Scope of works: As part of the proposed construction is expected to make: - pavement on the left away from the edge of the carriageway of 5.5 m km 45 + 256.18 to km 45 + 425.00 for existing road ditch; - Pavement on the left side of the road away from the edge of 4.75 m km 45 + 425.00 to km 46 + 005.81 for existing road ditch; - Execution of the culvert under the pavement with concrete pipes Ø 1 000 mm with concrete walls. The contract will be implemented in accordance with the Documentation Project, bill of quantities, tender estimate, the Detailed Technical Specifications and Schedule of material and financial work.

Construction work

Świętokrzyski Zarząd Dróg Wojewódzkich | Published May 5, 2015
Winner
Przedsiębiorstwo DUBR Sp. z o.o.
cpvs
45000000, 45100000, 45200000, 45233162, 45233290, 45112710

The investment in its scope includes: Implementation of a permanent organization of traffic on the stretch of the border m. Kielce (DW 786 in Gorki Szczukowskie) to the m. Gatniki in the framework of the Project. "Bike routes in Eastern Poland - Świętokrzyskie". Cycle route will be routed in the road on general principles, together with other participants of traffic. In terms of this investment is to make cycling trail marking involving the purchase, delivery and incorporation of road signs (including characters such as "R" logo Green Velo). Moreover, in the framework of the task should be provided for care of greenery throughout the present episode. The contract will be executed in accordance with the Documentation project, Przedmiarami of work, cost estimates bids, the detailed technical specifications, Feasibility Study and financial-material schedule of works and the agreement.

Construction work

Świętokrzyski Zarząd Dróg Wojewódzkich | Published May 5, 2015
Winner
Przedsiębiorstwo DUBR Sp. z o.o.
cpvs
45000000, 45100000, 45200000, 45233162, 45233290, 45112710

The investment in its scope includes: Implementation of a permanent organization of traffic on the section from m. Sandomierz - Gr. m. Kielce in the framework of the Project. "Bike routes in Eastern Poland - Świętokrzyskie". Cycle route will be routed in the road on general principles, together with other participants of traffic. In terms of this investment is to make cycling trail marking involving the purchase, delivery and incorporation of road signs (including characters such as "R" logo Green Velo). Moreover, in the framework of the task should be provided for care of greenery throughout the present episode. The contract will be executed in accordance with the Documentation project, Przedmiarami of work, cost estimates bids, the detailed technical specifications, Feasibility Study and financial-material schedule of works and the agreement.

Construction work

Świętokrzyski Zarząd Dróg Wojewódzkich | Published February 7, 2015  -  Deadline March 25, 2015
cpvs
45000000, 45100000, 45200000, 45233162, 45233290, 45112710

The investment in its scope includes: Implementation of a permanent organization of traffic on the section from m. Sandomierz - Gr. m. Kielce in the framework of the Project. "Bike routes in Eastern Poland - Holy Cross province." Cycle route will be routed in the road on a general basis, together with other participants in the movement. In terms of this investment is to make cycling trail marking involving the purchase, delivery and incorporation of road signs (including characters such as "R" logo Green Velo). Furthermore, under the care of the task should be provided around the greens present episode. The contract will be implemented in accordance with the Documentation project, Przedmiarami works, quotes bids, the Detailed Technical Specifications, Feasibility Study and financial-material schedule of works and contract.

Reconstruction of the provincial road No. 749 on the section Horns - młynek nieświński (version pavement with surface) - pavement strengthening from km 3 + 900 to km 5 + 350.

 | Published August 11, 2015  -  Deadline August 26, 2015
cpvs
45000000, 45100000, 73111000, 45221100, 45111100, 45111200, 45233220, 45233222, 45111000, 45240000, 71320000

Rebuilding the provincial road No. 749 on the section Horns - młynek nieświński (version pavement with surface) - strengthening the pavement from km 3 + 900 to km 5 + 350. Scope of work: - milling of existing pavement Wed. thick. 4.5 cm; - Arranging a binding layer profiling with AC 16 thick. min. 5 cm; - Making the wearing of AC 11 S Gr. 4 cm; - The development, agreement and implementation of the project constant traffic organization along with the implementation of the labeling; - Markings structural hardened materials; - Arranging the fiber geogrids glass-carbon under the bonding layer; - Renovation of the bridge in km 4 + 920; - Repair of the culvert at km 4 + 850. The contract will be executed in accordance with the technical documentation (abbreviated), bill of quantities, cost estimate bids, the detailed technical specifications, material and financial schedule and contract.

Construction work

Świętokrzyski Zarząd Dróg Wojewódzkich | Published February 4, 2015  -  Deadline March 20, 2015
cpvs
45000000, 45100000, 45200000, 45233162, 45233290, 45112710

The investment in its scope includes: Implementation of a permanent organization of traffic on the stretch of the border m. Kielce (DW 786 in Gorki Szczukowskie) to m. Gatniki in the framework of the Project. "Bike routes in Eastern Poland - Holy Cross province." Cycle route will be routed in the road on a general basis, together with other participants in the movement. In terms of this investment is to make cycling trail marking involving the purchase, delivery and incorporation of road signs (including characters such as "R" logo Green Velo). Furthermore, under the care of the task should be provided around the greens present episode. The contract will be implemented in accordance with the Documentation project, Przedmiarami works, quotes bids, the Detailed Technical Specifications, Feasibility Study and material and financial schedule of works and contract.

Demolition, site preparation and clearance work

Świętokrzyski Zarząd Dróg Wojewódzkich | Published February 16, 2017  -  Deadline March 30, 2017
cpvs
45111000, 45111200, 45231000, 45312311, 45231300, 45231400, 45232100, 45232130, 45232310, 45232410, 45233000, 45233220, 45233221, 45233253, 45233290, 45233292, 45232440, 45232452, 45262210, 45223500, 45232451, 45221111

The contract will be executed in accordance with the bill of quantities, offer cost estimate, detailed technical specifications, material and financial schedule and contract.

The contract is for the execution of works within the framework of the project entitled .: Construction of the northern bypass Chmielnik within DW 765 from the junction with DK 73.

The scope of works - within a / the task is expected to:

2.7 km,

1.4 km

- Construction of a roundabout pięciowlotowego average, which is the inclusion of the existing communication system to the proposed provincial road No. 765,

- Construction czterowlotowego small roundabout at the junction DW 765 and DP 0022T,

- Construction trójwlotowego small roundabout on the integration of existing DW 765,

- Reconstruction, construction and development of intersections,

- The construction of access roads,

- Construction of pedestrian-bicycle,

- Construction of sidewalks within intersections and bus stops,

- Reconstruction and construction of individual meetings and public

- The construction of bus bays along the platforms and places to shelter,

- The construction of the road viaduct over the county road No. 0355T,

- Construction of retaining structures along the DW 765,

- The construction of crossings for amphibians and small animals

- The construction and reconstruction of road lighting,

- The construction of storm water drainage along with equipment and tanks podczyszczającymi retention and infiltrating,

- Reconstruction of the existing technical infrastructure colliding with the designed range: power grid, a network of tele-health network,

- Construction of service areas for cyclists,

- Construction of a road restraint and execution of marking horizontal and vertical.

The contract will be executed in accordance with the bill of quantities, offer cost estimate, detailed technical specifications, material and financial schedule and contract.