Call +44 800 9755 164

Public tenders for financial in Regensburg Germany

Find all Financial tenders in the world.
Finding business opportunities has never been easier.

Results for financial. Make a new search!

Engineering services

Barmherzige Brüder gemeinnützige Krankenhaus GmbH | Published August 1, 2015
Winner
IB Christl GmbH
cpvs
71300000

The hospital St. Barbara is the medical center catering for the city and the district of Schwandorf. It is the largest hospital in the district of Schwandorf. As part of the planning target multiple components are rebuilt, renovated and rebuilt and expanded. House 6: Due to the currently envisaged new building creates the possibility of the EC the ZEA to situate as a new place of business, about to accomplish as well as in the plains, the expansion of bed capacity. Furthermore, a new intensive care unit is built. Here are approximately 5.500m2 NF newly constructed, more surfaces rebuilt in inventory. Possibly there is a subdivision into further stages of construction, depending on the financial security by the funding agencies. The anticipated period of performance: 08 / 2015-12 / 2018th

Architectural and related services

Barmherzige Brüder gemeinnützige Krankenhaus GmbH | Published August 1, 2015
Winner
PEITHNER architekten
cpvs
71200000

The hospital St. Barbara is the medical center catering for the city and the district of Schwandorf. It is the largest hospital in the district of Schwandorf. As part of the planning target multiple components are rebuilt, renovated and rebuilt and expanded. House 6: Due to the currently envisaged new building creates the possibility of the EC the ZEA to situate as a new place of business, about to accomplish as well as in the plains, the expansion of bed capacity. Furthermore, a new intensive care unit is built. Here are approximately 5 500 m2 NF newly constructed, more surfaces rebuilt in inventory. Possibly there is a subdivision into further stages of construction, depending on the financial security by the funding agencies. The anticipated period of performance: 08 / 2015-12 / 2018th

Load-bearing structure design services

Barmherzige Brüder gemeinnützige Krankenhaus GmbH | Published August 1, 2015
Winner
BPR Dr. Schäpertöns + Partner
cpvs
71327000

The hospital St. Barbara is the medical center catering for the city and the district of Schwandorf. It is the largest hospital in the district of Schwandorf. As part of the planning target multiple components are rebuilt, renovated and rebuilt and expanded. House 6: Due to the currently envisaged new building creates the possibility of the EC the ZEA to situate as a new place of business, about to accomplish as well as in the plains, the expansion of bed capacity. Furthermore, a new intensive care unit is built. Here are approximately 5 500 m2 NF newly constructed, more surfaces rebuilt in inventory. Possibly there is a subdivision into further stages of construction, depending on the financial security by the funding agencies. The anticipated period of performance: 08 / 2015-12 / 2018th

Engineering services

Barmherzige Brüder gemeinnützige Krankenhaus GmbH | Published August 1, 2015
Winner
IB Butz, Hausmann & Hiller
cpvs
71300000

The hospital St. Barbara is the medical center catering for the city and the district of Schwandorf. It is the largest hospital in the district of Schwandorf. As part of the planning target multiple components are rebuilt, renovated and rebuilt and expanded. House 6: Due to the currently envisaged new building creates the possibility of the EC the ZEA to situate as a new place of business, about to accomplish as well as in the plains, the expansion of bed capacity. Furthermore, a new intensive care unit is built. Here are approximately 5 500 m2 NF newly constructed, more surfaces rebuilt in inventory. Possibly there is a subdivision into further stages of construction, depending on the financial security by the funding agencies. The anticipated period of performance: 08 / 2015-12 / 2018th

Development of transaction processing and custom software

Landesamt für Finanzen Dienststelle Regensburg | Published November 6, 2015
Winner
IA Information Systems AG
cpvs
72232000

With this procurement exercise a reinforcement of the Java development teams in Regensburg is to be achieved. There are two areas are covered, in which incur continual further development tasks: - The Integrated Budgetary and cash method (IHV) sums on the basis of previous methods budgetary Online (HOL), Bayer. Financial management system (BayMBS) and cash and imprest accounting method (KABU) all costs incurred in the state house-hold circuit activities under one roof. Currently IHV is used by 8000 users. IHV uses a client-server architecture and has a swing-based client. On the server side messaging technology and realized as Enterprise JavaBeans services are used; - The Bavarian Travel Expenses System (BayRKS) that supports the 300 clerk of central clearing houses of the State Office of Finance in setting Rei-sekostenanträgen is newly developed and is to be put into production in 2018. BayRKS will use a client-server architecture with a JavaFX client. Further details are yet to be determined. The State Office of Finance, Department Regensburg grants employees three Java developers.

Development of transaction processing and custom software

Landesamt für Finanzen, Dienststelle Regensburg | Published July 25, 2015  -  Deadline September 14, 2015
cpvs
72232000

With this procurement exercise a reinforcement of the Java development teams in Regensburg is to be achieved. There are two areas are covered, in which incur continual further development tasks: - The Integrated Budgetary and cash method (IHV) sums on the basis of previous methods budgetary Online (HOL), Bayer. Financial management system (BayMBS) and cash and imprest accounting method (KABU) all costs incurred in the state house-hold circuit activities under one roof. Currently IHV is used by about 8000 users. IHV uses a client-server architecture and has a swing-based client. On the server side messaging technology and realized as Enterprise JavaBeans services are used. - The Bavarian Travel Expenses System (BayRKS) that supports the 300 clerk of central clearing houses of the State Office of Finance in setting expense claim is newly developed and is to be put into production in 2018. BayRKS will use a client-server architecture with a JavaFX client. Further details are yet to be determined. The State Office of Finance, Department Regensburg grants employees three Java developers. The Java developer working as part of the development team in the development process. They should implement requirements and change requests of a technical character independently, as well as advisory and possibly involved responsible for technical issues. Also include necessary technical concepts and documentation for task field. Participation in the development team requires the personal presence of the Java developers at least four working days per week in Regensburg.

Engineering services

Katholische Jugendfürsorge der Diözese Regensburg e. V. | Published January 10, 2017
Winner
Ingenieurbüro Brundobler GmbH
cpvs
71300000, 71320000

Restoration existing school building school building New education center in St. Wolfgang Regensburger Straße 66, 94315 Straubing.

It is planned to the existing school building for children who are mentally impaired or threatened with intellectual disabilities to renovate. In Straubing in the Regensburger Str.

The building is a Grade II listed neo-baroque building with castle-like three-storey building and H-shaped ground plan with mansard hipped roof from the year 1903rd

The restoration (approximately 8,870,000 EUR gross) includes:

including the improvement of thermal protection by replacement of windows. Thermal insulation of the window niches and the repair of sun protection,

The renovation of the sanitary facilities and all pipes of the building,

The preparation of a Computer cabling throughout the building.

The new building (about 5.59 million EUR gross) includes:

There is a disabled building with approximately 2200 m² of floor space required for the vocational school level.

Work phases 1 to 9 Technical equipment gem. § 53 HOAI ff for.:

Investment Group 4 power installations;

Investment group 5 communication and information technology equipment.

Details on the offer:

Phases 1-9 gem. HOAI 2013; Gradual commissioning. The client reserves the right to further project stages - completely or partially - to entrust to existence of financial security and the positive decision of its decision-making bodies. A legal claim on assignment with the other stages of the project and the overall assignment does not exist.

Architectural and related services

Katholische Jugendfürsorge der Diözese Regensburg e. V. | Published January 10, 2017
Winner
Lex Kerfers Landschaftsarchitekten
cpvs
71200000, 71240000

Restoration existing school building with Schoolhouse New educational center St. Wolfgang in Regensburg

Straße 66, 94315 Straubing.

It is planned, the existing school buildings for children, the mentally impaired or mentally

Disability are threatened to renovate. In Straubing in the Regensburger Str.

The building is a Grade II listed neo-baroque building with castle-like

three-storey building and H-shaped ground plan with mansard hipped roof from the year 1903rd

The restoration (approximately 8,870,000 EUR gross) includes:

including the improvement of thermal protection by replacement of windows. thermal insulation

Window niches and the repair of sun protection,

The renovation of the sanitary facilities and all pipes of the building,

The preparation of a Computer cabling throughout the building.

The new building (about 5.59 million EUR gross) includes:

There is a disabled building with approximately 2 200 meters 2 Of floor space required for the vocational school level.

Work phases 1 to 9 free plant design gem. § 38 HOAI ff.

The roughly estimated total volume of construction work (KGR 200-600) amounts to 14.45 million EUR

gross. The cost limit is in the course of LP3, with creation of cost calculation, determined

and applies to approval by the client.

Details on the offer:

Phases 1-9 gem. HOAI 2013; Gradual commissioning. The client reserves the right to

further project stages - completely or partially - after presentation of financial security and the positive

to instruct its decision-making bodies. A legal claim on assignment with the

further project stages and the overall assignment does not exist.

  • 1