Public tenders for financial in Doksy Czech Republic

Find all Financial tenders in the world.
Finding business opportunities has never been easier.

Results for financial. Make a new search!

Reconstruction and repair of local roads city Doksy

Město Doksy | Published November 26, 2015
cpvs

Individual contracts will be awarded on the basis of sub-contracts for work that can and will be according to the needs of the contracting authority concluded work on a very small volume. (2) The subject of the tender is also providing expert technical assistance, including the possible preparation of necessary project documentation and ensuring synergy and in providing engineering services related to the extent and in the field of public procurement. (3) The contracting authority split the contract into 2 parts (a) Part 1 - Repair and maintenance of roads and roads with bituminous cover (b) Part 2 - Repair and maintenance of roads and roads with paved surface with: (c) The scope of the performance of individual parts of a public contract It is specified in Annex 3 (Specifications) and Annex 4 (Terms and Conditions). Individual contracts will be awarded on the basis of sub-contracts for work that can and will be according to the needs of the contracting authority concluded work on a very small volume. (2) The subject of the tender is also providing expert technical assistance, including the possible preparation of necessary project documentation and ensuring synergy and in providing engineering services related to the extent and in the field of public procurement. Individual contracts will be awarded on the basis of sub-contracts for work that can and will be according to the needs of the contracting authority concluded work on a very small volume. (2) The subject of the tender is also providing expert technical assistance, including the possible preparation of necessary project documentation and ensuring synergy and in providing engineering services related to the extent and in the field of public procurement. (1) The Contracting Authority requires that the applicant did not ensure these subcontracted part of the public tender: (a) earthworks (b) underlayer areas and roads (c) paved, respectively. Covering asphalt pavements and roads (according to Section procurement) (d) mounting curbs (e) work on drainage (f) operation of permanent emergency services. 320/2001 Coll., On financial control in public administration and amending certain laws, as amended. The tenderer undertakes to respect and comply with all obligations arising from this fact. If the applicant shall submit its insurance contract is already in its offer, it will be signing the contract has been seen as presented (4) the place of performance will not take place on time, place of performance not publicly accessible. (1) The Contracting Authority requires that the applicant did not ensure these subcontracted part of the public tender: (a) earthworks (b) underlayer areas and roads (c) paved, respectively. Covering asphalt pavements and roads (according to Section procurement) (d) mounting curbs (e) work on drainage (f) operation of permanent emergency services. (1) The Contracting Authority requires that the applicant did not ensure these subcontracted part of the public tender: (a) earthworks (b) underlayer areas and roads (c) paved, respectively. Covering asphalt pavements and roads (according to Section procurement) (d) mounting curbs (e) work on drainage
  • 1