Call +44 800 9755 164

Public tenders for financial in Chomutov Czech Republic

Find all Financial tenders in the world.
Finding business opportunities has never been easier.

Results for financial. Make a new search!

Financial and insurance services

Statutární město Chomutov | Published July 7, 2016
cpvs
66000000, 66515200, 66515411, 66514110, 66515000

Property and liability insurance for injury Statutory town of Chomutov.

RIP 06/2013 - Velkošenovský p. In the Big Šenov (0.930 to 1.730)

Povodí Ohře, státní podnik | Published November 27, 2014  -  Deadline June 30, 2016
cpvs
45246000

This is a reconstruction of the flow based on damage from flood flows June 2013. Originally it was fortified in the riverbed dry walling at an average height of 1m. The aim is the reconstruction and capacity streambed taking into account the local situation and fortifications proposal so that it respects the current requirements for fortification channels. The purpose of the building is flood damage and associated protection of surrounding properties and land. In the case of leaving the structure without the intervention threatens to increase the extent of damage retaining walls. As a result of the increasing threat to the surrounding structures also threatens to increase financial cost adjustments. The offer will be financed by the Ministry of Agriculture: 129270 "Removing the effects of floods on state water management assets II"

RIP 06/2013 - Okrouhlický p. Skalici in (0.360 to 1.250)

Povodí Ohře, státní podnik | Published November 27, 2014  -  Deadline June 30, 2016
cpvs
45246000

It is a stretch in the urban village vitriol, when during a flood in 2013 (promulgated 2.SPA) damage to the trough (gullies, landslides banks), as well as construction of walls and bottom, thus worsening techn. state fortification that can be assessed in many places, such as emergency - collapse, potholes, damage DNA bases. The aim is to reconstruct the damaged walls, bottom and stabilizing elements (sills, steps) and of the slope (stoves. Rockfill, stone backfill, ensuring the foot of the slope) within a given period. Taking into account the local situation is a technical solution to the construction of fortifications designed to respect the current requirements for fortification channels. The purpose of the building is flood damage and associated protection of surrounding properties and land. In the case of leaving the structure without the intervention threatens to increase the extent of damage retaining walls. As a result of the increasing threat to the surrounding structures also threatens to increase financial cost adjustments. The offer will be financed by the Ministry of Agriculture: 129270 "Removing the effects of floods on state water management assets II"

RIP 06/2013 - Libchavský p. Volfartice in (3.500 to 6.300)

Povodí Ohře, státní podnik | Published November 27, 2014  -  Deadline June 30, 2016
cpvs
45246000

VZ is the subject of the reconstruction of the flow in the urban village Volfartice when during a flood 06/2013 (declared 3.SPA) damage to the riverbed especially construction of walls and bottom, thus worsening techn. state fortification that can be assessed in many places, such as emergency - collapse, potholes, damage DNA bases. . Originally, it was fortified in the riverbed dry walling at an average height of 1m. Taking into account the local situation is a technical solution to the construction of fortifications designed to respect the current requirements for fortification channels. The purpose of the building is flood damage and associated protection of surrounding properties and land. In the case of leaving the structure without the intervention threatens to increase the extent of damage retaining walls. As a result of the increasing threat to the surrounding structures also threatens to increase financial cost adjustments. The offer will be financed by the Ministry of Agriculture: 129270 "Removing the effects of floods on state water management assets II"

RIP 06/2013 - Velkošenovský stream in the Great Šenov river km 0.930 to 1.730

Povodí Ohře, státní podnik | Published February 27, 2015
cpvs

This is a reconstruction of the fortifications banks and bottoms to ensure the stability of the watercourse channel ranked Big Šenova. The construction is divided into six sections, which divide from each other by bridges (U1 to U6). The building is divided into four buildings: SO 1 Stabilization bottom (wooden cross passports, passports cross brick, stone rockfill); SO 2 bank stabilization (rockfill stone, stone masonry dry stone masonry on MC, wing concrete bridges, stone steps); Felling SO 3 - is not covered by the contract (to be felled already); SO 4 Replacement planting. Part of the course is to complement the performance of a flood emergency plan of the building with respect to the use of mechanization and technology, workflow and its approval by the management body and the basins of Eger sp, ensuring the necessary legislation until the start of construction work processing procedure detailed schedule of work, which will be approved by the Client before work starting treatment plan OSH, protocol tracing utilities, documentation of actual construction, in duplicate, including geodetic measurements. Building construction deadline is 13 months, including technology breaks (increased flow rates in winter). No later than August 31, 2015 will be carried out and completed construction work with minimal financial volume of 40% of the total price of the work. No later than November 30, 2015 will be carried out and completed construction work with minimal financial volume of 80% of the total price of the work. The offer is co-funded grant program 129 270 "Removing the effects of floods on state water management assets II" subroutine 129 272 "the aftermath of the floods of 2013".

Removal and disposal or recovery of mixed municipal waste in 2015

Technické služby města Chomutova, příspěvková organizace | Published February 26, 2015
cpvs
90500000

Services related to waste disposal and waste - disposal of solid municipal waste, disposal of household waste, waste collection, select the organization that will provide removal and disposal or recovery of mixed municipal waste and bulky waste shromažďovaného technical services to the town of Chomutov reloading Waste Management of Chomutov. 1) a description needs to be the fulfillment of public contracts fulfilled: Acquisition and disposal of mixed municipal waste and bulky shromažďovaného technical services center Chomutova modified pressing, stamping deposited in containers. Lowering the financial burden of the current practices of municipal waste disposal. 2) a description of the subject contract (contracting authority will briefly describe the subject of procurement) Removal and disposal or recovery of mixed municipal waste and bulky 3) a description of the relationship between the subject contract and the client's needs - Without implementation of public procurement "The acquisition and disposal of municipal waste" can not be achieved goals, ie. removal and disposal of waste while reducing cost of existing municipal waste disposal. 4) the expected due date for the procurement of signing the contract for a fixed term of three years - assuming 8/2015 - 8/2018

RIP 06/2013 - Kamenice in Czech Kamenici (21.840 to 22.350)

Povodí Ohře, státní podnik | Published November 27, 2014  -  Deadline June 30, 2016
cpvs
45246000

The contract is for the reconstruction of masonry Kamenici in the conservation area town Czech Kamenice damaged by flood flows 06/2013. In the pet section was violated statics of the supporting walls. Masonry is now in disrepair - fault obkladního walls, bulging walls, sometimes occurring depressions behind the wall. In the section No.1 is a sandstone masonry damaged after the flood, section # 2 is a basaltic masonry disturbed in the base. Division No.3 disturbed statics masonry length of 360 m double sided. The section no. 4 lacks stabilization bottom. Due to the age structure of the supporting walls, which are close to 100 years, we expect a growing range of individual failures in the near future. The aim is to reconstruct the streambed taking into account the local situation and fortifications proposal so that it respects the current requirements for fortification channels. The purpose of the building is flood damage and associated protection of surrounding properties and land. In the case of leaving the structure without the intervention threatens to increase the extent of damage retaining walls. As a result of the increasing threat to the surrounding structures also threatens to increase financial cost adjustments. The offer will be financed by the Ministry of Agriculture: 129270 "Removing the effects of floods on state water management assets II"
  • 1