Public tenders for financial in Cesky-brod Czech Republic

Find all Financial tenders in the world.
Finding business opportunities has never been easier.

Results for financial. Make a new search!

The tender for the supply of automated production lines for machining small parts for the company KUMMER Ltd.

KUMMER s.r.o. | Published July 27, 2016
cpvs

The contract is the delivery of automated production lines for machining small parts for KUMMER Ltd. company profile link authority: https://kummer.profilzadavatele.cz/ Sponsor does not allow partial performance. This is not a procurement procedure under the Act no. 137/2006 Coll., As amended. According to § 2 e) of the Act no. 320/2001 Coll., On financial control in public administration, the selected supplier is obliged to cooperate in the performance of financial control. The Company reserves the right to cancel the tender. Bids will be passed in the Czech language. This is an over-limit tender pursuant PpVD.

A tender to supply injection molds for the latch and trays for interlocking system

SuJuk, spol. s r. o. | Published October 20, 2015
cpvs

The delivery is injection mold with shaped plates into the mold so that it can be compressed, one or the other component separately. More information is included in the tender documentation. A link to the profile of the contracting authority, where is located the tender documentation: https://sujuk.profilzadavatele.cz/ Sponsor does not allow partial performance. This is not a procurement procedure under the Act no. 137/2006 Coll., As amended. According to § 2 e) of the Act no. 320/2001 Coll., On financial control in public administration, the selected supplier is obliged to cooperate in the performance of financial control.

Production innovation company SolarCat Machinery Ltd.

SOLARCO Machinery, s.r.o. | Published June 23, 2016
cpvs

The contract is the delivery of equipment and in various stages: • IA) CNC lathe • IB) CNC turret lathe • II. CNC turret lathe • III. CNC gantry Center • IV. CNC gantry Centre This is one custom menus are served on a whole, the estimated value of the entire contract is 40,000,000 CZK. Alternative solutions sponsor does not allow. Individual deliveries of machines (technology) will be supplied according to the client's requirements in accordance with the terms and conditions. This is not a procurement procedure under the Act no. 137/2006 Coll., As amended. According to § 2 e) of the Act no. 320/2001 Coll., On financial control in public administration, as amended, the selected contractor is obliged to cooperate in the performance of financial control.

Refurbishment and extension of technically unsatisfactory Company property DETESK

Detesk s.r.o. | Published August 29, 2016
cpvs

The contract is the reconstruction and extension of technically unsatisfactory Company property Detesk Ltd. in Zelezny Brod, Industrial 702, Zelezny Brod, which includes reconstruction of the existing main building, the reconstruction of a new building in the courtyard to complement the complex ancillary workshops and factories, demolish the building oxygen stations and stair block, modification of hard surfaces and construction fencing. Part of the object of the contract is to provide a final occupancy permit. Moreover, given the fact that the contracting authority intends to finance the construction works of OPPIK it is part of the subject matter and securing elements obligatory publicity (billboard, plaque). This is not a procurement procedure under the Act no. 137/2006 Coll., On public procurement. According to § 2 e) of the Act no. 320/2001 Coll., On financial control in public administration, as amended, the selected contractor is obliged to cooperate in the performance of financial control.

composting HB

Josef Jiráček | Published August 19, 2016
cpvs

The subject of the public tender is for the supply of machinery equipment kompostárny.1. traktor2. překopávač3. Chipper Given the limited financial resources, which the contracting authority has available to cover the subject contract, the contracting entity shall award the condition that the bid price which the contracting authority will have to actually pay for the public contract may not exceed the estimated value of public contracts specified in the tender documents and in the notice of initiation of the procurement procedure, since the contracting authority would such a price has not been able to pay. Candidates are obliged to meet specifications.

Water supply Květinov - 3rd stage, sewerage and sewage treatment plant Květinov - 3rd and 4th stage

Obec Květinov | Published June 5, 2015
cpvs

The subject of the works is the construction of new water and sewer mains, and construction of the wastewater treatment plant (WWTP), including plumbing fixtures, electrical connections and transport connectivity wastewater treatment plant in the village Květinov. Prior information notice is published under registration number 511,334th on the contract in question was filed application for state financial support. The village Květinov in the implementation of this contract follows the instructions of the Ministry of Agriculture. Submitter limited degree of subcontracting. Details are given in the tender documents published on the profile of the submitter.

Water supply Květinov - Phase 3 Sewer and WWTP Květinov - 3rd and 4th stage

Obec Květinov | Published April 10, 2015  -  Deadline June 30, 2016
cpvs
45231300

The subject of the works is the construction of new water and sewer mains, and construction of a sewage treatment plant in the village Květinov. The project is to be realized due to the total absence of the infrastructure. The project will be completely resolved in the village supply of quality drinking water, the total village sewer system and wastewater treatment. On the contract in question was filed application for state financial support. The village Květinov in the implementation of this contract follows the instructions of the Ministry of Agriculture.

Supply of electricity enamelling furnaces

Karma Český Brod a.s. | Published October 30, 2015
cpvs

Object of the contract includes the supply enamelling furnaces including electrical installation, testing, operator training. Details are given in the tender documents published on the contracting entity profile https://www.profilzadavatele.cz/profil-zadavatele/karma-cesky-brod-a-s_3390/. This is not a procurement procedure under the Act no. 137/2006 Coll. Possible use similar concepts, which says the law does not mean that the grantor some of the procurement procedures set out in the Act. The sponsor states that this contract is to be co-financed from public funds provided under Operational Programme Enterprise and Innovation for Competitiveness (OPPIK). With this in mind, it is necessary to realize this tender based on the rules for applicants and recipients of grants from OPPIK in the current version and the Rules for the selection of suppliers in the version in force at the date of publication, ie. The date of dispatch of the notice of initiation of the tender for the Bulletin of public contracts. According to § 2 e) of the Act no. 320/2001 Coll. on financial control in public administration, as amended, the selected contractor is obliged to cooperate in the performance of financial control.

Consolidation of IT infrastructure and new services TC ORP Uherský Brod

Město Uherský Brod | Published March 16, 2015
cpvs

1 Specifications. The contract is in all parts (partial fulfillment) consists of investment in the acquisition (purchase of goods) the price of the work and subsequent technical support (service) for 60 months of the service agreement. Virtualization platform itself will guarantee uniformity environment for users working remotely. The delivery is the delivery of hardware and software virtualization 100 end PC, as well as migration of user profiles and data to a server environment. The required performance consists of the following components: Priority from the perspective of security and availability solutions mainly: • Create a cluster L3 switches, connection elements Technology Centre and Network MAN-UB into a single cluster • Creating firewall cluster with IPS and IDS detection and collecting logs • Proxy server and antivirus solutions DMS will provide distribution and notification documents and their long-term storage not only for electronic financial control, but it will serve as an integration process support for additional office computerization process. All information is downloaded from the contracting entity profile. ZD ZD see see see ZD

Restoration of cultural heritage Manor House in Brod

Město Uherský Brod | Published November 13, 2014
cpvs

29367 / 7-3512. Another subject of the CPV codes by CPV: 42416100-6, 45421100-5, 39132400-0, 45321000-3, 45261420-4. XVII. Tender documentation). The principal determines the following specifications: Bank guarantee will cover the financial requirements of the contracting authority for the selected bidder which he incurred for breach of his obligations under the contract for work or operation of law in the course of the warranty period of the successful tenderer fails even after prior written notice of the contracting authority. The sponsor provides the condition that the bank guarantee must be irrevocable, unconditional, payable on the first request of the contracting authority and without the bank examined the reasons for the drawing. (It must be stated in the statutory declaration). Submitter hereby determines the binding condition that the amount of bank guarantee offered by the Contractor shall be 1 200 000, - CZK. In this case the supplier table in the appropriate boxes on the dash or blank. The table must be dated, stamped (if applicable uses stamp) and signed by the candidate - a person authorized to act on behalf of the applicant. d) request the production of color photographs or brochures A4 structures of a similar nature that the contractor submitted as part of compliance with technical qualifications. The Client requires proof of compliance with professional qualifications in accordance with the provisions of § 54 letter. b) and d) of the Act: § 54 letter. b) Act, proof of authorization to do business under special laws to the extent that the subject contract, namely proof of relevant trade authorization or license. Contractor shall demonstrate compliance with this professional qualification by submitting a simple copy of the business license for the subject of the public contract. § 54 letter. d) of the Act document certifying the competence of the supplier or the person through whom the competence ensures that if for the public contract necessary under special legislation. Contractor as proof of its competence to submit: 360/1992 Coll., On the profession of authorized architects and the profession of authorized engineers and technicians active in construction as amended for the study "building construction". b) The license of the Ministry of Culture for the restoration of stone and wall paintings. 200/1994 Coll., Contractor or person through whom the professional activity ensures it is necessary to carry out public contracts necessary (Geodesic activities). 1 of the Act in copies. Technical capacity: 3 point. b) and c) of the Act must key expert - Team leader (the site manager) meet the min. the following conditions: • University education building direction - evidence of highest education submit a copy to 360/1992 Coll. amended for the field - Civil engineering - submit the copy • At least 7 years experience as a site engineer 15 miles CZK without VAT. Contractor joins in the original CV, which must be prepared at least in the structure below, and signed by the team leader: a) name and surname, permanent residence, b) Qualifications, c) membership in professional organizations, d) other knowledge and skills, e) currently espoused function (position at the supplier), f) the length of employment with the contractor, g) the most important reference contract stating the budgetary cost of construction, h) professional experience, i) other relevant information, j) the personal signature of the person responsible for the provision of services - team leader. Documents received in the previous paragraph, which will illustrate below meet defined levels of qualification requirements. If the grant is not awarded, or the amount of the grant will be withheld, the sponsor will be the subject of a public contract to implement. The applicant is required in the proposed method works comply with the following milestones: Restoration of the roof - up to 4 months of a construction site. Restoration of the facade - within 7 months of a construction site. Candidates will be required to design and put in the proposal and contract work in progress schedule dates of milestones in its sole discretion, but to respect the requirements of the client above.
  • 1