Call +44 800 9755 164

Public tenders for environment in Slovakia

Find all Environment tenders in the world.
Finding business opportunities has never been easier.

Results for environment. Make a new search!
EnvironmentSlovakia

Disconnecting and securing the pillar cabinets, plastic into the environment

Úrad pre verejné obstarávanie | Published December 9, 2016  -  Deadline September 1, 2017
NC and securing cabinets plastic into the environment (the pillar according to DIN). Cabinets designed to fuse and disconnection of cable distribution networks with voltage not exceeding 1000V.

Monitoring the impact of construction of the D1 motorway Fričovce - Svinia on the environment (water, noise, air pollutants, biota).

VODNÉ ZDROJE SLOVAKIA, s.r.o. | Published December 9, 2016  -  Deadline September 1, 2017

"Collection, transport and disposal of municipal waste in the environs of the village Studienka"

Obec Studienka | Published November 17, 2016  -  Deadline December 2, 2016
A) the collection, transport and disposal (recovery) mixed municipal waste from plastic bins 120 l, 240 1100 lb) import Contractor to the Customer in the municipality Studienka empty VKK 7 m3, bulk waste and garbage from the municipality Studienka filled VKK 7 m3 for disposal (appreciation). The next derives bring back empty VKK. VKK 7 m3 are the property of the contracting authority.

Modernization and expansion modules functionalities of Central Registry of publications II (CRPA II), which are necessary to start the pilot operation

SVOP, spol. s r.o. | Published December 9, 2016  -  Deadline September 1, 2017
Subjects directly negotiated procedure is modernization and expansion modules functionalities of Central Registry of publications II, necessary to start pilot operation. The introduction of the pilot need to deploy structures: the administration department of the user data structure state records, details search and faceted navigation, outputs and notification, copying records, the rights of users, parameter optimization, creating a production environment, the environment for training, verification environment, re-conversion data management and support for administration of classifiers and supporting entities. Substantial qualitative changes resulting from the modernization of the transition from batch data collection to an online centralized the lot database with a specific user interface and the possibility of linking and downloading data, providing support tools for quality evaluation of publication outputs, project preparation, for calculating state subsidies to public universities in Slovakia.

"Energy saving school building VB Nedožerského Prievidza"

EkoAuris, s.r.o. | Published December 9, 2016  -  Deadline January 3, 2017
The contract is "Energy saving school building VB Nedožerského, Prievidza" because of the increased demands on the filling of building openings (school environment, health and safety of children, long-term faultless functionality of windows and doors) and maximum energy savings.

The supply, modification and adaptation of specific modules and their implementation into the OTB and services related to the preparation and carrying out security exercises CAX

LYNX - spoločnosť s ručením obmedzeným Košice | Published November 15, 2016
Service Delivery, an adaptation of specific modules and their implementation into the OTB and services associated with the preparation and implementation of security exercises, supported by computer technology (CAX) units and task force in the use of constructive and virtual simulation. Delivered modules for performing CAX shall conform to the requirements of exercising units SR OS and carried out analysis of implementation parameters for units simulation environment OTB and subsequently incorporated into the planned scenario of the exercise in an environment of constructive and virtual simulation. Will be providing technical support for CAX exercises and case requirements will be refined and finalized and additional expansion modules OTB simulation tool and updated respectively. created maps. The entire brief description is - https://www.uvo.gov.sk/private/profily/detail/9012/zakazky/404303/dokumenty/detail/737197?page=1&limit=20&sort=idPDokument&sort-dir=DESC&ext=0

Maintenance and repair of data network equipment

Sociálna poisťovňa, ústredie | Published November 30, 2016  -  Deadline December 12, 2016

The contract is authorized after-sales service network security devices to protect the external perimeter operating at the headquarters of the Social Insurance through the provision of required maintenance services, related to the supply of consumables, spare parts and execution of consolidation environment.

A detailed description of the subject of the contract is set out in Part B.1 specifications.

Maintenance and repair of data network equipment

Sociálna poisťovňa, ústredie | Published December 6, 2016  -  Deadline December 12, 2016

The contract is authorized after-sales service network security devices to protect the external perimeter operating at the headquarters of the Social Insurance through the provision of required maintenance services, related to the supply of consumables, spare parts and execution of consolidation environment.

A detailed description of the subject of the contract is set out in Part B.1 specifications.

Maintenance and repair of data network equipment

Sociálna poisťovňa, ústredie | Published November 22, 2016  -  Deadline December 1, 2016

The contract is authorized after-sales service network security devices to protect the external perimeter operating at the headquarters of the Social Insurance through the provision of required maintenance services, related to the supply of consumables, spare parts and execution of consolidation environment.

A detailed description of the subject of the contract is set out in Part B.1 specifications.

Purchase arrays NAS (Network Attached Storage)

Úrad pre verejné obstarávanie | Published December 7, 2016  -  Deadline January 16, 2017
The contract is the purchase of disk arrays NAS (Network Attached Storage) to provide comprehensive file services within the university setting, for processing multimedia data in a Avid Media Composer, Pro Tools, Avid, Adobe Premiere and Final Cut Pro or Da Vinci Resolve. Disk arrays must be certified and supported for use in the working environment. Disk arrays will be used in three geographically separate locations Bratislava 1, Bratislava and Banska Bystrica 2 with central data management. Detailed specification of the subject matter in the tender documents the object of the contract of B1.Opis.

Brezno Land Use Plan

Mesto Brezno | Published December 8, 2016  -  Deadline December 28, 2016
The contract is the selection of a contractor for the development of spatial planning documentation Brezno Land Use Plan (the UPN - O) in accordance with the Act. 50/1976. on Territorial Planning and Building Code (Building Act), as amended, and the Decree of Ministry of the Environment. 55/2001 Coll. on land-use planning documents and land planning documentation for the full scope of administrative and administrative area, ie cadastral area of ​​the city.

Computer equipment and supplies

Vysoká škola múzických umení v Bratislave | Published December 6, 2016  -  Deadline January 16, 2017

The contract is the purchase of disk arrays NAS (Network Attached Storage) to provide comprehensive file services within the university setting, for processing multimedia data in a Avid Media Composer, Pro Tools, Avid, Adobe Premiere and Final Cut Pro or Da Vinci Resolve.

Disk arrays must be certified and supported for use in the working environment. Disk arrays will be used in three geographically separate locations Bratislava 1, Bratislava and Banska Bystrica 2 with central data management. Detailed specification of the subject matter in the tender documents in section B1. Description of the subject contract.

The required solution will consist of two identical systems disk storage platform. The minimum required capacity of more than 160 TiB usable capacity. See more documents.

Development of projects for construction permit at the construction implementation project: "Reconstruction of the Cultural House Poprad -"

Archstudio, spol. s r.o. | Published November 17, 2016
Changes proposed to change the nature of the object both indoors and outdoors. Changes in the interiors would significantly improve the overall logistics space and streamline the functioning of the entire building. Exterior changes will bring a new quality in the expression object and its relationship to the surrounding environment. Building part A (first layout Changes- entrance foyer and its relationship to space zázemia- increase in capacity terms - a new main entrance, new escape stairs at the east fasáde- disposal of existing external staircase second building- architectural modifications cover the main entrance markízou- new cladding the whole building - new exterior communication core - change the shape of the roof) B Hardware - central vykurovanie- complete indoor installation, including a new boiler, electric - complete construction indoor installation, sanitary - complete indoor installation, ventilation areas selected C outer surfaces (parking arrangement flat- public lighting- drainage area of ​​the parking lot)

Revitalization of the stone mill, III. phase

Mesto Trnava | Published November 29, 2016  -  Deadline December 22, 2016
Range of subject matter is addressed in the project documentation for construction realization revitalization of the Stone Mill at Trnava, III. stage processed atelier Hoffman Landscaping, sro in Trnava 02/2010. Revitalization aims to restore the existing park in The Stone mill increase ekostability environment and create favorable conditions for a short rest and recreation residents of Trnava increasing the aesthetic and environmental values ​​of the area suitable composition of green and supplementing the civil infrastructure build-marked trails, adding furniture, adding dashboards , reconstruction of public lighting, building a wooden deck landings. The order includes: - geodetic survey of the building, implementation of the au- focus and sketches, made professionally qualified surveyors and development plan for the use of public works, - the costs of activities under the plan of construction organization - all other related works and supplies. Subject of the contract comprises the construction objects: -E.1.0 Hard surfaces, communications, landscaping -E.2.0 Landscaping -E.3.0 External power distribution, public lighting -E.4.1 Mobiliár -E.4.2 Rest -GEODETICKÉ WORK

Nature trail Hrebienok

Slovenský zväz ochrancov prírody a krajiny, Základná organizácia Vysoké Tatry | Published November 15, 2016  -  Deadline December 12, 2016
The main objective of the project is to significantly increase the effect of environmental education by building new nature trail in the heart of the Tatra National Park. Pomiestne surface repairs pending trail significantly improve cognitive and educational experience from visiting the trail, without significant disturbance, for example in the form of excessive uneven terrain and obstacles or excessive exposure of flowing water on the surface of the pavement and its viability. For metal bullets length of 4 m 3 In particular, the removal of damaged concrete parts and replacing them with new concrete and requires stocking a new one, with 7 units. District Office, Department of Environment issued Prešov 11. 10. 2016 decision authorizing the relevant exemptions and approvals under the Act. NR SR. 543/2002 Coll. as amended, for the realization of the trail Hrebienok. Especially in the High Tatras are the typical characteristics of ancient glacial activity, and examples of geological structure of the mountain range. In the Smokovce over them and essentially started to develop tourism, particularly tourism walking tours Tatras. For a demonstration of the following aspects should serve a new nature trail with the appropriate icon. Its total length is about 4 km, with very little elevation, manageable and less physically fit visitors. Physically disabled visitors in wheelchairs in the section Hrebienok Rainerova Shelter, however, need to short distances help of another person. Wood panels larch wood will be installed in the bedrock without using heavy equipment almost exclusively manual labor. Due to the cramped sidewalk parameters especially from Rainer's comfortably alongside Cold Creek Waterfalls will also be work carried out mainly manually. It will also be a large range of manual delivery of necessary materials and equipment to the nature of mountain terrain. Given the challenging conditions are expected and well thought out means of transport materials to the site Hrebienok, since there is no possibility of local interim storage in the concerned area.

Railway construction works

Železnice Slovenskej republiky, Bratislava v skrátenej forme „ŽSR“ | Published December 3, 2016

2.1. The contract is the execution of works on site entitled "Modernisation of railway track Žilina - Košice, track section Liptovský Mikuláš - Poprad Tatry (outside), stage 1" (Poprad - Lučivná).

2.2 The purpose of the construction is to modernize the technical infrastructure of tracks on the section concerned, which is part of the TEN-T and European railway corridor. Va parameters to achieve under the legislation of the European Union / European Community (eg. Technical Specifications for Interoperability) European standards, legislation and standards of the Slovak Republic and the AGC and AGTC. The main task is to enable better accessibility to the trans transport network if the neighboring countries. The proposed structure for implementation must comply with the requirements to ensure the interoperability of the European railway system under Act no. 513/2009 Coll. on Railroads and on amendments to certain laws, as amended. ... Given in point II.2.4).

2.3 Modernisation of the present route of the railway network consists of the reconstruction of the existing railway infrastructure in order to increase their technical infrastructure and usability by incorporating the latest and most progressive elements, thereby enhancing and improving its technical parameters and indicators as a whole. Build a modern railway line will increase the comfort and smoothness of driving and thus ultimately reduce the negative effects of transport on the environment, which will be eliminated and other technical measures.

2.4 The building is divided into an integrated part of the building (the "UČS"):

- UČS 401Traťový section Poprad - ON

- UČS 402 Railway station. shine,

- UČS 403 Track section Poprad - Strba.

Individual UČS are divided into operational files and buildings.

Maintenance and repair of computer equipment

Ministerstvo kultúry Slovenskej republiky | Published December 7, 2016

The contract is the provision of services and operations authorized technician, which are associated with regular service digitization facilities Cruse Scanner Museum CS295ST-VR1100, VR1100 and CS155ST-CS130ST-VR530 for the Slovak National Gallery in Bratislava. Under the terms of the manufacturers in the operator manual of the digitization facilities, the implementation of operational activities, ensuring their continuous, trouble-free operation in harsh environments digitization Slovak National Gallery - service according to service schedule and at the same time will be provided what was necessary for the maintenance of the guarantee provided to the devices. Provision of services is required within the mandatory sustainability of the national project of digital albums in 2020 under a contract for the provision of financial assistance from the Structural Funds Operational Programme Information Society (OPIS).

  • 1