Public tenders for sanitation in Tallinn Estonia

Find all Environment tenders in the world.
Finding business opportunities has never been easier.

Results for environment. Make a new search!

Eesti Energia Narva and Auvere- the buildings, facilities, tarands, water, sanitation and repairs carried out sadeveesüsteemide

Eesti Energia Aktsiaselts - Juri Saija | Published January 5, 2016
Winner
BRP Haldus OÜ, 10906871, Aia 2, Jõgeva, 48306 Eesti (EE) Tel.: +372 6740075 URL: www.brphaldus.ee
cpvs
50800000, 50500000, 50230000, 50720000

During the following subjects: 1) Energy NEJ Balti power plant, 2) Eesti Energia NEJ AS Eesti power plant, 3) Eesti Energia Oil Industry AS, 4) Eesti Energia Mines Ltd. Logistics Company Auvere buildings, facilities, tarands, water, sanitation and sadeveesüsteemide repairs Exercise one-off orders.

Eesti Energia Narva and Auvere- the buildings, facilities, tarands, water, sanitation and repairs carried out sadeveesüsteemide

Eesti Energia Aktsiaselts - Juri Saija | Published September 25, 2015  -  Deadline October 15, 2015
cpvs
50800000, 50500000, 50230000, 50720000

During the following subjects: 1) Energy NEJ Balti power plant, 2) Eesti Energia NEJ AS Eesti power plant, 3) Eesti Energia Oil Industry AS, 4) Eesti Energia Mines Ltd. Logistics Company Auvere buildings, facilities, tarands, water, sanitation and sadeveesüsteemide repairs Exercise one-off orders.

Emajõe school sanitation, ventilation and electrical reconstruction

Riigi Kinnisvara Aktsiaselts - KAIRI OSOLAINEN | Published May 17, 2017  -  Deadline May 29, 2017
cpvs
45232400, 45310000, 45331210, 45400000

Emajõe school's ventilation system construction, sewer systems and a strong flow of reconstruction and partial improvements to the premises.

Paldiski road (road Järveotsa - Lake Shore Road) reconstruction

Tallinna Kommunaalamet - REIO VESIALLIK | Published August 31, 2015
Winner
Lemminkäinen Eesti AS, 10114029, Betooni 28, Tallinn, 11415 Eesti (EE) Tel.: +372 55569246
cpvs
45233140

Construction work includes: road construction works like; storm water drainage systems, construction, street lighting, communication, sanitation, electricity lines, and landscaping and traffic management related work.

Paldiski road (road Järveotsa - Lake Shore Road) reconstruction

Tallinna Kommunaalamet - REIO VESIALLIK | Published July 10, 2015  -  Deadline July 21, 2015
cpvs
45233140

Construction work includes: road construction works like; storm water drainage systems, construction, street lighting, communication, sanitation, electricity lines, and landscaping and traffic management related work.

Paldiksi road (road Järveotsa - Lake Shore Road) reconstruction

Tallinna Kommunaalamet - REIO VESIALLIK | Published June 8, 2015
cpvs
45233140

Construction work includes: road construction works like; storm water drainage systems, construction, street lighting, communication, sanitation, electricity lines, and landscaping and traffic management related work.

Paldiski road (road Järveotsa - Lake Shore Road) reconstruction

Tallinna Kommunaalamet - REIO VESIALLIK | Published June 22, 2015  -  Deadline July 16, 2015
cpvs
45233140

Construction work includes: road construction works like; storm water drainage systems, construction, street lighting, communication, sanitation, electricity lines, and landscaping and traffic management related work.

Paldiksi road (road Järveotsa - Lake Shore Road) reconstruction

Tallinna Kommunaalamet - REIO VESIALLIK | Published May 19, 2015  -  Deadline June 5, 2015
cpvs
45233140

Construction work includes: road construction works like; storm water drainage systems, construction, street lighting, communication, sanitation, electricity lines, and landscaping and traffic management related work.

Kopli tram depot repair additional works

Tallinna Linnatranspordi Aktsiaselts - Johannes Ploom | Published September 28, 2016
Winner
Eqvi OÜ, 11920382, Salve 4, Tallinn, 11612 Eesti (EE) Tel.: +372 55686707
cpvs
45232450, 45231300

Present the works carried out under the previous contract procurement "Kopli 118 tram depot repair design and build approach ', under reference number 172 553, awarded the contract to not contained in the procurement indispensable to achieve the objective of further work: soil drainage and urban sanitation Signup

Sagadi ice cellar, emergency repairs and reconstruction of the garden

Riigimetsa Majandamise Keskus (RMK) - Reelika Sirge | Published May 22, 2015
Winner
AKTSIASELTS EVIKO, 10321432, Õpetaja 9 A, Tartu, 51003 Eesti (EE) Tel.: +372 7306050
cpvs
45210000

Sagadi ice cellar and garden reconstruction work includes demolition work, corresponding to the function of the building construction works carried out in the heating and ventilation works, sanitation and water works, electrical work, interior decoration and furniture procurement and installation, maintenance, and drainage works.

The parish päästekomando garage floor repair and installation works necessary for washing machines

Riigi Kinnisvara Aktsiaselts - KAIRI OSOLAINEN | Published July 9, 2015
Winner
POSTIPOISI OÜ, 12002731, Jaama 26, Türi, Türi, Järvamaa, 72212 Eesti (EE) Tel.: +372 58515045
cpvs
45262321, 45231300, 45310000

The parish päästekomando related to the renovation of the garage floor construction and engineering work. During the renovation break with the old floors and replaced by a new suitable hõõrdekindla epopõrandaga. Works that accompany the rescue services to install an industrial washing machine and dryer. Ventilating, water supply and sanitation and elektriliitumiste deployment of equipment installation. Pallet construction of washing machines and kuivatuskappide stable mounting and fixing.

The parish päästekomando garage floor repair and installation works necessary for washing machines

Riigi Kinnisvara Aktsiaselts - KAIRI OSOLAINEN | Published June 16, 2015  -  Deadline June 29, 2015
cpvs
45262321, 45231300, 45310000

The parish päästekomando related to the renovation of the garage floor construction and engineering work. During the renovation break with the old floors and replaced by a new suitable hõõrdekindla epopõrandaga. Works that accompany the rescue services to install an industrial washing machine and dryer. Ventilating, water supply and sanitation and elektriliitumiste deployment of equipment installation. Pallet construction of washing machines and kuivatuskappide stable mounting and fixing.

NGO student dormitory project for the renovation of the main

Mittetulundusühing Dormitorium - Marek Ploompuu | Published January 12, 2016  -  Deadline January 21, 2016
cpvs
71240000

The work consists in: • Demolition; • basic architectural design; • Special Parts key projects including: o strong current: the whole house shields backbone trunk, I and II floor o nõrkvool: CCTV cables corridors Wifi preparedness o ATS and security lighting: security lighting throughout the house, ATS I and II deck of Changing o Ventilation: natural ventilation Expert assessment of proposals for natural ventilation maintenance, I - IV floors in the corridors o Sudnventilatsioon be designed the main project level hallways and kitchens, the evidence is that the project has forced ventilation in damp rooms available. Railway Designed forced ventilation, kitchens and hallways must take into account the existing project. o Water and sanitation: water mains and püstakud remain available; Motorways are designed for circulating water if necessary; designed the entire house sewer püstakud; new bathrooms and kitchens (I - IV floor) designed for water and sanitation; designed fire water system. o heating (heating current project linking compiled main project)

Västriku 8 (Tallinn) dormitory renovation work on the basic design of the project volume

Mittetulundusühing Dormitorium - Marek Ploompuu | Published January 12, 2016
cpvs
71240000

The work consists in: • Demolition; • basic architectural design; • Special Parts key projects including: o strong current: the whole house shields backbone trunk, I and II floor o nõrkvool: CCTV cables corridors Wifi preparedness o ATS and security lighting: security lighting throughout the house, ATS I and II deck of Changing o Ventilation: natural ventilation Expert assessment of proposals for natural ventilation maintenance, I - IV floors in the corridors o Sudnventilatsioon be designed the main project level hallways and kitchens, the evidence is that the project has forced ventilation in damp rooms available. Railway Designed forced ventilation, kitchens and hallways must take into account the existing project. o Water and sanitation: water mains and püstakud remain available; Motorways are designed for circulating water if necessary; designed the entire house sewer püstakud; new bathrooms and kitchens (I - IV floor) designed for water and sanitation; designed fire water system. o heating (heating current project linking compiled main project)

NGO student dormitory renovation project for the main

Mittetulundusühing Dormitorium - Marek Ploompuu | Published March 18, 2016
Winner
Osaühing SIRKEL&MALL, 11124774, Laki tn 5, Tallinn, 10621 Eesti (EE) Tel.: +372 56841599
cpvs
71240000

The work consists in: • Demolition; • basic architectural design; • Special Parts key projects including: o a strong current: the whole house shields backbone trunk, I and II floor o weak stream: video surveillance cables corridors Wifi preparedness o ATS and security lighting: security lighting throughout the house, ATS I and II deck of Change o Ventilation: natural ventilation expert assessment of proposals for natural ventilation maintenance, I - IV floors in the corridors o Sudnventilatsioon the basic design of the project-level hallways and kitchens, the evidence is that in damp rooms forced ventilation project is available. Railway Designed forced ventilation in kitchens and hallways must take into account the existing project. o Water and sanitation: water mains and püstakud remain available; if necessary, designed for circulating water mains; by designing entire house sewer püstakud; new bathrooms and kitchens (I - IV floor) designed for water and sanitation; designed for fire fighting water system. o heating (heating current project linking compiled for the main project)

Västriku 8 (Tallinn) dormitory renovation work on the basic design of the project volume

Mittetulundusühing Dormitorium - Marek Ploompuu | Published December 1, 2015  -  Deadline December 9, 2015
cpvs
71240000

The work consists in: • Demolition; • basic architectural design; • Special Parts key projects including: o strong current: the whole house shields backbone trunk, I and II floor o nõrkvool: CCTV cables corridors Wifi preparedness o ATS and security lighting: security lighting throughout the house, ATS I and II deck of Changing o Ventilation: natural ventilation Expert assessment of proposals for natural ventilation maintenance, I - IV floors in the corridors o Sudnventilatsioon be designed the main project level hallways and kitchens, the evidence is that the project has forced ventilation in damp rooms available. Railway Designed forced ventilation, kitchens and hallways must take into account the existing project. o Water and sanitation: water mains and püstakud remain available; Motorways are designed for circulating water if necessary; designed the entire house sewer püstakud; new bathrooms and kitchens (I - IV floor) designed for water and sanitation; designed fire water system. o heating (heating current project linking compiled main project)

Dormitory Västriku 8 tn reconstruction

Mittetulundusühing Dormitorium - Meelis Hõbemägi | Published March 15, 2017
Winner
Ehitus5ECO OÜ, 11715995, Mustamäe tee 4, Tallinn, 10621 Eesti (EE) Tel.: +372 5127800
cpvs
45212410

The object of this procurement is a street in Tallinn Västriku 8 a dormitory reconstruction. During reconstruction, the project is not implemented in full. Works in the organization must be taken into account that the building III, IV and V of the ground floor accommodation will continue operating. During the building phase to ensure the safety of student users, and asset preservation. All necessary works during the breaks in advance (at least three days' notice) to agree with the client. Construction work to replace a whole building heating systems and scaled a natural extension mechanism. Heat recovery ventilation system is installed in the communal kitchen and bathrooms (I, II, III and IV floor). Perform the necessary demolition. Construct a second entrance to the building. Tuleohutuspaigaldis modernized. Would be built around water and sanitation to the basement, first and second floor and the third and fourth floor ühisköökides and shower areas. A more detailed description of works, and the volume of the contract in the technical specifications and the value of the tender forms

Dormitory Västriku 8 tn reconstruction

Mittetulundusühing Dormitorium - Meelis Hõbemägi | Published January 16, 2017  -  Deadline February 10, 2017
cpvs
45212410

The object of this procurement is a street in Tallinn Västriku 8 a dormitory reconstruction. During reconstruction, the project is not implemented in full. Works in the organization must be taken into account that the building III, IV and V of the ground floor accommodation will continue operating. During the building phase to ensure the safety of student users, and asset preservation. All necessary works during the breaks in advance (at least three days' notice) to agree with the client. Construction work to replace a whole building heating systems and scaled a natural extension mechanism. Heat recovery ventilation system is installed in the communal kitchen and bathrooms (I, II, III and IV floor). Perform the necessary demolition. Construct a second entrance to the building. Tuleohutuspaigaldis modernized. Would be built around water and sanitation to the basement, first and second floor and the third and fourth floor ühisköökides and shower areas. A more detailed description of works, and the volume of the contract in the technical specifications and the value of the tender forms

Västriku 8 (Tallinn) dormitory renovation design work. Key Project

Mittetulundusühing Dormitorium - Marek Ploompuu | Published October 28, 2015  -  Deadline November 9, 2015
cpvs
71240000

The work consists in: • demolition; • The architectural core of the project; • Special Parts of the main project, including: o The strong current: the whole house shields backbone trunk, I and II floor o nõrkvool: CCTV cables corridors Wifi preparedness o ATS and security lighting: security lighting throughout the house, ATS I and II deck of Changing o Ventilation: natural ventilation trimming (I - IV floors of corridors, forced ventilation in kitchens, damp rooms (project there, a project linking the rest of the ventilation system) o Water and sanitation: water püstakud and mains are available, if necessary, be designed with water Motorways of the circulation, designed for the whole house sewer püstakud, new bathrooms and kitchens (I - IV floor) designed for water and sewerage, fire water system designed o heating (heating current project linking compiled basic design) process.

Västriku 8 (Tallinn) dormitory renovation design work. Key Project

Mittetulundusühing Dormitorium - Marek Ploompuu | Published November 6, 2015  -  Deadline November 11, 2015
cpvs
71240000

The work consists in: • demolition; • The architectural core of the project; • Special Parts of the main project, including: o The strong current: the whole house shields backbone trunk, I and II floor o nõrkvool: CCTV cables corridors Wifi preparedness o ATS and security lighting: security lighting throughout the house, ATS I and II deck of Changing o Ventilation: natural ventilation trimming (I - IV floors of corridors, forced ventilation in kitchens, damp rooms (project there, a project linking the rest of the ventilation system) o Water and sanitation: water püstakud and mains are available, if necessary, be designed with water Motorways of the circulation, designed for the whole house sewer püstakud, new bathrooms and kitchens (I - IV floor) designed for water and sewerage, fire water system designed o heating (heating current project linking compiled basic design) process.