Gmina Stare Miasto | Published December 8, 2015
Winner
Zakład Oczyszczania Terenu BAKUN
cpvs
90000000, 90500000, 90510000, 90511000, 90512000, 90513100, 90514000, 90533000

The contract is the "Receiving and municipal waste management from the community of Old Town, the property on which they live inhabitants" so as to achieve appropriate levels of recycling, preparation for re-use and recovery of other methods and reducing the weight of biodegradable municipal waste transferred to storage, according with the provisions of the Act of 13 September 1996. on maintaining cleanliness and order in municipalities (Journal of Laws of 2013, item. 1399 as amended) and the provisions of the Regional Waste Management Plan for the Wielkopolska Region for 2012-2017.

Sewage, refuse, cleaning and environmental services

Gmina Stare Miasto | Published September 29, 2015  -  Deadline November 4, 2015
cpvs
90000000, 90500000, 90510000, 90511000, 90512000, 90513100, 90514000, 90533000

The contract is the "Receiving and municipal waste management from the community of Old Town, the property on which they live inhabitants" so as to achieve appropriate levels of recycling, preparation for re-use and recovery of other methods and reducing the weight of biodegradable municipal waste transferred to storage, according with the provisions of the Act of 13 September 1996. on maintaining cleanliness and order in municipalities (Journal of Laws of 2013. pos. 1399 as amended) and the provisions of the Regional Waste Management Plan for the Wielkopolska Region for 2012-2017.

Stare Juchy: supply of wood pellets

 | Published July 11, 2016  -  Deadline April 30, 2017
cpvs
09111400

1. The contract is: the supply of wood pellets in bulk at a total estimated amount of 200 tonnes to of the School of Local Government in Stare Juchy with its unloading in the place indicated by the Purchaser. The size of single delivery should be 10-16 tons. Quality requirements: - homogeneous material - ash content - max. 0.5%; - The minimum calorific value of 18 GJ / t - moisture - max. 10% - diameter - 6-8 mm should conform ENplus certificate or similar. 2. Delivered to Employer wood pellet - will not be produced from wood waste that may contain fluor compounds - organic or heavy metals as a result of treatment with wood preservatives or coating, and which includes in particular waste wood from construction and waste demolition (in accordance with § 2, point 1 c of the Minister of the Environment of 22 April 2011. Dz. U. of 2011. No. 95, pos. 558); - Will not be contained in a substance is not biodegradable extent deviating from known natural properties of wood pellets a given type, ie. Will not contain in itself additives not biodegradable non-naturally occurring (eg. Paints, lacquers, preservatives), or in amounts exceeding the known natural size these impurities which affect combustion, and thus would affect the amount of obtained certificates of origin; - It will not contain solid impurities, such as metal parts, stones, debris, roots, boards, etc. And the elements of mold, mildew and decay of leaves and needles; ..

Operation of a sewage plant

Urząd Gminy Stare Pole | Published May 5, 2015
Winner
Centralny Wodociąg Żuławski Sp. z o.o.
cpvs
90481000, 90480000, 90000000

The contract is handling services, repairs, ongoing maintenance and operation of sewage treatment plants, equipment and sanitary sewerage system, located in the municipality of Old Field. The owner of the infrastructure which is the subject of the contract is the Municipality of Old Field. A detailed list of networks, devices and sewage treatment plant in the municipality of Old Field is presented in Exhibit 10 hereto. Contractor is obliged to provide services in accordance with laws, executive acts and local laws, in particular: 1) of the Act of 27.4.2001 Environmental Protection Law (Dz. U. of 2013. Pos. 1232 as amended.); 2) Act of 18.7.2001 Water Law (Dz. U. of 2012. Pos. 145 as amended.); 3) Act of 14.12.2012 on Waste (Dz. U. of 2013. Pos. 21, as amended.); 4) of the Act of 7.6.2001 on the collective water supply and collective wastewater treatment (Dz. U. of 2015. Pos. 139); 5) of the Act of 13.9.1996 on maintaining cleanliness and order in municipalities (Dz. U. of 2013. Pos. 1399 as amended) .; 6) the resolution of the Municipal Council 30.12.2005 Stare Pole on adopting the Rules of water supply and sewage in the commune Stare Pole (Acts. Office. Pomorskie Province in 2006. No. 30 pos. 586). Contractors for the implementation of the remuneration of the agreement will be charges collected from fees for sewage disposal. Contractors for the implementation of the remuneration of the agreement in 2015, will be charges collected from fees for wastewater discharge / g force until 31.12.2015 tariffs in the amount of 5 PLN / m3 + VAT (Resolution No. XXXIII / 274/2014 of the Municipal Council Stare Pole from 12.11. 2014 on the approval of the tariff for collective sewage disposal). Changing the tariffs will occur in accordance with the provisions of the Act of 7.6.2001 for public water supply and wastewater treatment (Dz. U. of 2015. Pos. 139). Projected annual fees for using the environment 12 850 PLN.

Stare Babice: Design of the external area of ​​Stare Babice

Gmina Stare Babice | Published July 26, 2016  -  Deadline July 26, 2016
Winner
Fit Park Sp. z o.o. Sp. k., ul. Powstańców Wielkopolskich 74, 87-100 Toruń, kraj/woj. kujawsko-pomorskie.
cpvs
37410000, 45112720

1.Przedmiotem contract is the supply and installation of gym equipment outside the area of ​​Stare Babice, which consists of: 1) Task 1 - Design of external Kwirynowie, 2) Task 2 - Design of external Zielonki Parcele, 3) Task 3 - Design of the external Borzęcin big. 2.Przedmiot order is described in detail in the Terms of Reference and project documentation. 3.Przedmiot order includes performing m. In. the following works and activities: 1) the delivery and installation of equipment outside of the gym for each location; The Contractor is obliged to provide the device with the following colors: pylons - yellow (PANTONE 116 CV or similar color), the remainder of devices - blue (PANTONE 3005 CV or similar color); 2) reclamation lawns; 3) obtaining a certificate in accordance with applicable standards (including the standards of the group PN-EN 1176) for the work done and installed equipment; 4) within the task 3 Contractor undertakes to transfer the two benches and one basket in the place indicated by the Employer in the Square Chopin Borzęcin big. 4.Przed signing a protocol of the Contractor is obliged to prepare and deliver to the Employer as-built documentation (together with the certificate on the work done and installed equipment) and inventory surveying (Employer accepts that on the day of receipt of the Contractor presented sketches surveying with the confirmation of the application submission inventory geodesic to mapping in the map repository and delivered it after mapping). 5.Warunki execution of the order: 1) The Contractor undertakes, in the execution of the contract, to the appropriate organization of work so as to ensure timely executed. 2) The Contractor agrees to delegate the work related to the implementation of the contract staff with the necessary experience, authority and qualifications, particularly those identified in the Contractor's offer. Contractor on its own determine and agree on the location of site facilities, protect them from access by third parties and shall bear the costs related to its maintenance and liquidation. 4) The Purchaser does not provide access to the media in the course of the work, the Contractor on its own ensures his access to water and electricity, and bear the costs of their consumption. 5) Since the protocol acquisition of land the site until the completion of the work the Contractor will be responsible for the general principles for the damage caused in the area. If you do not comply with the foregoing Purchaser may order repair of damaged equipment to another contractor at the expense and risk of the Contractor. If you do not comply with the foregoing the Employer may intend to restore greenery to another contractor at the expense and risk of the Contractor. 8) The Contractor shall be responsible for the security of the performance of the contract, in particular the conditions for the safe movement of vehicles and pedestrians within the work performed. If you do not comply with the foregoing Purchaser may order their removal to another contractor at the expense and risk of the Contractor. 10) The quality of materials used and work performed is the responsibility of the Contractor. 11) The Contractor shall bear full civil liability for any loss or damage arising in connection with the performance of duties by the Contractor under this contract and moreover for damages caused to third parties as a result of or in the course of the work. 12) The Contractor shall bear full civil liability for any loss or damage arising in connection with the performance of the subcontractor obligations arising from this contract. 13) Defects revealed during the reception and all warranty repairs will be removed within a period specified by the Purchaser. In the event of failure to comply with the foregoing Purchaser may order ordering the land to another contractor at the expense and risk of the Contractor. 15) Loans for the works commissioned by the Employer to another contractor at the expense and risk of the Contractor will be deducted from the invoice of the Contractor, to which the Contractor agrees. 16) Before signing a protocol of the Contractor is obliged to prepare and deliver to the Employer as-built documentation. 17) Completion of the work will be confirmed acceptance protocol signed by the Employer and the Contractor. 18) The Contractor shall be responsible for the consequences and for the results in: a) the organization and work, b) safeguard the interests of third parties, c) environmental protection, d) conditions for occupational health and safety, e) the organization and maintenance of facilities construction, f ) the safety of pedestrian environment construction,

Construction work

Gminne Przedsiębiorstwo Komunalne „Eko-Babice” Sp. z o.o. | Published August 4, 2015
Winner
AGREGATY POLSKA Cezary Bielak
cpvs
45000000, 45100000, 45111200, 45231400, 45231000

Object of the contract covers the implementation of the main power supply (cable lines, switchgear RG2, supply and installation of the generator in a container version, the execution of the ATS along with reactive power compensation, power supply and cable connections - between the control unit and switchgear RG2, external lighting unit, install a ground area) . Object of the contract includes: Electrical Installations main power supply and backup: 1) Implementation of the main power supply - making the cable line of terminals of ZK-1 + 1SL With the connection and relevant measurements. The place of supply of energy, while the place delimitation of distribution terminals are on a strip of measuring system - clearing. Cable 240mm2 natural 2x4x YAKXS of about 55 mb with connection and relevant measurements (it may use the additional terminal board with terminals which will be introduced 2xYAKXS 4x240 cables from the switchgear RG2 and which will be introduced flexible cables type 2x4xLgY150 mm2 to the plate unit RG-A ). 3) power circuits own needs unit - making the power supply line YKY 3x4 mm2 cable with a length of about 55 m (according to the project documentation). 4) control circuits and signaling ATS - making the line of control and signaling YKSYżo10x2,5mm2 cable with a length of about 55 m (according to the project documentation). Switchgear Index: 5) Delivery and installation of the main switchboard RG2 (in accordance with the guidelines and project documentation): a) ATS automation system (Automatic Backup Power Supply) with analyzers; b) field drainage; c) the capacitor resistant to higher harmonics with automatic dual-function controller (selection of capacitors and reactors of the type of start-up phase to verify the measurements carried out, taking into account the ordered power, maximum power and headroom); d) the main circuit current (GWP). Aggregate: supply, assembly and commissioning of a container unit with a capacity of 385 kVA emergency (308 kW) and 350 kVA (280kW continuous operation) associated with the system ATS. 7) Specific requirements for the unit are described in the project documentation. Other installations 8) Implementation of a grounding system to the generator - the execution ground networks to the generator to ground the nozzle with compensatory connections (in accordance with the guidelines and project documentation). Lighting pole with a height of 6 m on the foundation of an LED luminaire supplied from the existing circuit. The baseplate 10) Execution slab under the generator as a reinforced concrete slab plate will be sunk in the ground 50 cm. 11) The weight of the container unit version (outer - Silenced) is about 5,600 kg. ROUTE 12) Implementing the driveway of concrete blocks (hardening of the area) to operate the generator with a length of 13.5 m and a width of 4.5 m along the paved shoulder with a width of 0.75 m. 13) The implementation of the internal road section of concrete blocks (hardening of the area ) - Episode maneuvering for service vehicles operating with a length of 8.2 m and a width of 3.5 m. 14) Execution of the band and the pavement of concrete blocks around the container unit. 15) The way the inner and driveway should shape it so that rainwater was discharged on the adjacent green area. Requirements ordering 16) Provision of geodetic services. 17) Provide a complete set of hardware, labels, manuals, collective means of protection in the field of safety and fire protection required by the provisions specific to the proper functioning of the main power supply, power generator and switchgear. 18) Execution of electrical measurements: insulation resistance measurement, measurement of earth resistance, loop impedance measuring the effectiveness of RCDs. 19) Develop movement instructions and operating the generator to the network RE Pruszkow Warsaw Branch 20) Execution of as-built documentation maintenance, in accordance with the terms of joining the generator 21) Conducting training on new facilities and installation of sewage treatment service staff. 22) Execution information plaques and commemorative accordance with the guidelines of the Ministry of Regional Development for projects under the Operational Programme Infrastructure and Environment. 23) Implementation of labeling objects and installations in accordance with the requirements of the Purchaser. 24) Implementation of commissioning of facilities and installations. 25) The notification made installations for the Polish Energy Group. Detailed Description of the order is included in the project documentation: 1) building-executive: Power sewage treatment plant. Notes on the terms of reference: The realization must be agreed with the Purchaser. 2) In the event of a collision Artist commitments

Construction work

Gminne Przedsiębiorstwo Komunalne „Eko-Babice” Sp. z o.o. | Published April 29, 2015  -  Deadline June 9, 2015
cpvs
45000000, 45100000, 45111200, 45231400, 45310000

Object of the contract concerns the implementation of the main power supply (cable lines, switchgear RG2, supply and installation of the generator in a container version, the execution of the ATS along with the reactive power compensation, power supply and cable connections - between the control unit and switchgear RG2, external lighting unit, install a ground area) . Object of the contract includes: Electrical Installations main and backup power supply: 1) Implementation of the main power supply - making the cable line of terminals of ZK-1 + 1SL With the connection and relevant measurements. The place of supply of energy, while the place of separation of distribution terminals are the terminals to measuring system - clearing. 2x4x natural YAKXS cable 240mm2 with a length of about 55 m including connection and relevant measurements (it may use the additional terminal board with terminals which will be introduced 2xYAKXS 4x240 cables from the switchgear RG2 and which will be introduced 2x4xLgY150 type of flexible cables mm2 to the plate generator RG-A ). 3) power circuits own needs unit - making the power supply line YKY 3x4 mm2 cable with a length of about 55 m (according to the project documentation). 4) control circuits and signaling ATS - performance line of control and signaling YKSYżo10x2,5 mm2 cable with a length of about 55 m (according to the project documentation). Switchgear Index: 5) Delivery and installation of the main switchboard RG2 (in accordance with guidelines and project documentation): a) ATS automation system (Automatic Power Reserve) with analyzers; b) field drainage; c) capacitor resistant to higher harmonics with automatic dual-function control (selection of capacitor banks and reactors of the type of start-up phase to verify the measurements carried out, taking into account the ordered power, maximum power and headroom); d) the main circuit current (GWP). Aggregate: 6) Power generator container version (external - Silenced according Delivery with installation and commissioning of a container unit with a capacity of 385 kVA emergency (308 kW) and 350 kVA (280 kW in continuous operation) associated with the system ATS. 7) Detailed requirements for aggregate are described in the project documentation. Other installations 8) Installation of the generator grounding - performance network for generator grounding to ground the nozzle with compensatory connections (in accordance with the guidelines and project documentation). Lighting pole with a height of 6 m on the foundation of an LED luminaire supplied from the existing circuit. The baseplate 10) Execution slab under the generator as a reinforced concrete slab album will be recessed in the ground 50 cm. 11) the aggregate weight of containerized version (external - Silenced) is about 5,600 kg. ROUTE 12) Implementing the driveway of concrete blocks (hardening of the area) to handle the generator with a length of 13.5 m and a width of 4.5 m with paved shoulder width of 0.75 m. 13) Type of internal road section of concrete blocks (hardening of the area ) - Episode maneuvering for operational service vehicles with a length of 8.2 m and a width of 3.5 m. 14) Execution bands and the pavement of concrete blocks around the container unit. 15) The way the inner and driveway shape it should be so that rainwater was discharged on the adjacent green area. Requirements ordering 16) Provision of geodetic services. 17) Provide a complete set of equipment, signage, instruction, collective means of protection in the field of industrial safety and fire protection required by the provisions specific to the proper functioning of the main power generator and switchgear. 18) Execution of electrical measurements: insulation resistance measurement, measurement of earth resistance, loop impedance measuring the effectiveness of RCDs. 19) Develop operating and maintenance instructions generator to the network RE Pruszkow Warsaw Branch 20) Execution of as-built documentation maintenance, in accordance with the terms of the connection generator 21) Conducting training on new facilities and installation of sewage treatment service staff. 22) Execution information plaques and commemorative accordance with the guidelines of the Ministry of Regional Development for projects implemented under the Operational Programme Infrastructure and Environment. 23) Implementation of labeling objects and installations in accordance with the requirements of the Purchaser. 24) Implementation of commissioning of facilities and installations. 25) The notification made installations for the Polish Energy Group. Detailed Description of the order is included in the project documentation: 1) building-executive: Power sewage treatment plant. Notes on the terms of reference: The realization

Preservation services of historical buildings

Parafia rzymskokatolicka pw. św. Tomasza Apostoła w Nowym Mieście Lubawskim | Published May 10, 2017  -  Deadline June 21, 2017
cpvs
92522200, 45212360, 45453100, 92522000

The project is co-financed by the European Union under the European Regional Development Fund, Operational Program Infrastructure and Environment, Priority: VIII Protection of cultural heritage and development of cultural resources, Action: 8.1 Protection of cultural heritage and development of cultural resources.

The subject of the order is realization of activities related to the following scope of the project:

- construction work on wooden real estate;

- conservation work on wooden movable monuments.

Scope of work:

Trinity, Side altar of the Crucifixion, Pulpit; Fumigation works.

All Saints in Brzoziu.

Antonii, Sculpture of the Pieta, Sculpture Crucifix, Picture Christ in the Triangle.

Jerzy, fumigation works, protection of wooden surfaces.

Job, Stalle in the presbytery, organ choral organ with organ roll, pulpit, Benches (4 pieces), fumigation works.

Sacred Heart of Jesus in Radom: movable monuments, equipment and decor of the church: Altar (including altar paintings on canvas), Organs.

Roman Catholic Parish The main altar, Two side altars at the chancel, Two side altars on the walls of the nave, Ambon, Baptistery, Feretron (2 pieces), Band 5 sculptures, Organ view, Fumigation works.

Roman Catholic Parish St. Michael the Archangel in Tylice: monuments immovable, church building: walls and ceiling (including staircase joinery), window frames, door joinery, window frames, fumigation works.

Anna with the donor of the predella of the side altar), Feretron (2 pcs), fumigation works, wooden surface protection, construction works.

Full documentation is available at https://goo.gl/AhdKtS