Call +44 800 9755 164

Public tenders for environment in Lublin Poland

Find all Environment tenders in the world.
Finding business opportunities has never been easier.

Results for environment. Make a new search!

Engineering design services

Lubelskie Przedsiębiorstwo Energetyki Cieplnej Spółka Akcyjna | Published October 29, 2016  -  Deadline December 7, 2016
Development of complete project documentation and obtain a cost estimate and a final decision on the construction permit / certificate stated their intention to accede to the execution of construction works (required by applicable law) to the planned implementation of the redevelopment and rehabilitation of High pressure, duct heating network in the city of Lublin in the framework of the Project entitled .: "the modernization of district heating network in the city of Lublin" co-financed by the Cohesion Fund under the Operational Programme Infrastructure and Environment 2014-2020 and the author's supervision during the execution of this task, which is identified n / a number of budget: task No. 23 - mon .: "c. Czuby C4 - C6 JPII "(No. budget: M / 00430 / TCO / 16) Development of design documentation and formal - legal needs revitalization involving the modernization of the district heating network 2DN channel 700 from chamber to chamber C4 C6 ul. John Paul II, according to the attached map and the supervision of the author during this task.

Engineering design services

Zarząd Dróg Wojewódzkich w Lublinie | Published December 6, 2016  -  Deadline January 23, 2017

The scope of documentation

The primary objective of the contract is:

a) Develop a multi-sector comprehensive design documentation stage construction projects and regulations with documentation geodetic and legal decisions, all agreements and opinions, enabling to obtain a decision (Decision ZRID) with obtaining the required opinion on the request and preparation of application and materials to a request for getting this decision.

b) Developing the necessary materials and attachments to a decision on environmental conditions.

c) Development of materials and getting attachments necessary to obtain Decisions water permit.

Publ. and later. d

CPV code:

71320000-7 - Engineering services for the design, 71322300-4 - Bridge-design services, 70000000-1 - Real estate services, 90720000-0 - Environmental protection.

The composition of the documentation:

Construction project (PB) road sector.

2.The Executive (PM) industry road

3. Projects Building (PB), the construction industry - culverts

4.Projekty regulations (PW), the construction industry - culverts

5.Projekt building (PB), the electrical industry (construction of road lighting)

6.Projekt Executive (PM) electric industry (construction of road lighting)

7.Projekty Building (PB) and executive (PW) industries colliding with the planned new route, including, among others: the sanitary industry (water, gas, sewerage. Sanitary equipment, etc.), energy, telecommunications, etc.

8.Plansza collective utilities (all branches)

9.Projekt constant traffic organization

10.Projekt temporary traffic organization

11.Szczegółowa inventory of woodlots with a plan felling

12.Projekt Executive planting greenery (if it is required)

13.Projekt demolition (if required)

14.Projekt Wykonawczy- some estimates and przedmiarowa

Dock. Geotechnical

16.Dok.geologiczno-engineering

17.Wszystkie necessary materials to a decision to authorize the implementation of road investment (ZRID)

The impact of projects on the environment

19. conclusion of the materials and opinions to a decision ZRID

Map for design purposes

21Opinia of the conference coordination arrangements dock. proj. with graphic materials.

Map technical and operational

24 aa. of the PPA first will assess the bids, and then examine whether the contractor whose tender has been evaluated as the most advantageous, is not subject to exclusion and meets the conditions for participation in the proceedings.

Moreover, the Contractor when describing the design solutions is required to provide the parameters of equivalence in accordance with the model document Annex G.

Object of the contract must be described by reference in order of preference - in accordance with the contract documents.

Engineering design services

Zarząd Dróg Wojewódzkich | Published December 2, 2016  -  Deadline January 16, 2017

The primary objective of the contract is:

a) Develop a multi-sector comprehensive design documentation stage construction projects and regulations with documentation geodetic and legal decisions and all agreements and opinions, along with obtaining the required opinion on the request and preparation of application and materials to the application for that decision.

b) Developing the necessary materials and attachments to a decision on environmental conditions.

c) Development of materials and getting attachments necessary to obtain a decision water permit.

d) Development of materials necessary to announce a tender for the works required by the Public Procurement Law and the subsequent task.

CPV code:

71320000-7 - Engineering services for the design

70000000-1 - Real estate services

90720000-0 - Environmental protection.

Composition Documentation

Construction project (PB) branch road with culverts

Project Executive (PM) industry road with culverts

Construction project (PB), the electrical industry (construction of road lighting)

Project Executive (PM) electric industry (construction of road lighting)

Construction Projects (PB) and executive (PW) industries colliding with the planned new route, including, among others: the sanitary industry (water, gas, sewerage. Sanitary equipment, etc.), energy, telecommunications,

The board collective utilities (all branches)

Project constant traffic organization

The project of temporary traffic organization

Detailed inventory of woodlots with a plan felling

Executive project of planting of greenery

Demolition project (if it is required)

Project Executive - some estimates and przedmiarowa

Geotechnical documentation

Geological and engineering documentation

All the necessary materials to a decision to authorize the implementation of road investment (ZRID)

The impact of projects on the environment

The application materials

Map for design purposes at a scale of 1: 1000 and 1: 500 for engineering and urban areas with verification on the basis of the borders of all parcels located within the area of ​​the planned road investment borders and demarcation lines forming area of ​​investment.

Opinion of the conference coordination arrangements of project documentation with graphic materials (ZUDP)

Map technical and operational for the expanded section of provincial road.

Regulations.

These orders are included in the Strategic Programme for Transport Development Region Lublin and planned to take up co-financing from the European Union from the European Regional Development Fund within the Regional Operational Programme of Lublin 2014-2020, Priority Axis 8 Regional Mobility and Ecological Transportation, Measure 8.1 Regional Transport system.

III.

As a similar order we anticipate the development of geodetic documentation - legal for the performance of the division, or the acquisition of the entire parcel for up to 130 pcs. Of parcels.

67, paragraph 1, item 6 ustawu PPL:

a) will be conducted negotiations, where the parties will establish a detailed scope of the contract, the term of the contract and the amount of remuneration,

b) The Contractor shall perform the basic contract them to the same standard as the documentation of geodetic and legal status for the main contract.

Lublin: Develop a comprehensive documentation of the design-budget expansion of the district road No. 2107L in m. Wilczopole by the construction of the pavement with road lighting improves the availability of public transport lines 73 and 16

Gmina Głusk Dominów | Published July 21, 2016  -  Deadline May 31, 2017
1550m with the duties of the author's supervision. Contractor shall perform the reconstruction of the road project documentation for the construction of the pavement with the admission of cycling with a width of 2.5 m and a design documentation construction of road lighting in accordance with the purpose, principles and achievements of the art building, the requirements specified by the Employer in this Terms of Reference, national standards and industry and applicable laws and regulations in carrying out design projects in particular: 460, as amended. d.), 290.) 462 as amended. d.), 1129), 124). In the implementation of the contract, the Contractor should take into account the Guidelines of the Minister of Infrastructure and Development in the implementation of the principle of equal opportunities and non-discrimination, including accessibility for people with disabilities and the principle of equal opportunities for men and women within the framework of the EU funds for 2014-2020 of 8 May 2015. in particular with regard to the concept of universal design, referred to below in Section 3.2.14) hereof. 2. When preparing the project documentation should in particular: 1550m), 2) the construction of road lighting (above), 3) the construction of platforms stops on both sides of the road, 4) drainage of the road with pedestrian and bicycle-construction or reconstruction of culverts, 5 ) execution of marking horizontal and vertical road, 6) reconstruction or securing foreign devices, 7) the construction or reconstruction of individual meetings and public communication service providing each parcel of land adjacent to the road within the development ,, Universal design does not exclude the possibility of providing additional facilities for specific groups of people with disabilities, if needed, 9) other items that have not been clearly indicated by the Employer, and may be necessary from the point of view of the legislation in force and to which object of the contract is to serve, in the course of preparing the documents. 3.Zakres design work includes: 1) mapping for design purposes, 2) obtain the Employer on behalf of all technical conditions, arrangements and opinion necessary for the proper development of technical documentation and obtain a building permit or acceptance of the building. 3) the preparation of the construction project and executive structure of the pavement with the admission of cycling - 5 copies. In hard copy and 1 copy. Electronic version 4) the preparation of the construction project and executive construction of road lighting - as above, 5) development of bill of quantities and cost estimates investor ( for all industries) - 2 copies. in hard copy and 1 copy. in the edited version of electronic, 6) develop detailed technical specifications for execution and acceptance of construction works (SSTWiORB) - 1 copies. in paper and 1 copies. version electronic, 7) the preparation and agreement of the project permanent and temporary traffic organization - 3 copies. in the paper version; 8) the development of construction projects reconstruction or removal of a collision for particular sectors of detail in accordance with Regulation of the Minister of Infrastructure on the detailed scope and form of the construction project - 5 copies (if necessary), 9) preparation of information on safety and health (BIOZ) - for any documentation. 10) preparing any studies necessary to obtain a building permit or acceptance of the construction (if necessary) such as .: 353, as amended. d.) (to prepare a report on the impact of the proposed road project on the environment should the need arise) and obtaining the final decision, b) preparing geodetic documentation - legal, 124); d) development of materials necessary for obtaining water permit - legal, eg. sampling (where is necessary), e) the preparation of information and studies required for the notice of intention to make a technological channel, f) preparation of documentation and inventory dendrological for felling trees and shrubs and, if necessary compensatory planting plan (whenever it is necessary), the Employer requires coordination of project documentation before applying for a building permit or application works. 12) supervising the copyright in the guarantee period during the execution of construction works carried out on the basis of prepared documentation, 13) performance (if necessary) twice renovation investment cost estimate within two years of receipt of completed studies (on the date specified by the Employer), 14) all elements of project documentation and studies listed above should be submitted in electronic format agreed with the Employer, including at least 1 copy editable version 1 and version to read, 15) in order to monitor the progress of a person attending

Lublin: Develop a comprehensive documentation of the design-budget extension of municipal road No. 112440L and the construction of road lighting in m. Wilczopole improving the availability of public transport lines 73 and 16

Gmina Głusk Dominów | Published July 20, 2016  -  Deadline June 30, 2017
1 + 030 in Wilczopole in the commune Głusk with the duties of the author's supervision. Contractor shall prepare design documentation development of roads and the construction of road lighting in accordance with the purpose, principles and achievements of the art building, the requirements specified by the Employer in this Terms of Reference, national standards and industry as well as applicable laws and regulations in carrying out design projects in particular: 2031) 460, as amended. d.), 290), 462 as amended. d.), 1129), 124). In the implementation of the contract, the Contractor should take into account the Guidelines of the Minister of Infrastructure and Development in the implementation of the principle of equal opportunities and non-discrimination, including accessibility for people with disabilities and the principle of equal opportunities for men and women within the framework of the EU funds for 2014-2020 of 8 May 2015. in particular with regard to the concept of universal design, referred to below in Section 3.2.11) hereof. 2. When preparing the project documentation should in particular: 1030m, 1030m, 3) reconstruction loop recurrent public buses, 4) the construction of road lighting (above), 5) the construction of bus bays or platforms of stops on both sides of the road, 6) dehydration road and sidewalk 7) the construction or reconstruction of culverts, 8) execution of marking horizontal and vertical roads, 9) reconstruction or securing foreign devices, 10) construction or reconstruction of the conventions of individual and public providing communication service each parcel of land adjacent to the road within the development, universal design does not rule out the possibility of providing additional services for particular groups of persons with disabilities, if needed, 12) other elements that were not by the Employer clearly indicated, as may be necessary from the point of view of the legislation in force and to which object of the contract is to serve, in the course of preparing the documents. 3.Zakres design work includes: 1) mapping for design purposes, 2) obtain the Employer on behalf of all technical conditions, arrangements and opinion necessary for the proper development of technical documentation and obtain a decision ZRID, 3) the preparation of the construction project and executive development of road - 6 copies. in hard copy and 1 copy. electronic version 4) the preparation of the construction project and executive construction of road lighting - as above; 5) preparation of bill of quantities and cost estimates investor (for all industries) - 2 copies. In hard copy and 1 copy. In the edited version of electronic, 6) develop detailed technical specifications for execution and acceptance of construction works (SSTWiORB) - 1 copies. In paper copies and 1. electronic version 7) the preparation and agreement of the project permanent and temporary traffic organization - 3 copies. in the paper version; 8) the development of construction projects reconstruction or removal of a collision for particular sectors of detail in accordance with Regulation of the Minister of Infrastructure on the detailed scope and form of the construction project - 5 copies (if necessary), 9) preparation of information on safety and health (BIOZ) - 3 pcs., 10) preparing any studies necessary to obtain a decision in accordance with the Act of 10 April 2003. on special rules for the preparation and implementation of investments in public roads, in particular: 353, as amended. d.) (to prepare a report on the impact of the proposed road project on the environment should the need arise) and obtaining the final decision, 3 copies, 124); - The numbers of required to the application ZRID, d) development of materials necessary for obtaining water permit - legal, eg. Sampling (where is necessary), e) the preparation of information and studies required for the notice of intention to make a technological channel, f) preparation of documentation and inventory dendrological for the felling of trees and shrubs and, if necessary, the plan plantings compensatory - the numbers of required to the application ZRID, 2 pcs., and obtain on behalf of the Employer's final decision ZRID, 12) supervising the copyright in the warranty period during execution of works carried out on the basis of prepared documentation, 13) performance (if necessary) twice renovation investment cost estimate within two years of receipt of completed studies (on the date specified by the Employer), 14), all elements of project documentation and studies included above should be presented in electronic format agreed with the Employer, 15) in order to monitor the progress of the person involved in the execution of the contract with the power to design the road specialty without limitation, indicated in załączni
  • 1