Public tenders for environment in Gorzow-wielkopolski Poland

Find all Environment tenders in the world.
Finding business opportunities has never been easier.

Results for environment. Make a new search!
EnvironmentPolandgorzow-wielkopolski

Control, safety or signalling equipment for roads

Miejski Zarząd Dróg | Published May 24, 2017  -  Deadline June 29, 2017
cpvs
34996000, 64226000, 71311200

1. System preparation and integration of the existing IT environment, consisting in the development of the ITS System documentation - including technical documentation, technical specifications, tests and obtaining all required opinions and approvals

Supply and installation of vehicle-signaling transmitters

Upgrading the drivers to receive devices

Start up devices in the driver environment

Conduct training for system staff.

Project co-financed by the European Union from the European Regional Development Fund within Wielkopolska Regional Operational Program 2014-2020

Place of delivery and assembly:

* Reception system connected to the traffic light controller at the intersection:

Harcerska

Ledóchowski

Pilsudski

Witosa

Gimnazjalna

Witosa

park

Mylna

Batory

Traugutt

Bema

* Broadcasting system - in 59 urban public transport vehicles.

Subject of the contract includes:

System preparation and integration of an existing IT environment consisting in the development of the ITS System documentation - including technical documentation, technical specifications, tests and obtaining all required feedback and approvals

Supply and installation of vehicle-signaling transmitters

Upgrading the drivers to receive devices

Start up devices in the driver environment

Conduct training for system staff.

Building completion work

Lubuski Urząd Wojewódzki w Gorzowie Wlkp. | Published May 12, 2017  -  Deadline June 19, 2017
cpvs
45400000, 45330000, 45311200

The subject of the Order is the execution of construction works related to the realization of the investment task: "Thermomodernization of the Lubuskie Voivodship Office in Gorzów Wlkp." The project is co-financed by the European Union under sub-measure 1.3.1 Priority axis I Reduction of emissivity of the Economy Operational Program Infrastructure and Environment 2014 - 2020. Application for co-financing No. POIS.01.03.01-00-0016 / 16, project entitled "Thermomodernization of the Lubuskie Voivodship Office in Gorzow Wlkp."

Photocopying equipment

Miasto Gorzów Wielkopolski | Published October 7, 2017
Winner
RICOH Polska Spółka z o.o.
cpvs
30121200, 30232110, 50313200, 50313100

1) The subject of the order is a service consisting in renting office of the City of Gorzów Wielkunnych and printers for a period of 48 months.

2) The scope of the order includes the following elements:

a) multifunctional devices and printers:

(b) a system for managing and supervising the printing environment.

1) The subject of the order is a service consisting in renting office of the City of Gorzów Wielkunnych and printers for a period of 48 months.

2) The scope of the order includes the following elements:

a) multifunctional devices and printers:

SEGMENT A - Multifunction monochrome A4 - 15 pcs,

SEGMENT B - A3 monochrome multifunction device - quantity 5,

SEGMENT C - Multifunctional A4 color printer - quantity 4,

SEGMENT D - Multifunctional A3 color printer - quantity 8,

SEGMENT E - monochrome A3 multifunction device - quantity 4,

SEGMENT F - Monochrome A4 printers - quantity 10 pcs

(b) a system for managing and supervising the printing environment

The contractor will provide contractors with a virtual server with parameters, 1 processor, 8 GB RAM, Network Interface1GB, HDD 80 GB. The virtual server works on the Vmware platform. The licensee is licensed for the operating system for virtual server and lice.

Retrofitting of the Special Educational Centre in Great Lipki.

 | Published November 12, 2014  -  Deadline November 27, 2014
cpvs
45000000, 45100000, 45110000, 45111000, 45112000, 45200000, 45214200, 45300000, 45320000, 45321000, 45324000, 45310000, 45330000, 09330000

Central heating and domestic hot water need of modernization. Recommendations for supplier means that the Contractor shall prepare bill of quantities at its own discretion and make an overall valuation of the contract for the work specified in the order specification and the project on its own responsibility and risk of the above shall not be accepted by thermal modernization works have Contractors. The Purchaser is not allowed to change the date completion of the task by the Contractor. The task implemented with funding from the Lubuskie Regional Operational Programme for the years 2007-2013, under Priority III - Protection and management of the natural environment, Measure 3.2 Improving air quality, energy efficiency and the development and use of renewable energy sources. In case of co-financing by the Employer as a result of failure to perform the task by the Contractor within a specified period, the Contractor will be required to pay the entire amount of funding lost by the Purchaser together with interest accrued for tax arrears and other costs incurred by the Purchaser arising from the loss of funding.

Ostrow Wielkopolski: Construction of multi-purpose sports fields with synthetic surface at the School of Technical in Ostrow Wielkopolski

Starostwo Powiatowe w Ostrowie Wielkopolskim | Published July 26, 2016  -  Deadline October 10, 2016
cpvs
45212221

The contract is for the construction of fields of tennis on synthetic grass surface enclosed fence with a polypropylene mesh that functions piłkochwytów along with the development of the associated land. Description The proposed location field is located in the przyszkolnego sports complex belonging to the Team of Technical School in Ostrow Wielkopolski on a plot of Poznan, in place of the existing tennis court with concrete surface is in the vicinity of the building ZST. The area surrounding the court is developed, armed with the network, including storm water drainage. Access and access to the court ensured existing internal passageways in the school. Description of the proposed solutions of functional designs to court for tennis on synthetic grass surface enclosed fence with a polypropylene mesh that functions piłkochwytów along with the development of the associated land. 2.1 Dimensions and surface designed playgrounds for tennis: · the dimensions of the basic tennis lines autowych 10.97 x 23.77 m · overall dimensions synthetic grass surface 18.67 x 34.77 m · area surface tennis court, 649.16 m2 · overall dimensions of the study area 23.19 x 36.29 m · total surface area covered by the development of 841.56 m2 · surface made of concrete blocks (headband + pavement) 187.07 m2 2.2 Separation tennis court with a polypropylene mesh fence height · 4 · 00 m total length 109.50 m · fence spacing of the basic pillars of 3.00 m · mesh size 4,5x4,5x0,5 cm 1,5x2,0 m 2.3 equipment field sports equipment · bars with mesh tennis to mount in sleeves embedded in the surface of the pitch. 2.4 Elements of land off · bench przyobiektowy 9 pcs. 2 pcs. · Bench tennis 2 pcs. Of land and foundation of the tennis Projected court tennis located in the place of the existing tennis court with concrete surface which was used as one of the layers foundation under the projected surface of grass synthetic court. Terms of realization of the tennis When designing a tennis court uses existing components development field - concrete surface layer as the foundation of a new surface tennis; - Connection of storm water drainage associated with dehydration pitch. Other elements of land at the pitch due to poor technical condition has been for demolition. Design surface is drained through the drainage point vertical and cables located around the perimeter of the pitch. Surface tennis court will be exalted in relation to the surrounding area and formed with a slope to allow drainage of rainwater and protection of the surrounding terrain. How to adapt buildings to the landscape and environment Designed court does not change the existing land use of a sport, only enhances its aesthetic and functional values. Data on existing and expected features of a threat to the environment and health and the health of users projected sports facility increases the surface area of ​​green spaces which will be built after the liquidation of field bleachers. When designing the above. object used materials and products having the required certificates allowed for the construction of sports fields. Equipment and planned field meet safety requirements designed sports surface tennis is a product against traumatic, provided that its use and maintenance will comply with the requirements of the manufacturer's surface. Collection of solid waste is provided in the bins located at the court, which will be periodically emptied into containers container in the school. Information on hygiene and health of users Users field will be used for health and hygiene of sanitary facilities located in the school building. Accessibility for the disabled Designed court is adapted for people with disabilities including wheelchair access. A detailed description of the contract includes the technical specification of the workmanship and the receipt of work, the project construction - executive, bill of quantities. Bearing in mind that the present case assumed an inclusive price for the execution of the contract, the contractor will prepare an offer on the basis of construction projects and technical specifications of the workmanship and the receipt of work, annexed hereto.

Ostrow Wielkopolski: Modernization of aeration system in the biological reactor RB and at the Wastewater Treatment Plant in Rąbczynie

WODKAN Przedsiębiorstwo Wodociągów i Kanalizacji S.A. | Published August 16, 2016  -  Deadline August 16, 2016
Winner
FILTECH TECHNIKA ODWADNIANIA OSADÓW Sp. z o.o. - lider konsorcjum, ul. Kolejowa 27a, 46-073 Chróścina Opolska, kraj/woj. opolskie.
cpvs
45252200, 90000000

The material scope of the contract includes: Part 1: -wyczyszczenie biological reactor RB and the lingering deposits, estimated the amount of deposits on 37,1x88,25x0,25 = 820 m3, where the width is 37,1m and RB, RB length and is 88, 25m depth lingering deposits of 0.25 m, -odwodnienie sludge from cleaning biological reactor RB and press on the mobile and deposit stock of deposits at the Sewage Treatment Plant in Rąbczynie, -Cleaning reactor is to be carried out using specialized equipment such as charger vacuum cleaner High pressure itp.Część 2: -replacement disk membrane (2,950 units) to the aeration system Flygt sanitary-9 with the necessary elements of the diffuser, the technical characteristics of the membrane disk: performance: 1 - 6 Nm³) h, the diameter of the membrane 240 mm, the membrane material: EPDM elastomer, the size of the air bubbles: 1 - 3 mm, the efficiency of the system: 6.0 - 8.0% at 1 m depth, max. air temperature of 100 ° C, -made a leak test on the process water aeration system (part of the regulatory dampers), the removal of leaks and installation start-up, -części parts supplied by the contractor should be identical with the elements currently working aeration system in terms of both size and resistance to the environment of waste water, in which they are installed, -to the supplied disk membrane diffusers contractor must include technical data sheets of the product, -zamawiający does not allow the use of parts whose assembly would cause alteration or modernization of the existing aeration system, supplying the drives diaphragm and necessary parts of the diffuser must be equivalent with the system owned by the customer, ie. not deviate from the technical parameters for brand new items aeration system owned by the buyer.

Ostrow Wielkopolski: Transport students to the School Complex in Sobotka, Municipality of Ostrow Wielkopolski. Greater.

Gmina Ostrów Wielkopolski | Published July 21, 2016  -  Deadline June 30, 2017
cpvs
60130000

1. The contract is: Pickups students in the period from 1 September 2016. 30 June 2017r. the School Complex in Sobotka; drop off to the residence after school on the route - according to Annex 6 to the terms of reference. Number of students to carry 53 people each route. Transportation implemented one bus route. Implementation occasional on non-school days (retreats, making up for school days at other times, holidays, school transports students to the event environment organized by the Employer, etc.), The need for which stems from the organization of the work of educational institutions and the organization of the school year - by distribution occasional agreed with the Employer. U. of 2012. poz.1137 consolidated text as amended. d.) and other provisions relating to the carriage of persons, the Law of Laws of 2013. poz.1414 consolidated text as amended. d.). The contractor must provide students with safe transport, ie. The appropriate health and safety conditions. Seats for children kindergarten and grades 1-3: 44 people. The Contractor shall insure buses and passengers from any damage during transport and in connection with the carriage. Drivers operating buses should know the route of travel and stops the rotation of the driver is advised. The Employer provides care dowozem. Schedule of commutation - the timetable may be changed in case of organizational changes school work. A detailed schedule of travel on the route is attached as Annex 6 for each day of the week: Monday - Friday. 2. A process for the contract: pick up and drop off students should be provided in school days provided for the organization of the school year, starting from 1 September 2016. 30 June 2017r.

Ostrow Wielkopolski: Transport students to the Primary School in Rats and Public Kindergartens in Biniewie, Municipality of Ostrow Wielkopolski. Greater.

Gmina Ostrów Wielkopolski | Published July 21, 2016  -  Deadline June 30, 2017
cpvs
60130000

1. The contract is: Pickups students in the period from 1 September 2016. 30 June 2017r. Primary School in Rats and Public Kindergartens in Biniewie; drop off to the residence after school on the route - according to Annex 6 to the terms of reference. Transport carried out on two routes - one per route. I Route: Będzieszyn - Górzno - Biniew - Rats - 45 students II route: Gorzno - Górzenko - Biniew - Rats - Szczurawice - 17 students. Implementation occasional on non-school days (retreats, making up for school days at other times, holidays, school transports students to the event environment organized by the Employer, etc.), The need for which stems from the organization of the work of educational institutions and the organization of the school year - by distribution occasional agreed with the Employer. U. of 2012. poz.1137 consolidated text as amended. d.) and other provisions relating to the carriage of persons, the Law of Laws of 2013. poz.1414 consolidated text as amended. d.). The contractor must provide students with safe transport, ie. The appropriate health and safety conditions. Seats for children kindergarten and grades 1-3: 17 people. The Contractor shall insure buses and passengers from any damage during transport and in connection with the carriage. Drivers operating buses should know the route of travel and stops the rotation of the driver is advised. The Employer provides care dowozem. Schedule of commutation - the timetable may be changed in case of organizational changes school work. A detailed schedule of travel on the route is attached as Annex 6 for each day of the week: Monday - Friday. 2. A process for the contract: pick up and drop off students should be provided in school days provided for the organization of the school year, starting from 1 September 2016. 30 June 2017r.

Ostrow Wielkopolski: Transport students to Team School-Preschool on Tuesday, Municipality of Ostrow Wielkopolski. Greater.

Gmina Ostrów Wielkopolski | Published July 21, 2016  -  Deadline June 30, 2017
cpvs
60130000

1. The contract is: Pickups students in the period from 1 September 2016. 30 June 2017r. Team to School and Kindergarten in Tuesday; drop off to the residence after school on the route - according to Annex 6 to the terms of reference. Number of students to carry 45 people each route. Transportation implemented one bus route. Implementation occasional on non-school days (retreats, making up for school days at other times, holidays, school transports students to the event environment organized by the Employer, etc.), The need for which stems from the organization of the work of educational institutions and the organization of the school year - by distribution occasional agreed with the Employer. U. of 2012. poz.1137 consolidated text as amended. d.) and other provisions relating to the carriage of persons, the Law of Laws of 2013. poz.1414 consolidated text as amended. d.). The contractor must provide students with safe transport, ie. The appropriate health and safety conditions. Seats for children kindergarten and grades 1-3: 23 people. The Contractor shall insure buses and passengers from any damage during transport and in connection with the carriage. Drivers operating buses should know the route of travel and stops the rotation of the driver is advised. The Employer provides care dowozem. Schedule of commutation - the timetable may be changed in case of organizational changes school work. A detailed schedule of travel on the route is attached as Annex 6 for each day of the week: Monday - Friday. 2. A process for the contract: pick up and drop off students should be provided in school days provided for the organization of the school year, starting from 1 September 2016. 30 June 2017r.

Ostrow Wielkopolski: Transport students to the School Complex in Lamkach, Primary School in Daniszynie and Public Kindergartens in Daniszynie and Team School and Kindergarten in Łąkocinach, Municipality of Ostrow Wielkopolski. Greater.

Gmina Ostrów Wielkopolski | Published July 21, 2016  -  Deadline June 30, 2017
cpvs
60130000

1. The contract is: Pickups students in the period from 1 September 2016. 30 June 2017r. the School Complex in Lamkach, Primary School in Daniszynie and Public Kindergartens in Daniszynie and Team School and Kindergarten in Łąkocinach; drop off to the residence after school on the route - according to Annex 6 to the terms of reference. Number of students to carry 50 people each route. Transportation implemented one bus route. Implementation occasional on non-school days (retreats, making up for school days at other times, holidays, school transports students to the event environment organized by the Employer, etc.), The need for which stems from the organization of the work of educational institutions and the organization of the school year - by distribution occasional agreed with the Employer. U. of 2012. poz.1137 consolidated text as amended. d.) and other provisions relating to the carriage of persons, the Law of Laws of 2013. poz.1414 consolidated text as amended. d.). The contractor must provide students with safe transport, ie. The appropriate health and safety conditions. Seats for children kindergarten and grades 1-3: 37 people. The Contractor shall insure buses and passengers from any damage during transport and in connection with the carriage. Drivers operating buses should know the route of travel and stops the rotation of the driver is advised. The Employer provides care dowozem. Schedule of commutation - the timetable may be changed in case of organizational changes school work. A detailed schedule of travel on the route is attached as Annex 6 for each day of the week: Monday - Friday. 2. A process for the contract: pick up and drop off students should be provided in school days provided for the organization of the school year, starting from 1 September 2016. 30 June 2017r.

Ostrow Wielkopolski: Transport students to the School Complex in Lewkowo, Municipality of Ostrow Wielkopolski. Greater.

Gmina Ostrów Wielkopolski | Published July 21, 2016  -  Deadline June 30, 2017
cpvs
60130000

1. The contract is: Pickups students in the period from 1 September 2016. 30 June 2017r. the School Complex in Lewkowo; drop off to the residence after school on the route - according to Annex 6 to the terms of reference. Number of students to carry 56 people each route. Transportation implemented one bus route. Implementation occasional on non-school days (retreats, making up for school days at other times, holidays, school transports students to the event environment organized by the Employer, etc.), The need for which stems from the organization of the work of educational institutions and the organization of the school year - by distribution occasional agreed with the Employer. U. of 2012. poz.1137 consolidated text as amended. d.) and other provisions relating to the carriage of persons, the Law of Laws of 2013. poz.1414 consolidated text as amended. d.). The contractor must provide students with safe transport, ie. The appropriate health and safety conditions. Seats for children kindergarten and grades 1-3: 22 people. The Contractor shall insure buses and passengers from any damage during transport and in connection with the carriage. Drivers operating buses should know the route of travel and stops the rotation of the driver is advised. The Employer provides care dowozem. Schedule of commutation - the timetable may be changed in case of organizational changes school work. A detailed schedule of travel on the route is attached as Annex 6 for each day of the week: Monday - Friday. 2. A process for the contract: pick up and drop off students should be provided in school days provided for the organization of the school year, starting from 1 September 2016. 30 June 2017r.

Ostrow Wielkopolski: Perform periodic inspections of annual general construction industry and energy performance certificates for buildings managed by the Municipal Department of Housing Ltd. in Ostrow Wielkopolski divided into 2 tasks.

 | Published July 13, 2016  -  Deadline July 25, 2016
cpvs
71318000

Task No. 1 subject of the contract is to perform periodic inspections of the annual general construction industry buildings managed by the Municipal Department of Housing Sp. z oo in Ostrow Wielkopolski, in accordance with Article. 62 paragraph. 1 point. 1 of the Building Act. The detailed scope of the contract includes: 1. Inspection and analysis of the technical condition. Analysis of the technical state based on the received technical documentation of the building. The rating is the size of consumption - assessment of the examination. Assess the extent of outstanding renovation works recommended in the previous protocol concerning the condition of the structure. The scope of the renovation and the sequence of their execution, taking into account the safety of people, environment, building structure, - conclusions and post-audit recommendations. Protocols drawn up by controls should include, among others, determine: a) the technical condition of the building elements under control, b) the size of wear or damage to the elements referred to in point. and c) the scope of the renovation and the order of their execution, d) methods and means of use of building components exposed to the harmful effects of the weather, e) other post-audit recommendations Task 2 The contract is for the implementation of energy performance certificates for buildings managed by the Municipal Department of Housing Sp. z oo in Ostrow Wielkopolski, in accordance with Article. 3 paragraphs. 1 and art. 15 paragraph. 1.2 of the Law on Energy Performance of Buildings of 29 August 2014. The detailed scope of the contract includes: The energy performance certificate separately for each building should include, among others, 1. identification of the building, 2. the energy performance of the building, 3. Recommendation defining the scope and type of construction - installation, which will improve the energy performance of the building ..

Gorzow Wielkopolski: Repair of the district road 1395F in Krasowiec, gm. Deszczno

Powiat Gorzowski | Published July 19, 2016  -  Deadline July 15, 2016
Winner
MALDROBUD Sp. z o.o. Sp. K., ul. Królewiecka 43, 74-300 Myślibórz, kraj/woj. lubuskie.
cpvs
45233000, 45233142, 45233223, 45111000

Overview: As part of the refurbishment As part of the shoulder of the road works will be completed on the concrete rubble width of 0.5 m with density at a depth range of repair involves a county road No. 1395F section of national road No. 22 to the railroad tracks. District road No. 1395F, which runs through the village Krasowiec is in a very bad condition, which makes the area planned to repair the stretch of road are agricultural land, farm buildings and single-family houses, where the road is the only access: - road surface county road shows significant the degree of damage, and its status can be described as bad, - road surface has numerous damages, mainly fractures grid, the intensity of which is particularly evident in the wheel tracks of vehicles and at the edges of design solutions: works related to any 3 of the Act Employer allows the use of trade marks only where this is justified by the specificity of the object 5 Public Procurement Law contractor, which refers to a solution proper implementation of the project is connected with the observance of sharp technological regimes, and in particular remember to: - keep the premises in a condition without standing water - protect the shoulder against blur by rainwater, - take all reasonable steps to comply with the building regulations and standards for the protection of the environment, - to avoid causing excessive noise, emissions or other causes arising as a result of the investment, - protect existing vegetation, particularly trees and shrubs before their destruction in the course of the task - to make works of restoration work, the existing construction work consisting in restoring the original condition, not constituting ongoing maintenance, which allowed the use of construction products other than those used in the original state - to ensure proper recycling and recycling 2, item 1) of the Public Procurement Act the obligation of personal performance by the Contractor of the contract works, ie .: the Contractor must

Repair and modernization of the county road No. 1393F which is the access to agricultural land in the village Chwałowice - Stage II.

 | Published October 30, 2014  -  Deadline November 14, 2014
cpvs
45233142, 45111000, 45233000, 45112000

Will be made as additional work: strengthening the surface of shoulders (humusowanie) in the amount of 2,700.00 m² (on both sides of a width of 1 m). Włostów, Gorzów County until the end of resurfacing performed in October 2014. The project road does not change the road drainage, pavement replacement width adjusted to the status quo in a way that does not undermine the stability of the existing slopes and fit the lines demarcating the road. Design solutions: roadway - the existing roadway width of 4.3 m to 4.5, - bituminous surface - falling transverse than 2%. Congresses to farms and agricultural land - the width adjusted to the status quo - are not covered by the repair - bituminous pavement - strengthening existing conventions ground - longitudinal inclination exit within the crown of the road adapted to its shape. The surfaces of 4 cm, 2 cm, - milling the existing bituminous pavement - max. to 3 cm, Longitudinal Design proper grade of the road district was conducted in order to: - ensure a minimum thickness of pavement strengthening of existing - to keep liquidity in conjunction with geometric elements in the plan (eg. in order to enable the establishment of the proposed height of the crown of the exits, fences etc.) - associate with objects bridges - to limit the roadway, - provide a connection to the existing terrain - to ensure drainage of the road surface. Dehydration configuration of heights designed objects defined in relation to: - the amount of entries to buildings, - the position of adjacent land, - the conditions resulting from the drainage of rainwater. Scheduled to repair roadway is not limited curb, and rainwater is discharged by means of the cross falls outside the crown of the road. The planned renovation is recognized in its scope only works road construction industry. General information All work must be carried out in accordance with the applicable European Union standards, regulations, is due to the existing legal normative acts, including provisions for the protection of the environment, which must demonstrate knowledge of both the Contractor and representatives of the Investor. This is a key part of the executed order. NOTE! Purchaser is permitted to change the deadline for completion of the task by the Contractor. Such a change is allowed only with the reasons: weather conditions prevent the carrying out of works in accordance with the anticipated technology (rainfall, temperature too low), occurs during the execution and the area covered by the activities of the Contractor works disaster.

Architectural design services

Komenda Wojewódzka Policji w Gorzowie Wlkp. | Published November 23, 2017  -  Deadline January 2, 2018
cpvs
71220000

Batorego 90 in Zielona Góra, POIS.01.03.01-00-0086 / 16 under the sub-measure 1.3.1 Priority axis Reduction of emissivity of the Economy Operational Program Infrastructure and Environment 2014-2020.

Supervision of the author in the period of investment execution for a given construction project.

Batorego 90 in Zielona Góra using renewable energy sources.

The project is not located in areas covered by forms of nature protection,

Basic parameters of the building:

99/3, within the registration no. 4 - Zielona Góra city, registration unit Zielona Góra,

b) building construction - made of mixed brick-reinforced concrete technology,

c) number of storeys - 1 (height of building 6,12 and 4,13 m)

d) building area - 1397,25 m²

e) usable area - 1 215.55 m²

f) building volume - 6 764 m³

The ordering party shall fulfill the subject of the order within a minimum period of not less than 60 calendar days, counting up to the date of conclusion of the contract and not exceeding 80 calendar days from the date of conclusion of the contract.

Due to the limited number of letters in each of the fields, the subject of the order is described in details in the Terms of Reference and its Annex III. The SIWZ contains information on the scope of work on the execution of the documentation and its execution and the design documentation.

Repair of the roof of the school building Youth Education Centre in Koźmin Wielkopolski ..

 | Published August 3, 2015  -  Deadline August 18, 2015
cpvs
45410000, 45261100, 45262100, 45261200, 45262690, 45261900, 90650000, 45262660

2.1 Repair of the roof of the school building Youth Education Centre in Kozmin Wielkopolski. Description of the order 1) The contract is for repair of the roof of the school building Youth Education Centre in Kozmin Wielkopolski. Klasztorna 39 Klasztorna in Koźmin Wielkopolski at monastery complex register of monuments under the number KI-N- 885/36/60 of 06.06.1960 r. The project is aimed to stop the progressive degradation of the construction and replacement of the roofing material not harmful to health and the environment and, where possible, restore the original appearance of the object. The project aims to restore the building leaks and prevent further degradation of the roof elements. 4) The overhaul includes the following works: a) the demolition of the roofing and sheathing and waste wood flooring on the second floor b) the repair of the structure and coverage of dormers c) The exchange marked on the drawing rafters and the necessary structural elements initially included in the project - necessary to verify after complete their pit d) cleaning, maintenance timber battens e) the demolition and przemurowanie parts of chimneys f) to perform the impregnation of wooden structure fireproof and antifungal agents g) the installation of vapor-permeable foil h) the performance of roof hatches in the area of ​​chimneys and) installation of tiles j) assembly trims and gutter of sheet titanium-zinc k) assembly of the floor of wooden planks 5) The total area and attic storey height, determined on the basis of the inventory 154.05 m2 / hmax = 2.84 m 300.20 m 2 / hmax = 2.87 mc) building area of ​​300.20 m2 d) the maximum width of the front façade 23.70 Me) maximum width of the side elevation 17.40 m 6) A detailed description of the order shall specify: Project documentation constituting Appendix 1a hereto STWiOR- constituting Appendix 1b hereto bill of quantities - constituting Appendix 1 hereto c 7) the Contractor within the framework of the contract is obliged to carry out all preparatory work, cleaning (development site, maintenance facilities construction, construction site clean-up and restoration of ambient) and any other actions necessary for the proper performance of the contract and use by the Purchaser. Securing the land should be carried out in the manner specified in the Technical Specification of performance and acceptance of works. 9) Due to the nature center (center closed) work should be organized in such a way as to exclude any unwarranted dismissal of a pupil. The Contractor shall ensure proper organization of work to the requirements, laws and regulations and fire safety. For materials for which according to law are not required technical approvals, certificates or declarations of product conformity with the relevant approval or proper Polish norm may be submitted in ITB technical recommendation authorizing the use of the above. materials in construction. The use of materials not corresponding to the requirements of Polish Standard and BS EN and the other characteristics than those specified in the draft 10 of the Act of 7 July 1994 Construction Law 13) Requires a minimum guarantee for performed work (materials and labor) is 36 months from the date of defect-free reception end. One of the criteria for evaluation of tenders is the period for which the contractor will extend the warranty. The exact warranty period will be determined after the selection of the offer representing the best balance of evaluation criteria, ie. Price and extended warranties 14) Along with the notification of completion of works, the Contractor shall submit in the form of permanently tense all documents relating to the contract made among others: warranty documents, documents confirming the quality of materials and equipment used to perform the object of the contract, other documents collected during the execution of the contract, and relating to its implementation, especially drawings marked change from the task, 15) The Contractor shall be fully liable for any damage caused by his actions or omission and is obliged to repair them at his own expense. 16) The contractor is responsible for the quality of performed works, the safety of all activities on the site, the methods used in the construction or its compliance with STWiOR and orders issued by Supervisor. 17) Work covering the implementation of the order should be carried out in a manner least disruptive to the environment taking into account the hours of curfew. The basis for the invoice is a positive protocol partial or final acceptance of the work certified by the authorized representative of the parties (inspector, construction manager). 19) The Contractor shall have appropriate powers gos

Medical practice services

Komenda Wojewódzka Policji w Gorzowie Wlkp. | Published December 16, 2015
Winner
Samodzielny Publiczny Zakład Opieki Zdrowotnej Ministerstwa Spraw Wewnętrznych w Zielonej Górze
cpvs
85121000

The contract is the provision of medical services in the field of occupational medicine. CPV code: 85121000-3 - Medical Services. The contract is: 1) the provision by the Contractor of services in the field of preventive health care and other benefits of occupational medicine for officers and civilian employees of all organizational units of the Police of the province of Lubuskie and organizational units of the Police Headquarters and CBŚP, located in the area of ​​operations Headquarters Provincial Police in Gorzow Wielkopolski., in particular: a) preventive testing and inspection officers; b) preliminary studies and periodic inspection Police employees; c) specialized testing drivers for obtaining a certificate required to drive emergency vehicles; d) stermotorzystów medical examinations; e) medical examinations for the purpose of sanitary-epidemiological; f) vaccinations; 2) the performance of studies and make decisions for the purposes stated in the Labour Code; 3) implementation of the remaining tasks mentioned occupational health services on the activity of the Purchaser, and certain of n. legislation, in particular: a) the participation of a physician responsible for preventive health care committee occupational health and safety, appointed by employers in the Police Lubuskie Province, b) cooperation with employers in the Police Lubuskie province in recognition processes and assessment of the factors in the environment work and ways of performing pracymogących have a negative impact on health, as well as risk assessment in the workplace, c) providing employers and employees in the units of the Police province. Lubuskie advice on work organization, ergonomics, physiology and psychology. According to the Decision No 74 Chief of Police of 19.3.2010 amending decision on preventive health care in the Police, contracts for medical examination may be concluded with entities authorized to provide services in the field of occupational medicine and testing of drivers. 120, as amended. d.). 07.07.2015 and the Decision No. 248/2015 amending the activity of the Police in Gorzow Wielkopolski. Of 15.10.2015 on preventive health care and targeting medical examinations and vaccinations officers and employees of the Police Lubuskie Province, issued by the Employer signed by authorized persons whose model will constitute the annex to the agreement. Contractor is obliged to provide the services to eligible directed by the Purchaser in the indicated their health care facility Contractor meets the conditions specified in the current regulations issued by the minister responsible for health matters, located: a) in respect of Part 1: the administrative area of ​​the city of Gorzow wlkp .; b) For part 2: the administrative area of ​​the city of Zielona Gora. Contractor is obliged to ensure the execution of the services by persons with relevant professional qualifications specified in separate, applicable regulations. Services covered by the contract will be provided by the Contractor in accordance with applicable laws, in particular in accordance with the requirements of: 1502, as amended. d.); OJ of 2014., Poz.1184 as amended. d.); 947, as amended. d.), 332 as amended. d.) and 120 as amended. d.). As part of the agreement the Contractor is obliged to keep medical records, to protect her and sharing in line with 1182, as amended. d.); 159, as amended. d.); 1184, as amended. d.); 1002); 1086, as amended.). 11 .Szacunkowa number of services: A) Gorzow Wielkopolski .: A-1600, B-350, C-120, D-500, E-90, G-500, P-500, SE-216; vaccines: Hepatitis B - 700 doses of tetanus - 700 doses, tick-borne meningitis - 200 doses; B) Green Mountain A-2000, B-400, C-50, D-300, E-30, G-700, P-700, SE-267; vaccines: Hepatitis B - 700 doses of tetanus - 700 doses, tick-borne meningitis - 150 doses; A - preventive examinations officers; B - checkups officers; C - preliminary study employees of the Police; D - periodic testing of employees of the Police; E - checks employees of the Police; G - Research drivers of emergency vehicles and stermotorzystów; P - psychological medical examination of drivers of emergency vehicles and stermotorzystów; S / E - sanitary and epidemiological study. This change will not affect the overall value of the contract. The services will be carried out solely on the basis of referrals issued by the Employer signed by authorized persons whose design will be an annex to the agreement. The services will be implemented in all days of the week from Monday to Friday and health care indicated by the Contractor. The Contracting Authority reserves the necessity of informing him of the absence of a medical doctor working with a week

Medical practice services

Komenda Wojewódzka Policji w Gorzowie Wielkopolskim | Published November 20, 2015  -  Deadline November 30, 2015
cpvs
85121000

The contract is the provision of medical services in the field of occupational medicine. CPV code: 85121000-3 - Medical Services. The contract is: 1) the provision by the Contractor of services in the field of preventive health care and other benefits of occupational medicine for officers and civilian employees of all organizational units of the Police of the province of Lubuskie and organizational units of the Police Headquarters and CBŚP, located in the area of ​​operations Headquarters Provincial Police in Gorzow Wielkopolski., in particular: a) preventive testing and inspection officers; b) preliminary studies and periodic inspection Police employees; c) specialized testing drivers for obtaining a certificate required to drive emergency vehicles; d) stermotorzystów medical examinations; e) medical examinations for the purpose of sanitary-epidemiological; f) vaccinations; 2) the performance of studies and make decisions for the purposes stated in the Labour Code; 3) implementation of the remaining tasks mentioned occupational health services on the activity of the Purchaser, and certain of n. legislation, in particular: a) the participation of a physician responsible for preventive health care committee occupational health and safety, appointed by employers in the Police Lubuskie Province, b) cooperation with employers in the Police Lubuskie province in recognition processes and assessment of the factors in the environment work and work practices that may have a negative impact on health, as well as risk assessment in the workplace, c) providing employers and employees in the units of the Police province. Lubuskie advice on work organization, ergonomics, physiology and psychology. According to the Decision No 74 Chief of Police of 19.3.2010 amending decision on preventive health care in the Police, contracts for medical examination may be concluded with entities authorized to provide services in the field of occupational medicine and testing of drivers. 120, as amended. d.). 07.07.2015 and the Decision No. 248/2015 amending the activity of the Police in Gorzow Wielkopolski. Of 15.10.2015 on preventive health care and targeting medical examinations and vaccinations officers and employees of the Police Lubuskie Province, issued by the Employer signed by authorized persons whose model will constitute the annex to the agreement. Contractor is obliged to provide the services to eligible directed by the Purchaser in the indicated their health care facility Contractor meets the conditions specified in the current regulations issued by the minister responsible for health matters, located: a) in respect of Part 1: the administrative area of ​​the city of Gorzow wlkp .; b) For part 2: the administrative area of ​​the city of Zielona Gora. Contractor is obliged to ensure the execution of the services by persons with relevant professional qualifications specified in separate, applicable regulations. Services covered by the contract will be provided by the Contractor in accordance with applicable laws, in particular in accordance with the requirements of: 1502, as amended. d.); OJ of 2014., Poz.1184 as amended. d.); 947, as amended. d.), 332 as amended. d.) and 120 as amended. d.). As part of the agreement the Contractor is obliged to keep medical records, to protect her and sharing in line with 1182, as amended. d.); 159, as amended. d.); 1184, as amended. d.); 1002); 1086, as amended.). 11 .Szacunkowa number of services: A) Gorzow Wielkopolski .: A-1600, B-350, C-120, D-500, E-90, G-500, P-500, SE-216; vaccines: Hepatitis B - 700 doses of tetanus - 700 doses, tick-borne meningitis - 200 doses; B) Green Mountain A-2000, B-400, C-50, D-300, E-30, G-700, P-700, SE-267; vaccines: Hepatitis B - 700 doses of tetanus - 700 doses, tick-borne meningitis - 150 doses; A - preventive examinations officers; B - checkups officers; C - preliminary study employees of the Police; D - periodic testing of employees of the Police; E - checks employees of the Police; G - Research drivers of emergency vehicles and stermotorzystów; P - psychological medical examination of drivers of emergency vehicles and stermotorzystów; S / E - sanitary and epidemiological study. This change will not affect the overall value of the contract. The services will be carried out solely on the basis of referrals issued by the Employer signed by authorized persons whose design will be an annex to the agreement. The services will be implemented in all days of the week from Monday to Friday and health care indicated by the Contractor. The Contracting Authority reserves the necessity of informing him of the absence of a medical doctor working with a week

Industrial machinery

Zakład Utylizacji Odpadów Sp. z o.o. | Published May 13, 2015
Winner
ARCON POLSKA Sp. z o.o.
cpvs
42000000

The contract is for: - the supply of brand new, never unused and undamaged never before delivery of machinery and equipment under the project: "Development and modernization of the Department Małyszyńska 180 - Phase III Extension of the scope of the purchase of tangible fixed assets necessary for the implementation of the project- Supply of machinery and industrial equipment ", within parts: Part I - The subject of the contract is the delivery vehicle for the purposes of hook-type handling of municipal waste in the RIPOK-in, according to a detailed description of the object of the contract contained in Volume II -Szczegółowy of the Contract. The main codes of the Common Procurement Vocabulary (CPV) Motor vehicles 34.14.45.10-6 34.10.00.00-8 vehicles for refuse Episode II - the subject of the contract is to supply chargers to handle municipal waste on the platform parties, according to a detailed description of the object of the contract contained in Volume II -Szczegółowy of the Contract. The main codes of the Common Procurement Vocabulary (CPV) 43.25.00.00-0 Front loaders Episode III - subject of the contract is the delivery of equipment for pre-shredding bulky waste, according to a detailed description of the object of the contract contained in Volume II -Szczegółowy of the Contract. The main codes of the Common Procurement Vocabulary (CPV) Industrial machinery 42.99.61.00-5 42.90.00.000-6 Crushers - conduct performance test in accordance with the terms of the agreement contained in Volume III of the Terms of Reference, - the training of personnel designated Employer (no limit on the number of people) - performance of their obligations under the guarantee, - an indication of authorized service centers authorized by the manufacturer to perform warranty service. Employer allows partial bids for various parts of the contract the Contractor is obliged to perform the contract in accordance with the minimum parameters set out in the Terms of Reference Volume II - Detailed description of the order, at the same time presenting a statement of minimum parameters required by the Employer, for the parts I to IV. Basic parameters of the contract: a) The Purchaser does not provide for the granting down payments towards the performance of the contract. b) The Contractor is obliged to perform the contract according to the Terms of Reference (ToR), its Annexes and complex tender in accordance with applicable law. Małyszyńska 180, 66-400 Gorzow Wielkopolski., Precinct Chróścik. d) The Contractor is responsible under warranty for physical defects of the agreement existing at the time of the removal operations, as well as defects arising after delivery, but for reasons inherent in made subject of the order. e) If it is found during the existence of the defect removal operations, suitable to remove the Purchaser refuses to receive until you remove the defect. Reaction time - the time counted from the correct transfer of a defect Applications pending the Contractor efforts to determine the causes and to remove disadvantages. g) Maximum time to remove ustaki and repair equipment failure for the part I - IV parties determine to 14 calendar days from the date of notification. h) The Contractor can not free himself from liability under the warranty for defects caused by drawbacks, which he has made or due to improper methods of work performed by the Contractor. i) If the Contractor during the warranty period refuses to take the required steps or is in default in relation to the deadlines set out in the tender documents and in the Contract, the Purchaser may order replacements to make the necessary tasks to a third party at the expense of the Contractor. j) The Contractor shall comply with the principles of promotion projects, as defined for the Operational Programme Infrastructure and Environment 2007-2013, and perform labeling of the order, after consultation with the Employer, and in accordance with the principles set out and posted on the website http: // www.pois.gov.pl/. k) The Purchaser reserves the right to cancel the contract award procedure if funds from the European Union budget, which the Employer intended to use to finance all or part of the order were not granted to him. l) The Contractor shall ensure that the object of the contract provided the Purchaser will be brand new, free from physical defects and covered by a manufacturer's warranty. m) The warranty period will start from the date of signing (without reservations) by both parties acceptance protocol required minimum warranty for every product supplied has been indicated in Volume II of the Terms of Reference - A detailed description of the order. n) Under the guarantee the Contractor is obliged to make warranty inspections, maintenance, including the exchange of relevant controls, necessary to ensure smooth operation, the point of use and consistent with the recommendations Produ

Industrial machinery

Zakład Utylizacji Odpadów Sp. z o.o. | Published February 7, 2015  -  Deadline March 31, 2015
cpvs
34928480

Małyszyńska 180 - Stage III Extension of scope of work for the purchase of fixed assets needed to implement Project- Supply of machinery and industrial equipment "under parts: Part I - The subject of the contract is the delivery vehicle for the purpose of hook-type handling of municipal waste in RIPOK-in in accordance with the detailed description of the contract contained in Volume II of the Contract -Szczegółowy. The main codes in the Common Procurement Vocabulary (CPV) Motor vehicles 34.14.45.10-6 34.10.00.00-8 vehicles for refuse Part II - the subject of the contract is to supply the charger to handle municipal waste on the platform of parties, in accordance with the detailed description of the contract contained in Volume -Szczegółowy II of the Contract. The main codes in the Common Procurement Vocabulary (CPV) Front loaders 43.25.00.00-0 Part III - the subject of the contract is the supply of equipment for pre-shredding bulky waste, in accordance with the detailed description of the contract contained in Volume II of the Contract -Szczegółowy. The main codes in the Common Procurement Vocabulary (CPV) Industrial machinery 42.99.61.00-5 42.00.00.00-6 Choppers Part IV - the contract is for delivery of ten containers in accordance with the detailed description of the contract contained in Volume II of the Contract -Szczegółowy. The main codes in the Common Procurement Vocabulary (CPV) 34.92.84.80-6 containers and bins for waste and garbage - conducting performance test in accordance with the terms of the agreement contained in Volume III of the Terms of Reference, - the training of designated personnel Employer (no limit on the number of people), - performance of its obligations under the warranty - an indication of authorized service centers authorized by the manufacturer to perform warranty service. Employer allows partial bids on the individual parts of the contract the Contractor is obliged to perform the contract in accordance with the minimum parameters specified in the Terms of Reference Volume II - A detailed description of the subject at the same time presenting a statement of the minimum parameters required by the Employer, for the parts I to IV. The basic parameters of the contract: a) The Purchaser does not provide for the granting of the advance payment of the contract. b) The Contractor is required to perform the contract by the Terms of Reference (ToR), its Annexes and complex tender in accordance with applicable law. Małyszyńska 180, 66-400 Gorzow Wielkopolski., Precinct Chróścik. d) The Contractor is responsible under the warranty for physical defects of the subject of the agreement existing at the time of the removal operations, as well as defects arising after delivery, but for reasons inherent in the subject of the order made. e) In case of the removal operations, during the existence of the defect suitable for the removal of refuse collection Purchaser until the removal of the defect. f) In the event of defects, defects after final acceptance after giving notice to the Contractor in writing (e-mail) by the Purchaser is obliged to immediately respond to the notification of the Employer Response Time - the time counted from the correct transmission of the defect entries until the Contractor to take action to determine the causes and to remove disadvantages. g) The maximum time to remove the fault and repair the machine failure for the part I - IV part, provide for 14 calendar days from the date of notification. h) The Contractor shall not be released from its liability under the warranty for defects caused by the disadvantages which he has made or due to improper methods of work performed by the Contractor. i) In the event that during the warranty period the Contractor refuses to take the required action or is in default with respect to the time limits set out in the Terms of Reference, as well as in the Agreement, the Purchaser may have to make the necessary replacement operations to a third party at the expense of the Contractor. j) The Contractor shall comply with the principles of promotion projects, as defined for the Operational Programme Infrastructure and Environment 2007-2013, and the implementation of the labeling of the order, after consultation with the Employer, and in accordance with the principles set out and posted on the website http: // www.pois.gov.pl/. k) The Purchaser reserves the right to cancel the contract award procedure, if the funds from the budget of the European Union, which the Purchaser intended to use to finance all or part of the contract have not been allocated to it. l) The Contractor shall ensure that the object of the contract provided the Purchaser will be brand new, free from physical defects and covered by the manufacturer's warranty. The required minimum warranty for every product supplied has been indicated in Volume II of the Terms of Reference - A detailed description of the contract. n) The warranty Contractor undertakes to making an informed