Purchase of the production line for bread apple fritters with centering
Basic technical parameters and requirements of the people of other equivalent solution:
- Complete system mixing dough mixer equipped with the ability to measure the temperature of the dough and the tipper,
- The possibility of Dough for billets with a weight of approx. 30-100g,
- Hourly output between 20.000 pcs. And 22.0000 pieces.
- Extends in a gentle manner the process of rounding the dough, without compromising its structure,
- A line must fit on the available workspace for a limited length of 72 m and a height of 7m
- Final proofing time: approx. 65 minutes (depending on the performance) while maintaining a temperature and humidity control, irrespective of the environment.
- A line must be equipped with baking and cooling and freezing products in an automatic system,
- Required cooling time: 30 minutes, the required freezing time: 60 minutes.
Exports of mining waste from ZPMW SRK SA KWK "Makoszowy."
Pick loading points located at the mine and transportation of mining waste in the area of stockpile Sośnica. Transport distance up to 10 km.
a) the type and origin of the waste:
The waste (as defined under the Regulation of the Minister of Environment of 12.09.2014 r. Acts. U.2014.1923)) of the points of loading at the Department of Mechanical Coal Processing of the following codes:
01 01 02 - wastes from mineral non-metal ores,
01 04 12 - wastes from washing and cleaning of minerals other than those mentioned in 01 04 07 and 01 04 11.
b) The amount of mining waste to be transported during the period covered by the contract:
A total anticipated collection and transport to 295 163 Mg (an average of 675 Mg / day to 1500 mg / day) of mining waste, including waste storage site at the mine. ".
1. The contract is for the implementation of a package of sanitary services - cleaning and maintenance in the city of Bytom including in particular:
1) the summer and winter maintenance of roads, including roads with nodes, roads and streets provincial, district, municipal and internal road facilities and traffic and pedestrians driving, city squares, parking lots, sidewalks, stairs off-road, bus station, public bus and tram lanes, footbridges and subways, roadsides and areas of green housing estate,
2) the performance of the maintenance and conservation of green spaces, including parks, historic and other green areas listed in the register of monuments,
3) performing work related to the operation and maintenance of playgrounds, outdoor gym, sports fields, fountains, public toilets, toilet portable toilet cabins, shelters, components and objects of small architecture and municipal
4) execution and operation of Christmas decoration city
5) performance of decoration of monuments and places of national memory,
6) the performance of sanitary - cleaning and maintenance and lodging grobownictwa war graves.
2. The package of services covered by the contract is the fulfillment of obligations related to the maintenance of cleanliness and order imposed on the Purchaser in accordance with the provisions of the Act of 13 September 1996. on maintaining cleanliness and order in communes (consolidated text Dz. U. of 2013. item. 1399, as amended. d.) and the Regulation of the Minister of Environment of 27 October 2005. on the types and conditions of use of funds that may be used on the road and public streets and squares (OJ 2005. No. 230, poz.1960).
stage I
1. Design of the technical adaptation of the existing foundation to work with the elements of modernized hoist building hoist shaft "Giant" compartment North.
2. Implementation analysis of technical solutions for the use of existing elements extract.
3. Execution of the projects technical elements of the modernization of hoisting machine:
- The technical project of modernization of the cable drum,
- Technical design pedestals under the stands for the brakes,
- Technical design of brake stands,
- Technical design of power supply and brake control
- Technical design of the electric drive,
- Technical design of the control system of the hoisting machine,
- Technical design of the power supply,
stage II
1. Development of the technical modernization of the hoisting machine - part. II
1. Implementation of the construction project of the modernized building hoist shaft "Giant" compartment North.
2. Implementation of the project of building a multi-branch in his hand.
Water supply by the water supply system to the existing collection points SRK SA Branch KWK Kazimierz Juliusz and discharge wastewater into the sewage system.
stage I
1. Design of the technical adaptation of the existing foundation to work with the elements of modernized hoist building hoist shaft "Giant" compartment North.
2. Implementation analysis of technical solutions for the use of existing elements extract.
3. Execution of the projects technical elements of the modernization of hoisting machine:
- The technical project of modernization of the cable drum,
- Technical design pedestals under the stands for the brakes,
- Technical design of brake stands,
- Technical design of power supply and brake control
- Technical design of the electric drive,
- Technical design of the control system of the hoisting machine,
- Technical design of the power supply,
stage II
1. Development of the technical modernization of the hoisting machine - part. II
1. Implementation of the construction project of the modernized building hoist shaft "Giant" compartment North.
2. Design of multi-discipline construction, together with arrangements modernized hoist.
3. Execution of the projects technical elements of the modernization of hoisting machine:
- Technical design of the shaft signaling,
- Development of the admittance,
- Obtaining assurance reviews and provisions WUG.