Public tenders for environment in Vonyarcvashegy Hungary

Find all Environment tenders in the world.
Finding business opportunities has never been easier.

Results for environment. Make a new search!
EnvironmentHungaryvonyarcvashegy

TOP 3.5.0-09-11-2015-0050 "Vonyarcvashegy, 71st c. Road traffic offload cycle path construction

Vonyarcvashegy Nagyközség Önkormányzata | Published October 19, 2015
Winner
Rent-goo Kft.;VASI MESTER Bt.
cpvs
45233162

Within the framework of the Transport Operational Programme TOP 3.5.0-09-11 scheme with code "Vonyarcvashegy, 71st c. traffic and road relief cycle path construction of Phase I (Lake bike path ridge joining of railway track átvezetve- the "Vonyarc Marina" entrance) "Facing separated by infantry and two-way bike path" Design speed is <20 km h, location, street lighting in residential areas the horizontal lines: length: 125.30 m effective width: 3.75 constructed width (width of cover): 3.97 horseshoes: 2x0.5 arcs, rounding radius arcs: 30.8 to 48.0 cycle track pedestrian traffic cross section tapolca balatonszentgyörgy railway. it built on cycling as well sitting railway stretch between marina and bicycle storage facilities, benches, parking place rain, info table, waste receptacles greenery. altitude design: drop rapid emelkedőnél up 25% six-mh page: single-sided 2.5%, 5% berm ii. phase i stages connected by a promenade next pool u.-i "mini-golf" course at passing football field fence northern side crossings. "two-way path going 2x1 lanes" design speed> 20 km / h, location, public lighting, the horizontal lines in residential areas: Length: 1027.73 m Effective width: 2.50 m Constructed width (width of the cover): 2.50 m Horseshoes: 2x0.5 m Vertical design: Falling Length: variable, min 0.40% drop page: single-sided 2.5% to 5% of the berm rounding bends and curves tailored to realities on the ground, follow the natural terrain of the possibilities offered without significant intervention into the environment. The végszakasznál, with roads ráfordításnál 1.0 m high steel barrier from the elements should be töltésrézsű. Course structure "the first tip. Cover "wearing 8 AC 6 cm (2 layers) 15 cm to 30 cm CKt-T2 sandy-gravel (NHK 0/32-P-TT), Tr = 96% ץ, E2> 60 MN / m2 (MPa) and -Fagyvédő X-ray repair. Loading compacted soil, Tr = 92% ץ, E2talaj> 50 MN / m2 (MPa) "2nd tip. Cover "(I.szakasz-pedestrian area) at 6 cm gray stone background (20x10 cm brick bond) 2.4 BZ 3 cm 15 cm 30 cm CKt-T2 sandy-gravel (NHK 0/32-P-TT), Tr = 96 ץ% E2> 60 MN / m2 (MPa) -Fagyvédő and repair X-ray. Loading compacted soil, Tr = 92% ץ, E2talaj> 50 MN / m2 (MPa)

TOP 3.5.0-09-11 the framework of code scheme "Vonyarcvashegy, No. 71. Road traffic offload cycle route network "

Vonyarcvashegy Nagyközség Önkormányzata | Published October 5, 2015
Winner
Rent-goo Kft. és VASI MESTER Bt.
cpvs
45233162

Within the framework of the Transport Operational Programme TOP 3.5.0-09-11 scheme with code "Vonyarcvashegy, 71st c. traffic and road relief cycle path construction of Phase I (Lake bike path ridge joining of railway track átvezetve- the "Vonyarc Marina" entrance) "Facing separated by infantry and two-way bike path" Design speed is <20 km h, location, street lighting in residential areas the horizontal lines: length: 125.30 m effective width: 3.75 constructed width (width of cover): 3.97 horseshoes: 2x0.5 arcs, rounding radius arcs: 30.8 to 48.0 cycle track pedestrian traffic cross section tapolca balatonszentgyörgy railway. it built on cycling as well sitting railway stretch between marina and bicycle storage facilities, benches, parking place rain, info table, waste receptacles greenery. altitude design: drop rapid emelkedőnél up 25% six-mh page: single-sided 2.5%, 5% berm ii. phase i stages connected by a promenade next pool u.-i "mini-golf" course at passing football field fence northern side crossings. "two-way path going 2x1 lanes" design speed> 20 km / h, location, public lighting, the horizontal lines in residential areas: Length: 1027.73 m Effective width: 2.50 m Constructed width (width of the cover): 2.50 m Horseshoes: 2x0.5 m Vertical design: Falling Length: variable, min 0.40% drop page: single-sided 2.5% to 5% of the berm rounding bends and curves tailored to realities on the ground, follow the natural terrain of the possibilities offered without significant intervention into the environment. The végszakasznál, with roads ráfordításnál 1.0 m high steel barrier from the elements should be töltésrézsű. Course structure "the first tip. Cover "6 cm AC 8 Hound (2 layers) 15 cm CKt-T2 30 cm Sand-gravel (NHK 0/32-P-TT), Tr ץ = 96%, E2> 60 MN / m2 (MPa) -Fagyvédő and repair X-ray. Loading compacted soil, ץ Tr = 92%, E2talaj> 50 MN / m2 (MPa) "2nd tip. Cover "(I.szakasz-pedestrian area) at 6 cm gray stone background (20x10 cm brick bond) 2.4 BZ 3 cm 15 cm 30 cm CKt-T2 sandy-gravel (NHK 0/32-P-TT), Tr = 96 ץ % E2> 60 MN / m2 (MPa) -Fagyvédő and repair X-ray. Loading compacted soil, ץ Tr = 92%, E2talaj> 50 MN / m2 (MPa)
  • 1