Call +44 800 9755 164

Public tenders for environment in Szombathely Hungary

Find all Environment tenders in the world.
Finding business opportunities has never been easier.

Results for environment. Make a new search!

Boating lake and island development environment project

Szombathelyi Parkfenntartási és Temetkezési Kft. | Published June 8, 2015
Winner
BIT-ÉP Bt.
cpvs
45000000

Development of rowing lake environment and the island project, which includes the following tasks: • the walkway around the lake construction, and related gardening, # the culvert construction, # the sun, fishing, establishment, # small lake for fishing jobs creation, # the the island green space development.

Boating lake and island environment development project

Szombathelyi Parkfenntartási és Temetkezési Kft. | Published February 13, 2015
Winner
BIT-ÉP Bt.
cpvs
45000000

Development of the boating lake environment and the island project, which includes the following tasks: a walkway around the lake construction, and related horticultural works, the culvert construction, the sun, the establishment of fishing stands, the establishment of a small lake fishing locations, the island of green space development.

Szombathely Lutheran Church and the Lutheran Church Renovation environment

Szombathelyi Evangélikus Egyházközség | Published November 12, 2014
Winner
BENTATEAM Kft.
cpvs
45210000, 45261210, 45261310, 45421100, 45410000, 45213316, 45342000

Szombathely Lutheran Church and the Lutheran church environment renovation, street fencing transformation and the creation of new site entrance. The object of the procurement, defining the main facilities to be constructed: 1. Strengthen Roofing, roofing replacement 1 2 downpipe plumbers Replacement Windows 3 1 1 4 Front ornamental plaster and plaster repair, and painting plaster 1 5 Footing repair and painting of one piece construction of the sixth pavement utility construction work 1 7 1 8 downpipe New vehicle entrance with 1 piece 9 Fence reconstruction of post-Waterproofing 1 The detailed technical description of the procurement documentation. Based on the "Beneficiaries of information obligations implemented the EU aid projects" Instructions are detailed in the manual image 1 "B" type 300 cm x 150 cm elkészíttetése board and the place of the outsourcing project.

Szombathely Lutheran Church and the Lutheran Church Renovation environment

Szombathelyi Evangélikus Egyházközség | Published October 13, 2014
Winner
BENTATEAM Kft.
cpvs
45210000, 45261210, 45261310, 45421100, 45410000, 45213316, 45342000

Szombathely Lutheran Church and the Lutheran church environment renovation, remodeling and construction of a new fence Street site entrance. The object of the procurement, defining the main facilities to be constructed: first strengthening Roofing, roofing replacement 1 second storm water drainage plumbers Replacement Windows 3 1 1 4 Facade plaster and plaster decorations, repair, and painting plaster plinth 1 5 repair and painting of one piece construction of the sixth flagstones utility construction work 1 7 1 8 rainwater New vehicle entrance with 1 piece 9 renewal of fencing, waterproof covering one piece of detailed technical description of the procurement documentation. According to the "obligation to inform beneficiaries of EU aid implemented projects" Instructions are detailed in the manual image 1 "B" type 300 cm x 150 cm in size elkészíttetése table and the place of the outsourcing project.

Szombathely Lutheran Church and the Lutheran church environment renovation, street fencing transformation and the creation of new site entrance.

Szombathelyi Evangélikus Egyházközség | Published December 17, 2014
Winner
BENTATEAM Kft.
cpvs
45210000, 45261210, 45261310, 45421100, 45410000, 45213316, 45342000

Szombathely Lutheran Church and the Lutheran church environment renovation, street fencing transformation and the creation of new site entrance. The object of the procurement, defining the main facilities to be constructed: 1. Strengthen Roofing, roofing replacement 1 2 downpipe plumbers Replacement Windows 3 1 1 4 Front ornamental plaster and plaster repair, and painting plaster 1 5 Footing repair and painting of one piece construction of the sixth pavement utility construction work 1 7 1 8 downpipe New vehicle entrance with 1 piece 9 Fence reconstruction of post-Waterproofing 1 The detailed technical description of the procurement documentation. Based on the "Beneficiaries of information obligations implemented the EU aid projects" Instructions are detailed in the manual image 1 "B" type 300 cm x 150 cm elkészíttetése board and the place of the outsourcing project.

Szombathely Lutheran Church and the Lutheran church environment renovation, conversion and construction of new road fence site crawler

Szombathelyi Evangélikus Egyházközség | Published December 17, 2014
Winner
BENTATEAM Kft.
cpvs
45210000, 45261210, 45261310, 45421100, 45410000, 45213316, 45342000

Szombathely Lutheran Church and the Lutheran church environment renovation, street fencing transformation and the creation of new site entrance. The object of the procurement, defining the main facilities to be constructed: 1. Strengthen Roofing, roofing replacement 1 2 downpipe plumbers Replacement Windows 3 1 1 4 Front ornamental plaster and plaster repair, and painting plaster 1 5 Footing repair and painting of one piece construction of the sixth pavement utility construction work 1 7 1 8 downpipe New vehicle entrance with 1 piece 9 Fence reconstruction of post-Waterproofing 1 The detailed technical description of the procurement documentation. Based on the "Beneficiaries of information obligations implemented the EU aid projects" Instructions are detailed in the manual image 1 "B" type 300 cm x 150 cm elkészíttetése board and the place of the outsourcing project.

Contract award notice - "A study plans for the area of ​​the leisure center equestrian leisure, sports and events center creation"

SZOVA Szombathelyi Vagyonhasznosító és Városgazdálkodási Zrt. | Published February 24, 2016
Winner
A& D Stúdió Kft. és Rubik Stúdió Kft. mint közös ajánlattevők
cpvs
71220000, 71222000, 71242000, 71243000

Object:
A study plans for the area of ​​the leisure center equestrian leisure, sports and events center establishment
Quantity:
Bidder responsible for preparing two distinct feasibility study for the plant in Szombathely Leisure Centre riding leisure, sports and events center establishment.
Contracting for architectural design, landscape and environment fit, functional layout, expandability, schedule viability, economic factors and building optimal criteria into calls for consideration two versions in study-level proposals, including a study on the basis of which take place in the future to make decisions for the implementation of the project.
A study of two variants each style of modularity and the different size of the project proposal should include that proposal in terms of both project-professional version of the sport needs to be served in the cavalry.
A detailed study of the requirements for documentation.

KEOP 2012-5.6.0 carrying out a project called "Iron County Government Office building energy efficiency investments" related construction works. "

Vas Megyei Kormányhivatal | Published October 2, 2015
Winner
Bereczki Kft.
cpvs
45215222

Subject: "Central government agencies 2012-5.6.0 framework for energy efficiency investments in the Environment and Energy Operational Programme (TOP) project EEOP 5.6.0 / ID No. 12-2013-0039," a project known as Iron County Government Office building energy efficiency investments "related construction works, and carrying out reconstruction works on the facade "Quantity: The main parameters, and the volume of production: Conventional building built in protected mode (local or monument protected) building in 9700, Hollan Erno utca No. 1. During hrsz .: 6294). A contract for a project called "framework 2012-5.6.0 Central government agencies for energy efficiency investments in the Environment and Energy Operational Programme (TOP) project EEOP 5.6.0 / ID No. 12-2013-0039," Iron County Government Office building energy efficiency investments "related completion of construction works as follows: - For felújíthatatlanság palló- 15, 76 gerébtokos window opens external wings of remanufacturing, net 6,465,791, the estimated value of HUF - 12 additional installation of solar net 1,400,000 - £ estimated value - Facade Insulation closing 92 m long, titanium zinc sheet, net 406,456, the estimated HUF value - 225 pieces of various energy-saving lamp placement net 847 116 HUF value - 30 blinds structure demolition, shutter space - 0.073 m³ / piece - a total of 2, 19 m³ insulation material placement fees and make a net 467,516, the estimated value of HUF, a detailed technical description contained in the tender documents. These include in particular, but not limited to the following items: - carrying out the transfer after the working parts of the job done, such as: - preparation of documentation and provision of transmission. - Execution upon completion of the restoration of the staging area for the intended / planned status. - Test run Conduct - staff and equipment to ensure the completion of technical managerial tasks and proper, careful construction management - on-site quality assurance (advance quality planning, quality education, while implementing continuous quality control, final quality control for each working part is finished for the working parts, carrying out successive work sections to coordinate quality, quality control and documentation of materials used) business areas,

"Production and placement-related project called insulating facade elements." KEOP 2012-5.6.0 Iron County Government Office building energy efficiency investments

Vas Megyei Kormányhivatal | Published October 2, 2015
Winner
Bereczki Kft.
cpvs
45000000, 45320000, 45421132

"Central government agencies 2012-5.6.0 framework for energy efficiency investments of the Environment and Energy Operational Programme (TOP) project EEOP 5.6.0 / ID No. 12-2013-0039," a project known as Iron County Government Office building energy efficiency investments "related facade insulation Production and placement of elements "main parameters, and the volume of production. Traditional building built in protected mode (local or monument protected) building in 9700, Hollan Erno utca No. 1. During hrsz .: 6294). A contract for a project called "framework 2012-5.6.0 Central government agencies for energy efficiency investments in the Environment and Energy Operational Programme (TOP) project EEOP 5.6.0 / ID No. 12-2013-0039," Iron County Government Office building energy efficiency investments "related Production and placement of thermal insulation facade "as follows: Production and Placement • 1 tokszerkezetű wooden facade thermal insulation material-dependent corridor 36 m length and charge composition, net 6,450,000, the estimated value of HUF detailed specifications in the tender documentation. These include in particular, but not limited to the following items: • following the completion of transfer work areas of work, such as: the preparation of documentation and provision of transmission #. # Implementation Upon completion of the restoration of the staging area for the intended / planned status. Completion of conducting # Test run • Technical management duties and the professional and careful construction management personnel and technical ensure • on-site quality assurance (advance quality planning, quality education, while implementing continuous quality control, final quality control for each working part is finished for the working parts, carrying out successive work sections to coordinate quality, quality control and documentation of materials used) business areas,

Contract award notice - 4_Megvalosithatosagi_tanulmany

SZOVA Szombathelyi Vagyonhasznosító és Városgazdálkodási Zrt. | Published August 26, 2015
Winner
BDO Magyarország Hotel és Ingatlan Szolgáltató Kft.
cpvs
71241000

Subject: immediate vicinity of the lake of its services making use of all or part of the local tourism infrastructure preparation and hotels specified in the study, the operator of finding the maximum extent appropriate and substantiating the information available and provide a realistically achievable service offerings synergistic optimum hotel establishment of a feasibility study Quantity: immediate surroundings lake, its services partly or fully exploit the local tourism infrastructure to the maximum extent appropriate and preparation and hotels specified in the study, the operator of exploration available, as well as underlying property offers a realistically achievable service offerings synergistic optimum establishment of a feasibility study on the implementation of the following tasks: feasibility study as defined procurement as the subject taking into account the obligations imposed on the overall procurement specification range of structural and content architecture defined in this subsection compliance with the maximum professionalism which should be ready in such a way that the completed and approved by the contracting study must be suitable to take investment and operation managers decisions. The contractor should follow basic standards set out below, however, allowed to make changes to the individual chapters and sub-chapters address the structural study any allowance for expansion, if technically justified; But not only entitled to - not to leave items of content required by the contracting authority. A feasibility study on the expected structure and content structure: Summary Executive Summary 1.1 the most important components of hotel project proposals 01.02 brief, essential summary of the study results (why was this study, what is the problem to be solved, justification of the hotel building) 1.3 Fit the lake of development programs and ideas Results 1.4 Appraisal Brief Summary 1.5 Operator and financing environment 1.6 Technology - investment advice, Summary Hotel Presentation Presentation of the market environment Szombathely and the region near market demand and supply trends (according to CSO statistics) Szombathely and the region determining hotels in the presentation (opening date, owner, operator, capacity planned and services, key performance indicators estimates, critical remarks) Szombathely and the area of ​​new hotel projects Mapping (planned year of opening, determination developer, operator, number, features rooms) Market gap, hotel development, justification of support, defining the main objectives Location and project evaluation of the proposed project sites presentation, proposing the most suitable placement, SWOT analysis of the planned hotel project opportunities for the presentation of the project justification presentation (economic, trade, logistics, sports, leisure and cultural trends of the town, a short description of the characteristics of the proposed project in connection with the natural and built environment, Analysis of the planned hotel significance) Risk analysis (preparation of market, environmental, etc.) Conceptual design 4.1 professional development program for the planned hotel by following key indicators, along parameters: Description • market positioning against competitors USP (Unique Selling Proposition - a unique selling advantage ) presenting unique ideas, conceptual solutions • Presentation of theme hotel classification (based on the classification system Hotelstars formulated criteria / source: hotelstars.eu/) the number of room configurations (room types, floor space) • rooms; • Type of catering, size, capacity, configuration; • Number of conference rooms, configuration, capacity; • wellness / fitness / spa facilities and capacity; • Other services (rental, parking, laundry, business corner, etc.) • Net and gross floor areas, guest rooms and service areas the proportion of aggregate Where contracting requirements on elements determined, which are not included in the Hotelstars classification system, in the event separately subchapter. 4.2 4.1. technical advice based on detailed work program described above, a simplified capital cost estimate (without the proposed location regardless of land purchase), investment advice, pre-- financiers and operators rulings suitable - 3D renderings preparation of a preliminary land use plans, a brief technical description and mass-raising r

Rába river restoration works following the 2014 flooding

Nyugat-dunántúli Vízügyi Igazgatóság | Published December 9, 2015
Winner
Meliorációs és Rekultivációs Kft.
cpvs
45246000, 50500000

"Follow the River Rába 2014 floods recovery work" to be carried out construction work, services and amounts: - Raba River Sárvári flood stages: 1. Raba left bank embankment of the 2 + 800 and 3 + 660 and 5 + 350 and 7+ Between 193 tkm filling gravel improvement (270 m3) 2 Raba left bank embankment 0 + 837 tkm szelvénynél Cute worth improving locks: improving side cladding concrete surface, the pump position concrete structure to improve (1) 3. Raba bp of charge 5 + 356 tkm szelvénynél the Beaded spillway sluice enhancement: the bottom of the hopper to improve the water tightness of the concrete pavement and repair mederrézsű cover (1) - Raba River Körmendi flood stage: 4 Raba left bank embankment 1 + 600-2 + ​​280 and 2 + 300-4 + 400; Raba right bank embankment 0 + 000-0 + 620; on the left bank of Pinka 0 + 000-3 + 100; Pinka left river stretches between 3 + 700 and 5 + 100 tkm s filling gravel Memorandum (1580 m3) 5. Raba left part 2 + 557 tkm szelvénynél the Smelly Árki lock pavement restoration (20 m2) 6. Raba 158 + 166 and 158 + 216 Between fkm Raba right bank embankment slippage of restoration and padkakotrás the vicinity of the slip (50 m) 7. Rába 162 + 400 river km Csörnöc vízpotló channel leaching restoration and dredging (200 m, 200 m 2) 8 Raba mederrézsű between 159 + 500 rkm Recovery ( 20 m) 9. Raba: 0 + 852 trenches in (Grit stream) locks next to 86 main road, 2 + 280 tkm Volan works sluice 2 + 557 Smelly Árki lock, 3 + 914 Berki lock, PINK: 3 + 833 Magyarnádalja I floodgates, Red Stream: Vasszentmihály No. 3. sluice enhancement: felhúzószerkezet, wedging, threshold and repair of concrete surfaces, replacement frame, gumizás, corrosion protection (6) - Raba River Szentgotthárdi flood stage: 10. Rézsű restoration of Raba 206 + 380 river km segment of the environment (30 m3) 11. A bulking spillway kövezésének Restoration (120 m2) Lapincs left bank charges 12 039 0 + szelvénynél Budget sluice enhancement: improving steel structures, creation waterproofing (1)

Rába river restoration works following the 2014 flooding

Nyugat-dunántúli Vízügyi Igazgatóság | Published October 21, 2015
Winner
Meliorációs és Rekultivációs Kft.
cpvs
45246000, 50500000

"Follow the River Rába 2014 floods recovery work" to be carried out construction work, services and amounts: - Raba River Sárvári flood stages: 1. Raba left bank embankment of the 2 + 800 and 3 + 660 and 5 + 350 and 7+ Between 193 tkm filling gravel improvement (270 m3) 2 Raba left bank embankment 0 + 837 tkm szelvénynél Cute worth improving locks: improving side cladding concrete surface, the pump position concrete structure to improve (1) 3. Raba bp of charge 5 + 356 tkm szelvénynél the Beaded spillway sluice enhancement: the bottom of the hopper to improve the water tightness of the concrete pavement and repair mederrézsű cover (1) - Raba River Körmendi flood stage: 4 Raba left bank embankment 1 + 600-2 + ​​280 and 2 + 300-4 + 400; Raba right bank embankment 0 + 000-0 + 620; on the left bank of Pinka 0 + 000-3 + 100; Pinka left river stretches between 3 + 700 and 5 + 100 tkm s filling gravel Memorandum (1580 m3) 5. Raba left part 2 + 557 tkm szelvénynél the Smelly Árki lock pavement restoration (20 m2) 6. Raba 158 + 166 and 158 + 216 Between fkm Raba right bank embankment slippage of restoration and padkakotrás the vicinity of the slip (50 m) 7. Rába 162 + 400 river km Csörnöc vízpotló channel leaching restoration and dredging (200 m, 200 m 2) 8 Raba mederrézsű between 159 + 500 rkm Recovery ( 20 m) 9. Raba: 0 + 852 trenches in (Grit stream) locks next to 86 main road, 2 + 280 tkm Volan works sluice 2 + 557 Smelly Árki lock, 3 + 914 Berki lock, PINK: 3 + 833 Magyarnádalja I floodgates, Red Stream: Vasszentmihály No. 3. sluice enhancement: felhúzószerkezet, wedging, threshold and repair of concrete surfaces, replacement frame, gumizás, corrosion protection (6) - Raba River Szentgotthárdi flood stage: 10. Rézsű restoration of Raba 206 + 380 river km segment of the environment (30 m3) 11. A bulking spillway kövezésének Restoration (120 m2) Lapincs left bank charges 12 039 0 + szelvénynél Budget sluice enhancement: improving steel structures, creation waterproofing (1)

Change Treaty - the square in front of St. Martin's Church renovation of administrative licensing, to obtain the building permit full and complete implementation plans, to ensure the technical management planning.

Szombathely Megyei Jogú Város Önkormányzata | Published December 9, 2015
Winner
Litkei Építésziroda Kft.
cpvs
71220000

Subject square in front of St. Martin's Church renovation of administrative licensing, to obtain the building permit full and complete implementation plans, to ensure the technical management planning. Quantity: planning tasks: Preparatory works: - Concept Plan Preparation: accurate demarcation of the areas to be renovated. - Utility genplán Preparation: In parallel with the concept plan and in accordance with the preparation of combined utility development proposal (un genplán.) Based on the utility service providers of investors and professional consultations, the renovation, induce and newly-built utility lines realignment of boundaries and construction works chronology determination. - Design base map preparation: Preparation Planning basemap supplementing the existing geodetic measurement. Making full preparation of design documentation for building permit before St. Martin's Church Square in the Design task of renovating the historic environment (road and housing construction, utility construction documentation) for approval and implementation plans. The discipline-specific design work by authorized personnel, with the necessary expertise to perform. Major design tasks: - preparing the square in front of Saint Martin's church renewal of the authorization and detailed design documentation in a way that accessibility of the square next to the square and institutions with a motor vehicle to be insured. - On Street furniture, equipment and other elements of the preparation of the plaza building permit and detailed design documentation. - Preparation of rainwater drainage plan approval and construction documentation. - Preparing Public lighting and electricity network and export licensing terv¬doku¬mentációjának. - Landscaping and automatic irrigation network construction plan preparation of construction documentation. - The surveillance system of export licensing and design documentation can not be made only on the general plan should be included in the new location for an existing camera, if necessary move. Other Services: - preparation of site plans called for forming - preparation of utility reconstruction, replacements, new wiring (drinking water, storm water, sewage, gas, heating, telecommunications) permit and construction plans. Other design tasks: - Design of respect to get involved in the planning areas of the necessary contributions, especially the owners of the affected areas, managers of public utility service providers. According to the provisions of Government Decree and the relevant European directives, as well as taking into account those Hungarian harmonizing regulations and standards, in compliance with environmental regulations in force in the construction plan your products! Customer further planning in respect of the right to have an opinion and approval. The presentation of the plans, answer questions, at least 2 hours duration are available. If due to inefficiency or remedy procurement procedure for the execution of works to be repeated, the technical content and the evaluation of the budget must be carried out again, the opinion reiterates be given until after the effective procurement process construction contracts will take place. - If, during the intermediate and follow-up audits on issues concerning the project documents prepared by the Planning arise inspectors on behalf of the Director is required to be available by the end of the project monitoring obligation tolerance period. All coverages plan some budget chapters form is required. The Customer is entitled to the design documentation and preparatory work to monitor, to ask for the work done lots of information, relating to the design and documentation point of view to take a stand on issues important to them. The purpose of authorization shall be made according to official plans, specialized authorities and utility operators demand copies.

Information on the outcome - SIOP-2.2.6-12 / 1B-2013-0014 - "integration of outpatient and inpatient care Markusovszky the University Teaching Hospital in Szombathely and Körmend premises" - to carry out construction works of Körmend site

Markusovszky Egyetemi Oktatókórház | Published May 29, 2015
Winner
ZÁÉV Építőipari Zrt.
cpvs
45000000, 45100000, 45200000, 45300000, 45400000

A contract to the SIOP-2.2.6-12 / ID No. 1B-2013-0014, "the integration of outpatient and inpatient care Markusovszky the University Teaching Hospital in Szombathely and Körmend premises" Körmendi site required by implementation of the project construction work at SIOP 2.2.6- 12 / 1B 2013-0014 of SEQ ID NO needed to carry out "outpatient and inpatient care Markusovszky integration of the University Teaching Hospital in Szombathely and Körmend premises" in implementation of the project implementation works as follows: No. 5. below) for the builder. Technically parts of the building organically linked, discussions took place during the planning, but also a necessary co-ordination in the implementation of tasks for the development of the two areas, especially in the front, building engineering, building electricity, and especially to meet the fire regulations. Building Contracting perform evacuation, pass empty Contractor. Architecture: The ground floor of the farm building was constructed in the central part locker room, laboratory block and two medical rooms. (1310m2) I was raised housed in the specialized outpatient, patient recruitment and blood collection office space associated with the premises. (1370m2) in the II-th (775m2) and III-th floor (720m2) in the chronic internal medicine department, IV.-th floor (720m2) and was placed in the surgical department. VI floor (268m2) and mechanical engineering (565m2) loft is located. The building total net usable area of ​​6563m2. The building is full accessibility of reality. Building services engineering, ventilation and air conditioning technology: within the projected water pipes building: under the base lines utility tunnel and the respective levels ceiling, moving above the ceiling, the take-off established for this purpose a vertical shaft, the branch lines are also under the canopy, above the ceiling or in the water equipment downtime than szerelendőek wall. The rainwater evacuation of the building will be constructed separately from the waste water, the use of existing connections. Fresh air ventilation systems control is carried out on the basis of the supply air temperature. Total heat demand: 471 kW. The demand for cooling room of the hospital provide top level specially designed for this purpose compact chillers to be installed. The exhaust air is blown over the roof to the outside. Operating rooms and air-conditioning system serving the premises of the room environment carried out by central air handling units on the roof synth engine casing. The upper and lower operating theaters suction, exhaust service spaces the upper used. Building wiring, weak power: The offices were designed for patient call system areas of the hotel is modern nurse call systems. The HVAC equipment with its own automatic, error signal indicating failure must tableau the dispatcher center. The building gets a new lightning protection equipment to reduce the harmful effects of lightning pulses harmonized surge suppression system will be installed. Issued in the framework of the process design tasks quantities in short, for the facade program: 2750 m2 of facade window installation: 730 m2 Elevator renovations or installation: floor area affected 3 Total net refurbishment 6563 m2 Operating remodeling and renovation: 3 Option items: Office No ARCHITECTURE OPTION 1 TOTAL (aluminum doors and windows surcharge) OPTION 2 TOTAL TARKETT premium grade PVC jacket: OPTION 3 OPTION TOTAL glass cloth wallpaper wall coating 4. All Ages classroom ceiling 5. OPTION TOTAL southwest front ground floor - IV. floor area between wall screens a total of 1-2 as facade cladding design plan premium Architecture Options: ALL ELECTRICAL POWER SUPPLY BUILDING Building wiring option Medical Services Medical Devices gas 6: 225th § (1) and 6: 226th § rules apply.
  • 1