Call +44 800 9755 164

Public tenders for environment in Paks Hungary

Find all Environment tenders in the world.
Finding business opportunities has never been easier.

Results for environment. Make a new search!

Paks Nuclear Power Plant 1-4. Reactor Unit System TELEPERM XS System upgrade of the implementation - of Contract award

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published November 23, 2015
cpvs
45453100, 48000000, 48100000, 45314320

Paks Nuclear Power Plant 1-4. Reactor Unit TELEPERM XS system upgrade extent of implementation of the following: • 6 Replacing the TELEPERM XS Software Release 2.38 CORE Space CORE system TELEPERM XS Software Release 3.6.x version of the development environment, the environment of the representative configuration and 1-4. Unit RVR environment. A regime change is associated with 7 pieces of HP-Unix computers based service (SU) advanced replacement of SUSE Linux-based PCs in all relevant environments. • Replacing 10 Gateway (GW) computers on the TXS software side 1-4. RVR Unit and the RC environment. (A-side software BSZG BSZG made under the reconstruction project.) • 6 x Universal Test System (UTS) set TXS modernization to reflect the new environment. • Modernization 1 RC drivers to the new computer system TXS environment. Updating • 1 simulator instructor RVR model to reflect this change. The task includes the following activities: • The conversion process, design verification and validation (V & V) activities (Quality Assurance Plan), subject to the NSC and the HAEA 1.5. No guide for specifications. • the technical design of the conversion. • Supporting the development consent procedure. • The purchase of hardware and software tools necessary to develop. • User-level programming courses. • Conducting the migration process, the development environment. • The operator and maintenance personnel training. • Changing the operating and maintenance documentation concerned. • A streamlined installation of the RC Driver RC environment. • The SU and GW UTS and installation of the units, installation of all affected environment. • Support for the V & V activities.

Grain silos in the context of the construction of TOP 4.7.0-15-2015-0021 identification number of applications under the terms of a contract - 2.sz.szerződésmódosítás

Cereal Agrilogistics Kft | Published January 8, 2016
Winner
HEVESGÉP Kft.
cpvs
45223000, 45112400, 45262310, 45310000, 45331210

Procurement subject: Grain storage silos on the basis of the framework conditions for the construction of SEQ ID NO TOP 4.7.0-15-2015-0021 tender a contract. Public procurement quantity: Substructure: -420 m3 trench excavation -240 m3 of reinforced concrete bar - foot - disc with basic preparation -1 klt deep foundation preparation -2 klt reinforced concrete substructure metal silos install a ventilation system incorporating a complete Body (technology) 2 new - 1321 m3 capacity - metal silo construction, the associated technology, on-site installation or the necessary technological and electrical works. Bidders' attention: a detailed definition of the tasks of the technical and quality requirements imposed on materials, design documentation volumes sent as an attachment to the RFP documentation, technical description, unpriced budgets and construction permit with the reservation number 201500032029 ÉTDR ügyazonosító included. The contractor responsible for carrying out the technical content required under the construction plans and building permits occupied. The investment does not provide a margin Contracting present. The contractor is also responsible for: surveillance of the working area required; Preparing measurable architectures -all temporary construction of water supply and electricity supply and inspection of construction projects required; -all Administrative, technical, or other tasks that transfers the Customer is required to construct plans set out in the state; -the completed facility contract law, proof of authorization conformity, -all preparing a document that the conduct of the operation of the facility, safe operation / use necessary -üzempróbák; and transfer of information and preparation of as-built plans, and the preparation and transmission of necessary occupancy permit submission of documentation to the Customer, shape and number of copies specified by the Customer; -all formed in connection with construction work, demolition debris and construction waste collection and removal, after completion of work orders status before the start of construction staging areas involved in the restoration of proper execution; of the environment, caused environmental damage in buildings, repair the damage and supplying the warranty obligations;

Grain silos in the context of the construction of TOP 4.7.0-15-2015-0021 identification number of applications under the terms of a contract - No. 1. contract modification

Cereal Agrilogistics Kft | Published December 18, 2015
Winner
HEVESGÉP Kft.
cpvs
45223000, 45112400, 45262310, 45310000, 45331210

Procurement subject: Grain storage silos on the basis of the framework conditions for the construction of SEQ ID NO TOP 4.7.0-15-2015-0021 tender a contract. Public procurement quantity: Substructure: -420 m3 trench excavation -240 m3 of reinforced concrete bar - foot - disc with basic preparation -1 klt deep foundation preparation -2 klt reinforced concrete substructure metal silos install a ventilation system incorporating a complete Body (technology) 2 new - 1321 m3 capacity - metal silo construction, the associated technology, on-site installation or the necessary technological and electrical works. Bidders' attention: a detailed definition of the tasks of the technical and quality requirements imposed on materials, design documentation volumes sent as an attachment to the RFP documentation, technical description, unpriced budgets and construction permit with the reservation number 201500032029 ÉTDR ügyazonosító included. The contractor responsible for carrying out the technical content required under the construction plans and building permits occupied. The investment does not provide a margin Contracting present. The contractor is also responsible for: surveillance of the working area required; Preparing measurable architectures -all temporary construction of water supply and electricity supply and inspection of construction projects required; -all Administrative, technical, or other tasks that transfers the Customer is required to construct plans set out in the state; -the completed facility contract law, proof of authorization conformity, -all preparing a document that the conduct of the operation of the facility, safe operation / use necessary -üzempróbák; and transfer of information and preparation of as-built plans, and the preparation and transmission of necessary occupancy permit submission of documentation to the Customer, shape and number of copies specified by the Customer; -all formed in connection with construction work, demolition debris and construction waste collection and removal, after completion of work orders status before the start of construction staging areas involved in the restoration of proper execution; of the environment, caused environmental damage in buildings, repair the damage and supplying the warranty obligations;

Grain silos in the context of the construction of TOP 4.7.0-15-2015-0021 identification number of applications under the terms of a contract - results

Cereal Agrilogistics Kft | Published December 21, 2015
Winner
HEVESGÉP Kft.
cpvs
45223000, 45112400, 45262310, 45310000, 45331210

Procurement subject: Grain storage silos on the basis of the framework conditions for the construction of SEQ ID NO TOP 4.7.0-15-2015-0021 tender a contract. Public procurement quantity: Substructure: -420 m3 trench excavation -240 m3 of reinforced concrete bar - foot - disc with basic preparation -1 klt deep foundation preparation -2 klt reinforced concrete substructure metal silos install a ventilation system incorporating a complete Body (technology) 2 new - 1321 m3 capacity - metal silo construction, the associated technology, on-site installation or the necessary technological and electrical works. Bidders' attention: a detailed definition of the tasks of the technical and quality requirements imposed on materials, design documentation volumes sent as an attachment to the RFP documentation, technical description, unpriced budgets and construction permit with the reservation number 201500032029 ÉTDR ügyazonosító included. The contractor responsible for carrying out the technical content required under the construction plans and building permits occupied. The investment does not provide a margin Contracting present. The contractor is also responsible for: surveillance of the working area required; Preparing measurable architectures -all temporary construction of water supply and electricity supply and inspection of construction projects required; -all Administrative, technical, or other tasks that transfers the Customer is required to construct plans set out in the state; -the completed facility contract law, proof of authorization conformity, -all preparing a document that the conduct of the operation of the facility, safe operation / use necessary -üzempróbák; and transfer of information and preparation of as-built plans, and the preparation and transmission of necessary occupancy permit submission of documentation to the Customer, shape and number of copies specified by the Customer; -all formed in connection with construction work, demolition debris and construction waste collection and removal, after completion of work orders status before the start of construction staging areas involved in the restoration of proper execution; of the environment, caused environmental damage in buildings, repair the damage and supplying the warranty obligations;

Occupational health services amending the Prospectus contract

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published October 16, 2015
Winner
NUKLEO-MED Foglalkozásegészségügyi Központ Foglalkozásrgészségügyi és Járóbeteg Szolgáltató Korlátolt Felelősségű Társaság
cpvs
85100000, 85147000, 85145000, 85121000

Occupational health services Occupational health services (including laboratory tests) providing for the Paks Nuclear Power Plant Zrt. The employee, in this context, completing 2,800 job aptitude test year, the tests of the year every working day of the executed and daily intervals specified in the documentation that amount Contracting It may differ from -20 percent. Distribution of the occupational health department of job aptitude test "A", "B", "C" and "D" as follows: "The term" occupational health department 80%; Occupational health class "B" 1%; "C" occupational health department 15%; Occupational health class "D" of 4%. 25) NM regulation) PROVIDED BY: 01.01 33/1998 on the job, career or personal hygienic suitability of the medical examination and opinion on. (. VI.24) NM defined in Regulation (.. 33/1998 (VI.24) Regulation NM), according to the order and initiate the necessary studies specialist job aptitude tests; keeping up to date for suitability tests. 1.1.2 ADDITIONAL ELIGIBILITY TEST FOR JOB 33/1998. Except as required REVIEW NM REGULATION (VI.24.): Laboratory tests - including blood sampling, dispatch (not on-site laboratory assessment) and the evaluation of laboratory results. # Drug-free status verification (preliminary job aptitude tests as part of extraordinary provisions made on the basis of FIB201 tests based on random selection pressure); # Exercise ECG test (the armed security guards examination of physical fitness) 25.) NM in addition to those set out in Regulation covers the following: # of health workers preparing documentation and continuous management of occupational health computerized filing system; # Supply management tasks for the treatment of musculoskeletal rehabilitation; # Status of patients in excess of 30 days sick leave, referred to the hospital's state of health, the placement of monitoring the continuation of the hospital doctors consultation; To ensure the rapid test is needed to diagnose early pregnancy # women of childbearing age for the job, career or personal hygienic suitability - medical examination and opinion of 33/1998 on. In case of employment of materials (8) marked according to Annex 8 NM (VI.24.); # Enable entry into the territory of Paks Nuclear Power Plant Permit applications; # Does not record job tasks carried out by the Offeror of occupational health information system (for radiation hazardous working conditions); # Creating an occupational health service accounts year after year to the date of February 15; Evaluation of employees who received a dose of radiation load and initiate any further investigations. XCIII of 1993 on occupational health, -fiziológiai, comfort, health services (8 hours a week) 2.1 The involvement of occupational health services on occupational safety and health. performing payroll tasks listed in § 58 of the Act-in. HEALTH PROFESSIONAL WORK ACTIVITIES QUALIFY UNDER THE TASKS WITH CONTRACTING initiative and agreed manner: # participation in facilities, machinery and equipment put into operation preliminary work on security aspects; # Participation of personal protective equipment, devices, jeopardizing the proper use of technology in the course of the investigation; # Contribution use of safety devices, medical fitness conditions and limitations of PPE use in determining health; # Assistance in preparing educational materials specified Work Safety Regulations; # In case the Tender contribution, ad hoc working conditions between Work Safety Regulations are not regulated in determining the type of protective equipment is needed; # Participation in workplace risk assessment; # Occupational health contribution in shaping the content of a prevention strategy, internal order # contribution of personal protective equipment allowance opinion of the selection of personal protective equipment; # Participation agreed upon with the contracting organization occupational health checks, driver's visitations; # Propose the establishment of the conditions necessary for first aid; # Occupational health in the work of the Commission participation. HYGIENE ASSESSMENT OF THE WORK - THE HARMFUL HEALTH RISK FOR DETERMINING AND MONITORING FOR - THE CONTEXT: # pathogens in the working environment (physical, chemical, biol

Renovation of refueling machine camera system - Contract award procedure

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published December 4, 2015
Winner
OKTEL Kft.
cpvs
45317000, 45315600, 45314300, 32231000

Exposed to radioactive radiation environment interior camera system and closed-circuit camera system installation run - during the decommissioning of the existing 2 analog closed-circuit camera system water. - Supply and delivery of 2 completely new closed-circuit camera system (operating under water camera system two piece, two pieces of dry conditions, camera operating system). - Supply and delivery of the necessary startup 1 backup camera under water. - To install the necessary components to manufacture and transport units. - Remote control function to ensure the transport (4080 m) Video and data cables. - Installation work preparing quality plan. - 2 Camera System Installation on the basis of the I-II Extension rods belonging to the átrakógépekhez TV and átrakógépekre the export plan. - Startup. - Remote control function without building / trace line cabling / installation and the necessary remote control units. - Contribution under the operating tests. Requirements underwater camera system parameters Requirements: Parameter camera under Expected Specs typical pressure-resistant design Water Protection IP68 Power supply low voltage radiation 1.000 Gy / h dose rate, total dose 1,000,000 Gy Images monochrome or color images at 550 TV lines / 50Hz Output Composite Light Sensitivity ≤ 25 lux Pitch Angle min. ± 120 ° (240 ° tilt range, 0 ° to the vertical downward direction) 5 ° / sec 3x zoom, remote-controlled 4 bar Auxiliary Light Outside, the camera body off, remote on / off switchable and dimmable 50 ° C Dimensions ~ 600x600x600mm Fixing to Cabling holding device on the bottom bar several points soluble existing TV cable connection; bending radius foolproof, without any tools, easy, accurate, connect industrial stekkerekkel Cabling water resistance very 40kg) Cabling r ≤ 120 mm, with occasional agitation Requirements operated in dry conditions, camera system parameters Requirements: Parameter Expected Specification Typical operating under dry conditions thumbnail camera protection IP65 Power supply low voltage radiation 1 Gy / h dose rate, total dose of 10 Gy Images monochrome or color images at 550 TV lines / 50Hz Output Composite Light Sensitivity ≤ 25 lux at 90 ° (90 ° tilt range, 0 ° to the vertical downward direction) Pan angle (vertical plane) min. , Remote on / off switchable and dimmable 50 ° C Size from the TV table palástjától extent than ± 90 ° (180 ° scanning range, 0 ° to the vertical downward direction) 5 ° / sec 3x zoom, remote-controlled Auxiliary Light Outside, camera body Any condition not be greater than the drive rod after the TV cabinet TV table TV table palástjától extent, requires recording the periphery of the moving cable channels anchorage point-soluble multi-Cabling cable connection; foolproof, without any tools, easy, accurate, connect industrial stekkerekkel bending radius r Wiring ≤ 120mm hair with occasional agitation

Machines and apparatus for testing and measuring

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published March 10, 2017
Winner
CORWELD PLUS Kereskedelmi és Fővállalkozó Korlátolt Felelősségű Társaság
cpvs
38540000

The spent fuel pool and No. 1. Delivery inspection pit refrigeration tubing suitable for visual inspection equipment.

The transport device (s) number of contracting states to the diameter range up to 1-1 as test equipment must be suitable for the implementation of the task.

Acceptable also the realization is that when transporting multiple test equipment whose individual components are shared.

1 Unit 4 spent fuel pool 10-40TG01 (02) and marked No. 1 Developing a visual inspection pit 10-40TG03 marked cooling circuit pipelines of suitable equipment, manufactured, delivered, educating the management of the contracting unit staff (minimum four people) for.

The examination of the pipes can be carried out from the room, the other side of the pipe is not available.

It has the test device (s) must be a part in the presentation of the overall condition of the inner surfaces of the pipe system (pipes, bends, welds) capable, on the other hand, local material flaws that caused the massive failures or leakage of potentially cause can detect.

has the device (s) must meet the following conditions:

- The entire length of the pipelines (both horizontal and vertical sector) to move both forward and backward, should be able to move,

- The device is fitted to the existing Paks Nuclear Power Plant Zrt video system or contains elements for image recording,

- In case of failure in its entirety can be removed from the pipeline,

- The device (s) must be fitted with the size of the detected errors appear capable system (eg laser measurement software or a couple.)

- The camera can rotate 360 ​​° and min. +/- 100 ° tilt should be,

- Must be at the device (s) cold light LED lighting equipped as

- The camera should be able to beállni a specific position (in horizontal orientation adjacent pipe sections horizontally, or vertical orientation can give), which functions can be carried out cyclic command or operator, but in any event be suspended on the implementation,

- The ability to test underwater,

- The device (s) can display a three-dimensional position (trip distance), and the camera can display the angular position,

150 μGy / h dose radiation environment to operate correctly.

The pipe tested data:

10 (20,30,40) TG01 pipelines examination, examination of up to 50 m long pipe 8:

Size: Ø325x12 mm.

Material: austenitic steel.

8 m in length Ø273x11 mm narrowing.

The pipe tested data:

10 (20,30,40) TG02 examining pipelines, 8 up to 70 m long pipe investigation:

Size: Ø219x10 mm.

Material: austenitic steel.

3 m Ø159x6 mm narrowing.

The pipe tested data:

10 (20,30,40) TG03 pipelines, up to 50 m long pipe testing 8:

Size: Ø159x6 mm.

Material: austenitic steel.

1-4 Unit No. 1 Developing a visual inspection pit 10-40TG04 marked cooling circuit pipelines of suitable equipment, manufactured, delivered, educating management of the equipment, the contracting staff (minimum four people).

The examination of the pipes can be carried out from the room, the other side of the pipe is not available.

It has the test device (s) must be a part in the presentation of the overall condition of the inner surfaces of the pipe system (pipes, bends, welds) capable, on the other hand, local material flaws that caused the massive failures or leakage of potentially cause can detect.

has the device (s) must meet the following conditions:

- The entire length of the pipelines (both horizontal and vertical sector) to move both forward and backward, should be able to move,

- The device is fitted to the existing Paks Nuclear Power Plant Zrt video system or contains elements for image recording,

- In case of failure in its entirety can be removed from the pipeline,

- The device (s) must be fitted with the size of the detected errors appear capable system (eg laser measurement software or a couple.)

- The camera can rotate 360 ​​° and min. +/- 100 ° tilt should be,

- Must be at the device (s) cold light LED lighting equipped as

- The camera should be able to beállni a specific position (in horizontal orientation adjacent pipe sections horizontally, or vertical orientation can give), which functions can be carried out cyclic command or operator, but in any event be suspended on the implementation,

- The ability to test underwater,

- The device (s) can display a three-dimensional position (trip distance), and the camera can signal

Automatic transfer switch main circulating pumps, oil pumps Reconstruction - Contract award notice

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published March 2, 2016
Winner
VÁV UNION Vállalkozási és Szerelési Kft.
cpvs
45311000, 31200000, 31211310, 45310000, 71245000, 48921000

Export, as-built plans, pre-operating and maintenance instructions, and to produce Permits Hungarian.
Industrial IT network 4 pcs communications network switch is installed, install 4 pieces of ready-made network cabinet; installation of 4 x optical director, explaining optic cables; 4 director copper patch panel assembly; Change BSZG database.
0.4 kV primary and secondary-level device (not pre-mounted drawer design is not készülékcserés) conversion: 24 pieces of secondary distribution branch to branch reconstruction; 24 pieces of circuit breakers and replacement of sockets.
Electrical installation, commissioning activities: Breakdown of current operating systems; 8 pieces to build a complete PLC system (HART communication interface server); Production Plants PLC funkcióprábához full build test environments; Pressure build up to 32 analog; Replacing mode in 24 pieces vezénylőpultokon switch; development of new signs at 4 in vezénylőtáblákon; 8 design input DC distribution feeder; 8 távadóállvány pre-installation, installation ;, amendment to an existing scheme images, creating new images scheme; 16 basic valve breakdown, installation of new base valves; 8 junction box complete Installation.
Startup.
The maintenance, operational, technical staff.
  • 1